Employee started feeling knee discomfort and unstableness while pulling cords during equipment teardown. Employee was prescribed physical therapy for string band strain. Injury was deemed work-related on 10/01/2024.
31 de agosto de 2022MN · Metal/No metálicoPeón de tierra, Operario de patioMANEJO DE MATERIALES
While securing a hydraulic line that was not in use it slipped and contacted the employee's mouth. This resulted in a small chip to a tooth. EE was seen at a dental office on 9/19/22 where it was determined to need repair.
9 de agosto de 2021MN · Metal/No metálicoTécnico de control de calidad, Técnico de laboratorio, Auxiliar de laboratorioMANEJO DE MATERIALES
EE was entering a module control tower when the door pinched his middle finger on right hand stitches were required.
11 de septiembre de 1998MN · Metal/No metálicoAlmacenista, Ensacador, Paletizador/Apilador, Encargado de almacén, Empacador, Fabricante, Operador de planta de lavadoMANEJO DE MATERIALES
EE WAS PICKING UP A SCREEN CLOTH WHEN HE TWISTED HS RIGHT KNEE.EE WENT BACK TO WORK THE SAME DAYBUT A WEK LATER HAD TO GO BACK TO THE DR WHICH TOLD HIM HE HAD TO HAVE SURGERY
27 de septiembre de 1994MN · Metal/No metálicoGerente de mina, Capataz de mina, Propietario de minaMANEJO DE MATERIALES
EE UPON LIFTING AND MOVING A STACKING CONVEYOR, THE CHAIN SLIPPED OFF THE BUCKET IT WAS ATTACHED TO, STRIKING HIM JUST ABOVE HIS LEFT EYE.
21 de junio de 1994MN · Metal/No metálicoAlmacenista, Ensacador, Paletizador/Apilador, Encargado de almacén, Empacador, Fabricante, Operador de planta de lavadoMANEJO DE MATERIALES
NEW CRUSHER LINER WAS BEING PUT RIGHT SIDE UP WHEN EMPLOYEE REACHED TO UT A BLOCK UDNERNEATH WHEN CHAIN SLIPPED AND CAUGHT HIS LEFT HAND BETWEEN LIENR AND BLOCK.
6 de abril de 1992MN · Metal/No metálicoObrero, Herrero, Cuadrilla, Mensajero de repuestos, Peón, Recolector, Operario de minaMANEJO DE MATERIALES
EMPLOYEE WAS WORKING AT THE MHN SHOP BECAUSE HIS REGULAR JOB AT THE PIT WAS NOT STARTED YET THIS SPRING.EMPLOYEE WAS LIFTING SOME HEAVY OBJECTS IN THE YARD WHEN HE HAD A GROIN PULL.
26 de septiembre de 1989MN · Metal/No metálicoEngrasador, Engrasador, Aceitero, Lubricador, Aceitero de dragalinaMANEJO DE MATERIALES
WHILE CLEANING OFF A ROCK IN THE TRAP-ANOTHER ROCK ROLLED DOWN THE BANKMENT AND LNDED ON HIS FOOT
20 de septiembre de 1983MN · Metal/No metálicoAlmacenista, Ensacador, Paletizador/Apilador, Encargado de almacén, Empacador, Fabricante, Operador de planta de lavadoMANEJO DE MATERIALES
HE WAS LIFTING A WOOD TIMBER TO PLACE UNDER CRUSHER WHEN HE FELT A PULL IN HIS BACK.
9 de marzo de 1983MN · Metal/No metálicoCapataz de planta de preparación, Supervisor, Supervisor de planta de molienda, Supervisor de hornoMANEJO DE MATERIALES