Belt was turned off. Rock was stuck under belt. EE was using a bar to hit rock to try to knock thru the other side. Rock broke loose & EE's right hand got stuck under belt. A co-worker had to cut the belt to get EE's hand loose. EE was able to move all fingers but was really sore. Went to hospital to have x-rays to check for broken bones. Had swelling & bruising.
Burbank Materials LLC Metal/Non-Metal
Burbank Materials LLC tiene $60K en multas propuestas de MSHA y $3K pendientes en 2 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en Burbank Materials LLC.
- Muertes
- 0
- Incidentes totales
- 5
- Años en registro
- 2009–2019
- Último incidente
- Dec 2019
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.Burbank Materials LLC tiene $60K en multas propuestas de MSHA y $3K pendientes en 2 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 4,434 | 0 | 0 | 0.0 |
| 2025 Q3 | 4,494 | 0 | 0 | 0.0 |
| 2025 Q2 | 4,245 | 5 | 1 | 1177.9 |
| 2025 Q1 | 3,985 | 0 | 0 | 0.0 |
| 2024 Q4 | 4,014 | 4 | 0 | 996.5 |
| 2024 Q3 | 3,837 | 4 | 1 | 1042.5 |
| 2024 Q2 | 4,750 | 0 | 0 | 0.0 |
| 2024 Q1 | 5,426 | 7 | 1 | 1290.1 |
Mostrar 59 trimestres anteriores Ocultar trimestres anteriores
| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 5,310 | 0 | 0 | 0.0 |
| 2023 Q3 | 4,370 | 0 | 0 | 0.0 |
| 2023 Q2 | 5,120 | 3 | 0 | 585.9 |
| 2023 Q1 | 4,717 | 0 | 0 | 0.0 |
| 2022 Q4 | 5,212 | 0 | 0 | 0.0 |
| 2022 Q3 | 5,105 | 0 | 0 | 0.0 |
| 2022 Q2 | 3,974 | 1 | 1 | 251.6 |
| 2022 Q1 | 4,956 | 2 | 1 | 403.6 |
| 2021 Q4 | 5,211 | 0 | 0 | 0.0 |
| 2021 Q3 | 4,602 | 2 | 0 | 434.6 |
| 2021 Q2 | 4,642 | 0 | 0 | 0.0 |
| 2021 Q1 | 3,317 | 0 | 0 | 0.0 |
| 2020 Q4 | 3,304 | 6 | 2 | 1816.0 |
| 2020 Q3 | 3,993 | 0 | 0 | 0.0 |
| 2020 Q2 | 5,452 | 4 | 3 | 733.7 |
| 2020 Q1 | 5,348 | 4 | 0 | 747.9 |
| 2019 Q4 | 4,525 | 0 | 0 | 0.0 |
| 2019 Q3 | 4,304 | 0 | 0 | 0.0 |
| 2019 Q2 | 4,499 | 2 | 1 | 444.5 |
| 2019 Q1 | 4,775 | 0 | 0 | 0.0 |
| 2018 Q4 | 4,360 | 6 | 4 | 1376.1 |
| 2018 Q3 | 4,740 | 4 | 0 | 843.9 |
| 2018 Q2 | 4,695 | 0 | 0 | 0.0 |
| 2018 Q1 | 4,145 | 5 | 0 | 1206.3 |
| 2017 Q4 | 3,974 | 0 | 0 | 0.0 |
| 2017 Q3 | 4,116 | 0 | 0 | 0.0 |
| 2017 Q2 | 4,311 | 2 | 0 | 463.9 |
| 2017 Q1 | 3,812 | 5 | 5 | 1311.6 |
| 2016 Q4 | 3,683 | 0 | 0 | 0.0 |
| 2016 Q3 | 4,137 | 4 | 3 | 966.9 |
| 2016 Q2 | 4,140 | 0 | 0 | 0.0 |
| 2016 Q1 | 5,180 | 1 | 1 | 193.1 |
| 2015 Q4 | 4,706 | 0 | 0 | 0.0 |
| 2015 Q3 | 6,275 | 0 | 0 | 0.0 |
| 2015 Q2 | 6,611 | 8 | 5 | 1210.1 |
| 2015 Q1 | 6,339 | 0 | 0 | 0.0 |
| 2014 Q4 | 8,489 | 8 | 1 | 942.4 |
| 2014 Q3 | 8,819 | 16 | 7 | 1814.3 |
| 2014 Q2 | 8,389 | 0 | 0 | 0.0 |
| 2014 Q1 | 7,663 | 5 | 1 | 652.5 |
| 2013 Q4 | 8,851 | 0 | 0 | 0.0 |
| 2013 Q3 | 8,264 | 0 | 0 | 0.0 |
| 2013 Q2 | 7,406 | 4 | 0 | 540.1 |
| 2013 Q1 | 7,124 | 0 | 0 | 0.0 |
| 2012 Q4 | 6,114 | 3 | 1 | 490.7 |
| 2012 Q3 | 5,940 | 4 | 2 | 673.4 |
| 2012 Q2 | 5,822 | 0 | 0 | 0.0 |
| 2012 Q1 | 5,323 | 7 | 0 | 1315.0 |
| 2011 Q4 | 4,546 | 0 | 0 | 0.0 |
| 2011 Q3 | 5,151 | 0 | 0 | 0.0 |
| 2011 Q2 | 5,148 | 6 | 1 | 1165.5 |
| 2011 Q1 | 2,934 | 0 | 0 | 0.0 |
| 2010 Q4 | 4,316 | 11 | 5 | 2548.7 |
| 2010 Q3 | 3,276 | 0 | 0 | 0.0 |
| 2010 Q2 | 3,459 | 5 | 1 | 1445.5 |
| 2010 Q1 | 2,347 | 0 | 0 | 0.0 |
| 2009 Q4 | 4,877 | 3 | 3 | 615.1 |
| 2009 Q3 | 4,654 | 4 | 0 | 859.5 |
| 2009 Q2 | 452 | 0 | 0 | 0.0 |
Incidentes reportables
5 en archivo2019 · 1 incidente
2014 · 3 incidentes
EE was working on the left track pin on a 350 Trackhoe with two ratchet booms, one on each side of the track. Co-worker then tapped one of the pins, and the ratchet boom came off at that time and struck EE in the Left eye/bridge of the nose.
Was taking guard off of screen plant and had to reach behind it to take a bolt off. When removing bolt, the front of the screen came loose and the back end swung and pinched finger between screen and frame, lacerating left pointer finger to the bone.
Stress/Anxiety Attack
2009 · 1 incidente
Injured employee was replacing a bearing on plant when he accidentally smashed the outside of his right hand. Mine supervisor took him to the local hospital to be checked out. The hospital wrapped his hand with an ace bandage and the employee returned to work.
The full compliance file on Burbank Materials LLC
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.