Employee was scaling in a scaler when the cab lift cylinder bolt sheered off causing the cab to drop suddenly jarring employee in the cab. It fell approximately 13 inches where it hit a cab bumper block. The employee claimed to have a sore back and neck. The supervisor took the employee to the clinic and was diagnosed with a strained lower back and neck with restrictions.
Bolingbrook Underground: 155 citaciones de la MSHA Metal/Non-Metal
Bolingbrook Underground tiene $29K en multas propuestas de MSHA y $46 pendientes en 10 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en Bolingbrook Underground.
- Muertes
- 0
- Incidentes totales
- 7
- Años en registro
- 2007–2019
- Último incidente
- Oct 2019
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.Bolingbrook Underground tiene $29K en multas propuestas de MSHA y $46 pendientes en 10 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.ⓘ
Las proporciones se calculan sobre las citaciones que llevan la codificación de gravedad y negligencia de la MSHA; una pequeña parte de los registros no está codificada.ⓘ
Impugnar una citación ante la Comisión Federal de Revisión de Seguridad y Salud Minera es un derecho legal. Estas cifras presentan los resultados públicos de ese proceso, según el archivo de Violaciones Impugnadas de MSHA.- Conciliadas 31 · 82%
- Quedaron como emitidas 1 · 3%
- Anuladas o retiradas 6 · 16%
ⓘ
Una citación Significativa y Sustancial cuenta como sobreviviente cuando la conciliación o la decisión del juez mantuvo la designación, o cuando la impugnación fue desestimada o quedó en rebeldía y la citación quedó como emitida. Las citaciones anuladas o retiradas, y las conciliaciones que quitaron la designación, cuentan en contra.ⓘ
Una reducción o desestimación ante la Comisión es un resultado legítimo de impugnar una multa propuesta. Las cifras son el monto propuesto y el monto confirmado en la decisión del expediente.| Expediente | Decisión | Juez | Año | Propuesta / confirmada |
|---|---|---|---|---|
| LAKE 2017-0296 | Settlement | Moran | 2018 | $4K → $1K |
| LAKE 2016-0005 | Settlement | Miller | 2016 | $3K → $3K |
| LAKE 2014-123M | Settlement | Barbour | 2014 | $2K → $460 |
| LAKE 2016-0327 | Settlement | Gill | 2016 | $2K → $2K |
| LAKE 2010-872M | Settlement | Zielinski | 2011 | $540 → $100 |
| LAKE 2011-143M | Default | Lesnick | 2011 | $540 → $540 |
ⓘ
Una muestra es una medición de cumplimiento en un momento dado, no un historial de exposición individual. Estas cifras describen registros de muestreo de MSHA y no establecen causalidad ni dosis personal.Contaminantes en minas de metal y no metal (muestras personales)
ⓘ
Muchas muestras son mediciones de detección de sustancias sin límite de exposición aplicable; se cuentan como muestras pero se excluyen de toda cifra de exceso. Los porcentajes de exceso usan solo muestras con límite establecido.
Última medición: 2025-09-16
ⓘ
Muchas muestras son mediciones de detección de sustancias sin límite de exposición aplicable; se cuentan como muestras pero se excluyen de toda cifra de exceso. Los porcentajes de exceso usan solo muestras con límite establecido.- Diesel particulate (total carbon)394 en exceso
- Nuisance dust, respirable, <1% Qtz11
- Respirable dust, <.1mg8
- TC as EC @ 3507
Ver los análisis individuales (100)
| Fecha | Contaminante | Concentración | Límite | Conc / límite | Ocupación |
|---|---|---|---|---|---|
| 2016-10-05 | TC @ 160 | 206 | 160 | 1.29 | Blaster, Powder Gang |
| 2016-10-05 | TC from EC @ 160 | 196 | 160 | 1.23 | Blaster, Powder Gang |
| 2011-05-17 | TC @ 160 | 180 | 160 | 1.13 | Crusher Oper/Worker |
| 2009-06-03 | TC @ 160 | 266 | 160 | 1.66 | Roof Bolter, Rock |
| 2009-06-03 | TC @ 160 | 184 | 160 | 1.15 | Blaster, Powder Gang |
| 2025-09-16 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2019-05-22 | Nuisance dust, respirable, <1% Qtz | 0.25 | 10 | 0.03 | Utility Man |
