Tower locking cyl. rod on IR DM-M2 drill had stripped from the locking pin. Contract tech and IE were in the process of positioning the cyl. rod in preparation to weld the rod to the pin. As the contractor was controlling the movement of the cyl. the IE was aligning the rod and pin. IE had his right thumb in a pinch point resulting in an amputation.
Peabody Natural Resources CompanyMining Incidents in 2013
All MSHA-reportable accidents at Peabody Natural Resources Company operations in 2013. Fatalities appear first.
- Fatalities in 2013
- 0
- Total incidents
- 8
- Year
- 2013
Top incident classifications
- 01OTHER6 incidents
- 02HANDLING OF MATERIALS2 incidents
All incidents in 2013
Employee was removing a belly pan on a D11, the pan was resting on a jack. A passing mine employee asked if our employee needed help pulling the jack out from under the machine. While moving the jack the pan slid off of the jack falling on our employee's foot.
Initial audiometric test indicated a reportable STS shift. Retest was conducted and confirmed the condition. STS shift is being reported at this time and baseline will be revised. Employee no longer works for Peabody Energy, so no test will be conducted next year. Results will be sent to the individual by certified mail.
Initial audiometric test indicated a reportable STS shift. Employee was seen by an Audiologist between the initial test and retest. He was scheduled for surgery due to skin cancer in his right ear. Retest was conducted, but results were invalid due to medical condition. STS shift is being reported at this time and baseline will be revised.
Initial audiometric test indicated a reportable STS shift. Retest was conducted, but results were invalid. STS shift is being reported at this time and baseline will be revised.
Initial audiometric test indicated a reportable STS shift. Retest was conducted and confirmed the condition. STS shift is being reported at this time and baseline will be revised.
Initial audiometric test indicated a reportable STS shift. Retest was conducted, but results were invalid. STS shift is being reported at this time and baseline will be revised.
Initial audiometric test indicated a reportable STS shift. Due to employee's vacation/schedule a retest was not given. STS shift is being reported at this time and baseline will be revised.