ELECTRICAL TESTING WAS BEING DONE ON TEH 3 PHASE 480 VOLT CURCIT IN THE 001 SECTION POWER CENTER BY THE MINE ELECTRICAN THE VOLT METER USED BY THE ELECTRICAN WAS ON THE WRONG HOM SETTING WHICH CAUSED AN ELECTRIAL FLASH OVER WHEN THE LEADS WERE CONECTED A CROSS TWO PHASES OF THE 480 VOLT CURCIT THE ELECTRICAN RECEIVED SEVERE BURNS TO BOTH HANDS.
Search the record
Every injury and fatality MSHA has on file. Filter by state, year, sector, classification, experience, or any keyword from the investigator's narrative.
- Total incidents
- 739,207
- Of which fatal
- 3,111
- Years on record
- 1983–2026
- Classifications
- 20
Alert me on this search
Email me when a new incident matches these filters. One confirmation email; unsubscribe anytime.
2 total records
Showing all 2
Cedar Coal Company Inc · Flash burns (electric)
August 4, 1992
VA · Coal
roof bolter, rock bolter, pinner, mobile roof support operator (mrs)
MACHINERY
Cedar Coal Company Inc · Caught in, under or between a moving and a stationary object
85061S BOLTING WHEN THE JACK ON THE ATRS SPLIT. THE ATRS CAME DOWN ON HIM.
Showing all 2