| 2019-05-22 | Quartz, respirable, >1% Qtz | 0.13 | Utility Man | ||
| 2019-05-22 | Nuisance dust, total, <1% Qtz | 0.38 | 10 | 0.04 | Utility Man |
| 2019-03-13 | TC @ 160 | 55 | 160 | 0.34 | Blaster, Powder Gang |
| 2019-03-13 | EC @ 160 | 31 | 160 | 0.19 | Blaster, Powder Gang |
| 2019-03-13 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2019-03-13 | TC @ 160 | 58 | 160 | 0.36 | Blaster, Powder Gang |
| 2019-03-13 | EC @ 160 | 31 | 160 | 0.19 | Blaster, Powder Gang |
| 2019-03-13 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2018-06-06 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2018-06-06 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2018-06-06 | TC @ 160 | 70 | 160 | 0.44 | Drill Helper |
| 2018-06-06 | EC @ 160 | 41 | 160 | 0.26 | Drill Helper |
| 2018-06-06 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Helper |
| 2018-06-06 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2018-06-06 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2018-06-06 | EC @ 160 | 38 | 160 | 0.24 | Blaster, Powder Gang |
| 2018-06-06 | TC @ 160 | 72 | 160 | 0.45 | Blaster, Powder Gang |
| 2016-10-05 | EC @ 160 | 144 | 160 | 0.90 | Blaster, Powder Gang |
| 2016-10-05 | TC @ 160 | 38 | 160 | 0.24 | Truck Driver |
| 2016-10-05 | EC @ 160 | 31 | 160 | 0.19 | Truck Driver |
| 2016-10-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2016-10-05 | TC @ 160 | 126 | 160 | 0.79 | Roof Bolter, Rock |
| 2016-10-05 | EC @ 160 | 98 | 160 | 0.61 | Roof Bolter, Rock |
| 2016-10-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2016-10-05 | TC @ 160 | 28 | 160 | 0.18 | Front-end Loader Operator |
| 2016-10-05 | EC @ 160 | 23 | 160 | 0.14 | Front-end Loader Operator |
| 2016-10-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2016-10-05 | TC @ 160 | 2 | 160 | 0.01 | Scaling (mechanical) |
| 2016-10-05 | EC @ 160 | 2 | 160 | 0.01 | Scaling (mechanical) |
| 2016-10-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2016-10-05 | Quartz, respirable, >1% Qtz | 0.35 | 2.26 | 0.15 | Truck Driver |
| 2016-10-05 | Nuisance dust, respirable, <1% Qtz | 0.7 | 10 | 0.07 | Crusher Oper/Worker |
| 2016-10-04 | Respirable dust, <.1mg | 0 | Utility Man | ||
| 2016-10-04 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2016-10-04 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2016-10-04 | Nuisance dust, respirable, <1% Qtz | 0.12 | 10 | 0.01 | Cleanup Man |
| 2015-11-18 | TC @ 160 | 81 | 160 | 0.51 | Blaster, Powder Gang |
| 2015-11-18 | EC @ 160 | 51 | 160 | 0.32 | Blaster, Powder Gang |
| 2015-11-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2015-11-18 | TC @ 160 | 3 | 160 | 0.02 | Roof Bolter, Rock |
| 2015-11-18 | EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2015-11-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2015-09-10 | TC @ 160 | 33 | 160 | 0.21 | Front-end Loader Operator |
| 2015-09-10 | EC @ 160 | 27 | 160 | 0.17 | Front-end Loader Operator |
| 2015-09-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2015-09-10 | TC @ 160 | 36 | 160 | 0.23 | Scaling (mechanical) |
| 2015-09-10 | EC @ 160 | 33 | 160 | 0.21 | Scaling (mechanical) |
| 2015-09-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2015-09-10 | TC @ 160 | 116 | 160 | 0.73 | Roof Bolter, Rock |
| 2015-09-10 | EC @ 160 | 95 | 160 | 0.59 | Roof Bolter, Rock |
| 2015-09-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2014-06-04 | TC @ 160 | 115 | 160 | 0.72 | Blaster, Powder Gang |
| 2014-06-04 | EC @ 160 | 83 | 160 | 0.52 | Blaster, Powder Gang |
| 2014-06-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2014-06-04 | TC @ 160 | 12 | 160 | 0.08 | Front-end Loader Operator |
| 2014-06-04 | EC @ 160 | 7 | 160 | 0.04 | Front-end Loader Operator |
| 2014-06-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2014-06-04 | TC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2014-06-04 | EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2014-06-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2013-08-07 | TC @ 160 | 28 | 160 | 0.18 | Roof Bolter, Mounted |
