citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 345 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
3163 has $2K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$2K
proposed penalties
$2K
current assessed
$2K
paid to date
$0
outstanding
13 assessments are final orders; 1 contested dockets.
Of $577 in penalties contested before the Commission, $577 was upheld in final decisions.
As of the most recent assessment on 2011-09-30.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
2citations taken to the federal commission · 13% of citations on record
Stood as issued
2 · 100%
100%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 1 decided S&S contests · industry: 79%
0%
Penalty reduction in decided contests
$577 proposed, $577 after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2009-02-10.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
MSHA sampling at 3163 shows 100% of 19 respirable coal dust samples met the 1.5 mg/m3 standard.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2021-05-17, 5 years ago
100%
within 1.5 mg/m3
19
samples
0.42
dust max (mg/m3)
0
over MSHA ECV
ⓘThe excessive concentration value (ECV) is MSHA's own per-sample enforcement threshold, which builds in measurement uncertainty; a sample over its ECV can trigger a citation. The count covers only samples MSHA assigned an ECV.
16 samples taken by MSHA inspectors, 3 by the operator.
Most-sampled occupations
AUGER OPERATOR9
AUGER HELPER8
COAL TRUCK DRIVER2
Noise
ⓘThe share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Health sampling trend
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust by year
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
ⓘCoal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.
Year
Employees
Coal produced (tons)
2023
0
2022
0
2021
1
940
2020
1
1,355
2019
2
3,705
2015
0
2014
1
7,166
2013
0
574
2012
0
2011
0
2010
3
11,686
2009
1
2008
3
3,622
2007
0
2006
1
2,448
2005
4
12,708
2004
3
13,132
Source: MSHA quarterly employment and production, updated weekly.
3163 sits in Somerset County, Pennsylvania, where the Census mining category is 1.6% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Somerset County, Pennsylvania · Population 73,255
1.6%
Mining share of county employment
$59,378
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2023 Q4
0
0
0
2023 Q3
0
0
0
2023 Q2
0
0
0
2023 Q1
0
0
0
2022 Q4
0
0
0
2022 Q3
0
0
0
2022 Q2
0
0
0
2022 Q1
0
0
0
Show 55 earlier quartersHide earlier quarters
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2021 Q4
0
0
0
2021 Q3
0
0
0
2021 Q2
144
0
0
0.0
2021 Q1
0
0
0
2020 Q4
0
0
0
2020 Q3
0
0
0
2020 Q2
0
0
0
2020 Q1
264
0
0
0.0
2019 Q4
0
0
0
2019 Q3
408
0
0
0.0
2019 Q2
184
0
0
0.0
2015 Q4
0
0
0
2015 Q3
0
0
0
2015 Q2
0
0
0
2015 Q1
0
0
0
2014 Q4
176
0
0
0.0
2014 Q3
304
0
0
0.0
2014 Q2
285
0
0
0.0
2014 Q1
155
0
0
0.0
2013 Q4
54
0
0
0.0
2013 Q3
0
0
0
2013 Q2
0
0
0
2013 Q1
0
0
0
2012 Q4
0
0
0
2012 Q3
0
0
0
2012 Q2
0
0
0
2012 Q1
0
0
0
2011 Q4
0
0
0
2011 Q3
0
2
0
2011 Q2
0
0
0
2011 Q1
0
0
0
2010 Q4
65
2
0
30769.2
2010 Q3
1,542
3
2
1945.5
2010 Q2
2,337
0
0
0.0
2010 Q1
454
4
1
8810.6
2009 Q4
0
0
0
2009 Q1
132
0
0
0.0
2008 Q4
625
2
1
3200.0
2008 Q3
348
0
0
0.0
2007 Q4
0
0
0
2007 Q3
0
0
0
2007 Q2
0
0
0
2007 Q1
0
0
0
2006 Q4
0
0
0
2006 Q3
0
0
0
2006 Q2
0
0
0
2006 Q1
400
0
0
0.0
2005 Q4
745
0
0
0.0
2005 Q3
953
0
0
0.0
2005 Q2
1,484
0
0
0.0
2005 Q1
991
0
0
0.0
2004 Q4
959
0
0
0.0
2004 Q3
946
0
0
0.0
2004 Q2
975
0
0
0.0
2004 Q1
995
3
0
3015.1
No fatalities recorded at this mine.
Reportable incidents
1 on file
2009 · 1 incident
March 13, 2009PA · Coallaborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitmanSLIP OR FALL OF PERSON
Injury slipped and fell on 3/13/09 at 3:00 pm. He was picking up auger equipment to bring back to the garage for repairs. He fell on the flighting of the auger. He was hurt but did not go to the hospital. He was not better in 1 week. So he went for x-rays at Punxatary Hospital on 3/20/09. He has a cracked rib.
Related mines
Other mines operated by E.E. & S. Auger Mining Inc.