15 de septiembre de 2010
CA · Metal/No metálico
Operador de bulldozer, Operador universal, Operador de equipo pesado, Ingeniero operador
EXPLOSIÓN DE RECIPIENTES A PRESIÓN
Sydney Peak Stone, Inc. · Contacto con objetos o sustancias calientes
During operator pre-shift inspection operator added coolant to dozer. After operator added coolant the radiator cap was not installed on properly. Operator at 1:00 p.m. noticed cap was on wrong. Operator shut off engine and tried to loosen radiator cap which resulted in hot coolant to be released.