EE was running a 270 tractor that pulls coal in a ram car and had made a turn thru an intersection and had his right arm hanging out of the deck and over the bumper when the ram car bumped out against the tractor bumper it mashed his arm in between the two resulting in an injury he didn't think he hurt it but it started to swell up and decided to get it checked.
Mine No. 2 Coal
Mine No. 2 tiene $54K en multas propuestas de MSHA y $14K pendientes en 0 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en Mine No. 2.
- Muertes
- 0
- Incidentes totales
- 4
- Años en registro
- 2009–2012
- Último incidente
- Nov 2012
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.Mine No. 2 tiene $54K en multas propuestas de MSHA y $14K pendientes en 0 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.El muestreo de MSHA en Mine No. 2 muestra un polvo respirable de carbon promedio de 0.54 mg/m3 (92% en cumplimiento) en 277 muestras.
ⓘ
Una muestra es una medicion de cumplimiento en un momento dado, no un historial de exposicion individual. Estas cifras describen registros de muestreo de MSHA y no establecen causalidad ni dosis personal.ⓘ
Las cifras de polvo respirable de carbon y silice corresponden a instalaciones de carbon. El cumplimiento del polvo se mide frente a la norma actual de 1.5 mg/m3; se incluyen muestras anteriores a la norma de 2014, por lo que las tasas de cumplimiento son una senal historica aproximada.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2015 Q4 | 0 | 0 | 0 | |
| 2015 Q3 | 0 | 0 | 0 | |
| 2015 Q2 | 0 | 0 | 0 | |
| 2015 Q1 | 2,289 | 0 | 0 | 0.0 |
| 2014 Q4 | 4,996 | 8 | 3 | 1601.3 |
| 2014 Q3 | 4,956 | 10 | 0 | 2017.8 |
| 2014 Q2 | 5,254 | 14 | 1 | 2664.6 |
| 2014 Q1 | 4,717 | 8 | 0 | 1696.0 |
Mostrar 25 trimestres anteriores Ocultar trimestres anteriores
| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2013 Q4 | 5,233 | 6 | 0 | 1146.6 |
| 2013 Q3 | 5,062 | 13 | 4 | 2568.2 |
| 2013 Q2 | 4,716 | 4 | 0 | 848.2 |
| 2013 Q1 | 4,442 | 9 | 0 | 2026.1 |
| 2012 Q4 | 4,587 | 3 | 0 | 654.0 |
| 2012 Q3 | 4,925 | 9 | 4 | 1827.4 |
| 2012 Q2 | 4,724 | 10 | 0 | 2116.9 |
| 2012 Q1 | 4,446 | 11 | 1 | 2474.1 |
| 2011 Q4 | 3,616 | 13 | 1 | 3595.1 |
| 2011 Q2 | 2,937 | 16 | 1 | 5447.7 |
| 2011 Q1 | 2,253 | 8 | 0 | 3550.8 |
| 2010 Q4 | 2,166 | 9 | 1 | 4155.1 |
| 2010 Q3 | 2,572 | 6 | 0 | 2332.8 |
| 2010 Q2 | 6,990 | 2 | 0 | 286.1 |
| 2010 Q1 | 1,828 | 13 | 2 | 7111.6 |
| 2009 Q4 | 2,516 | 18 | 8 | 7154.2 |
| 2009 Q3 | 2,598 | 15 | 3 | 5773.7 |
| 2009 Q2 | 2,492 | 22 | 5 | 8828.3 |
| 2009 Q1 | 2,273 | 7 | 0 | 3079.6 |
| 2008 Q4 | 1,914 | 6 | 4 | 3134.8 |
| 2008 Q3 | 2,100 | 7 | 3 | 3333.3 |
| 2008 Q2 | 622 | 13 | 2 | 20900.3 |
| 2007 Q1 | 1,510 | 17 | 8 | 11258.3 |
| 2006 Q4 | 420 | 0 | 0 | 0.0 |
| 2006 Q3 | 0 | 0 | 0 |
Incidentes reportables
4 en archivo2012 · 3 incidentes
We were taking a 10' cut by 16' wide out of #5 heading where we were going under a hollow and as we were cleaning up the cut I saw some of the top drip from the rib and we stopped and backed miner out and was going to set some cribs but in about 10 mins. it started to fall from the face out.
We were starting a cut in #7 heading and was cutting 10' on right side (curtain side) on blowing vent. When the right corner cut thru into a unknown old mine, there was some water every-one evacuated no one was hurt and no equipment was damaged no ch4 or bad air was in old mine.
2009 · 1 incidente
After taking a cut right hand break out of the #7 entry the miner moved to another cut and the bolter operater seen the place was working and backed the bolter out and called for the boss and the place started working more and then fell starting from the inter into the right brk. they had just started the fall was approx. 8 ft wide, 4-5 ft thick and about 25 ft long.
The full compliance file on Mine No. 2
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.