Spoil side highwall sloughed off due to unstable material (sand and water). The area was accessible at the time of slide. MSHA was called and a 103(j) order was issued. Upon arrival, MSHA inspector modified the initial order and a 103(k) order was issued. Dozers were allowed to slope and stabilize the area and the 103(k) order was terminated.
Turlington Strip Mine Coal
Turlington Strip Mine tiene $9K en multas propuestas de MSHA y $0 pendientes en 4 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en Turlington Strip Mine.
- Muertes
- 0
- Incidentes totales
- 5
- Años en registro
- 2010–2011
- Último incidente
- Sep 2011
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.Turlington Strip Mine tiene $9K en multas propuestas de MSHA y $0 pendientes en 4 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.El muestreo de MSHA en Turlington Strip Mine muestra un polvo respirable de carbon promedio de 0.10 mg/m3 (100% en cumplimiento) en 10 muestras.
ⓘ
Una muestra es una medicion de cumplimiento en un momento dado, no un historial de exposicion individual. Estas cifras describen registros de muestreo de MSHA y no establecen causalidad ni dosis personal.ⓘ
Las cifras de polvo respirable de carbon y silice corresponden a instalaciones de carbon. El cumplimiento del polvo se mide frente a la norma actual de 1.5 mg/m3; se incluyen muestras anteriores a la norma de 2014, por lo que las tasas de cumplimiento son una senal historica aproximada.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2011 Q3 | 109,117 | 25 | 5 | 229.1 |
| 2011 Q2 | 94,815 | 0 | 0 | 0.0 |
| 2011 Q1 | 41,730 | 0 | 0 | 0.0 |
Incidentes reportables
5 en archivo2011 · 4 incidentes
Electrician picked a piece of dragline cable up and the wind blew sand in his eyes. The employee flushed his right eye out with a first-aid eye wash, but was still a little scratchy. Employee was taken to the Emergency Room and was diagnosed with conjuctivitis, caused by an allergic reaction from the sand. He was given two prescriptions for his eyes.
A dozer operator making shift change encountered a hard spot in a high wall. The dozer became slightly offset with the highwall lost power and could not back up the slope. The dozer operator was assisted up the slope with no injuries. He was in the dozer less than 10 minutes. This 7000-1 is filed in protest arising from a citation issued for failing to report under 50.10(c).
Cat 777D end dump was being loaded by an EX1900 Hitachi. Hitachi operator was blinded by the sun momentarily and the bucket of the backhoe hit the back of the end dump jarring the end dump operators neck. He was diagnosed with muscle spasms and a muscle strain of the neck and received two days of at home rest starting 3/1/11. This met the criteria for an MSHA recordable.
2010 · 1 incidente
A Miner was removing a clevis from a section of damaged wire rope and was struck in the nose when he pulled out the clevis pin. No medical treatment was needed other that First Aid and a tetnus shot. X-ray did show a small crack.
The full compliance file on Turlington Strip Mine
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.