Mining Incidents
Muerte · Registro MSHA n.º 220223180015

Utility Man

5 de noviembre de 2022 a las 4:10 AM
Knoxville Cement Plant · Facility · Metal/Non-Metal
Knox Condado, TN
Clasificación OTRO
Tipo Atrapado en, bajo o entre material o edificaciones en colapso
Narrativa del investigador
Employee was operating front end loader in the coal shed. For unknown reasons employee left the loader and was engulfed in the coal pile near the grizzly bars for the feeding system.

Texto original en inglés de la MSHA

Investigación final de la MSHA
On November 5, 2022, at 4:10 a.m., Thomas Mitchell, a 21 year-old production utility miner with 13 months of experience, died when he was engulfed in a coal stockpile.The accident occurred because the mine operator did not: 1) conduct an adequate workplace examination in the coal shed before miners began work, and 2) prevent miners from positioning themselves over drawholes without platforms or safety lines.GENERAL INFORMATIONCEMEX Construction Materials Atlantic, LLC owns and operates the Knoxville Cement Plant mine. The Knoxville Cement Plant is a surface limestone mine and cement processing facility located in Knoxville, Knox County, Tennessee. The mine employs 134 miners and operates three eight-hour shifts, seven days per week. The mine drills and blasts limestone in an open pit quarry, and haul trucks transport the blasted material to a primary crusher. Belt conveyors transport the crushed rock to a secondary crusher and to the cement facility for final processing. The mine’s plant uses a coal-fired kiln to process cement. Coal is brought to the plant by contract coal trucks and is dumped in the coal shed. Miners use a front-end loader to dump coal onto the grizzly, located in the floor of the coal shed. The grizzly is a metal grate designed to slow the flow of coal and prevent large chunks of coal or foreign objects from entering the hopper below. Coal is fed from the hopper onto a belt conveyor and transported to coal silos. The principal management officials at the Knoxville Cement Plant mine at the time of the accident were:Steven Switzer Plant ManagerSarah Wagler Production ManagerJonathan Marlow Health & Safety ManagerTristan Wright Production SupervisorThe Mine Safety and Health Administration (MSHA) completed the last regular safety and health inspection at this mine on September 20, 2022. The 2021 non-fatal days lost incident rate for the Knoxville Cement Plant mine was 2.94, compared to the national average of 1.70 for mines of this type.

Lee el informe completo (PDF)

Hallazgos del informe final de investigación de la MSHA, que sustituye la narrativa preliminar anterior.

Detalles del registro
Actividad al momento del incidente
Walking, Running
Subunidad / ubicación
MILL OPERATION/PREPARATION PLANT
Tipo de accidente
Atrapado en, bajo o entre material o edificaciones en colapso
Fuente de la lesión
BROKEN ROCK,COAL,ORE,WSTE
Naturaleza de la lesión
SUFFOC,SMOK INHILAT,DROWN
Parte del cuerpo afectada
BODY SYSTEMS
Experiencia minera total
1 year
Experiencia en esta mina
1 year
Experiencia en este puesto
0 years
Grado de la lesión
FATALITY
Verificar en MSHA

Cada registro de esta página refleja lo que publica la MSHA en su programa de Datos Abiertos del Gobierno, actualizado semanalmente. La MSHA no publica URLs por accidente (los datos de Accidentes se distribuyen en un único archivo masivo), así que esta es la forma de recuperar la fuente del registro específico a continuación:

Fuente: Administración de Seguridad y Salud Minera de EE. UU. (MSHA) · Documento 220223180015 · ID de mina 4000840 Vista de capacitación →