| 2013-08-07 | EC @ 160 | 28 | 160 | 0.18 | Roof Bolter, Mounted |
| 2013-08-07 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2012-07-18 | EC @ 160 | 7 | 160 | 0.04 | Scaling (mechanical) |
| 2012-07-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2012-07-18 | TC @ 160 | 12 | 160 | 0.08 | Scaling (mechanical) |
| 2012-07-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2012-07-18 | EC @ 160 | 14 | 160 | 0.09 | Truck Driver |
| 2012-07-18 | TC @ 160 | 21 | 160 | 0.13 | Truck Driver |
| 2012-07-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2012-07-18 | EC @ 160 | 8 | 160 | 0.05 | Front-end Loader Operator |
| 2012-07-18 | TC @ 160 | 10 | 160 | 0.06 | Front-end Loader Operator |
| 2012-07-18 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2012-07-18 | EC @ 160 | 34 | 160 | 0.21 | Roof Bolter, Rock |
| 2012-07-18 | TC @ 160 | 56 | 160 | 0.35 | Roof Bolter, Rock |
| 2011-11-30 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2011-11-30 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2011-11-30 | Nuisance dust, respirable, <1% Qtz | 0.16 | 10 | 0.02 | Laborer, Bullgang |
| 2011-11-30 | Nuisance dust, respirable, <1% Qtz | 0.14 | 10 | 0.01 | Laborer, Bullgang |
| 2011-05-18 | Nuisance dust, respirable, <1% Qtz | 0.66 | 10 | 0.07 | Building Repair/Maint. |
| 2011-05-18 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2011-05-18 | Nuisance dust, respirable, <1% Qtz | 0.21 | 10 | 0.02 | Laborer, Bullgang |
| 2011-05-17 | EC @ 160 | 23 | 160 | 0.14 | Blaster, Powder Gang |
| 2011-05-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2011-05-17 | TC @ 160 | 3 | 160 | 0.02 | Front-end Loader Operator |
| 2011-05-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2011-05-17 | EC @ 160 | 3 | 160 | 0.02 | Front-end Loader Operator |
| 2011-05-17 | EC @ 160 | 96 | 160 | 0.60 | Crusher Oper/Worker |
| 2011-05-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2011-05-17 | TC @ 160 | 53 | 160 | 0.33 | Drill Operator, Jumbo Perc. |
| 2011-05-17 | EC @ 160 | 21 | 160 | 0.13 | Drill Operator, Jumbo Perc. |
| 2011-05-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2011-05-17 | TC @ 160 | 43 | 160 | 0.27 | Blaster, Powder Gang |
Muestras de área (aire de molino y taller)
Última medición: 2016-10-05, hace 9 añosVer los análisis individuales (6)
| Fecha | Contaminante | Concentración | Límite | Conc / límite | Área muestreada |
|---|---|---|---|---|---|
| 2016-10-05 | TC from EC @ 160 | 0 | UG TRAVEL/HAULAGE A | ||
| 2016-10-05 | EC @ 160 | 186 | UG TRAVEL/HAULAGE A | ||
| 2016-10-05 | TC @ 160 | 252 | UG TRAVEL/HAULAGE A | ||
| 2009-06-03 | TC from EC @ 160 | 0 | BASE OF VENTILATION | ||
| 2009-06-03 | EC @ 160 | 165 | BASE OF VENTILATION | ||
| 2009-06-03 | TC @ 160 | 212 | BASE OF VENTILATION |
Bolingbrook Underground registró 0.00 casos de lesión reportables por cada 100 trabajadores a tiempo completo en 2020.
ⓘ
Esta tasa son los casos de lesión reportables por cada 100 trabajadores a tiempo completo por año, calculada como 200,000 por los casos dividido entre las horas-empleado reportadas por el operador a la MSHA. Los casos son lesiones que la MSHA clasificó en grado 01 a 07; se excluyen los eventos de solo accidente que no lesionaron a nadie, y también las lesiones de contratistas, cuyas horas no corresponden a una sola mina. Las tasas comienzan en el año 2000, cuando inicia el reporte trimestral de empleo, y se omiten por debajo de 20,000 horas en un año.| Año | tasa de casos totales | días perdidos | mortales |
|---|---|---|---|
| 2020 * | 0.00 | 0.00 | 0.000 |
| 2019 * | 4.47 | 0.00 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
| 2017 * | 0.00 | 0.00 | 0.000 |
| 2016 * | 0.00 | 0.00 | 0.000 |
| 2015 * | 0.00 | 0.00 | 0.000 |
| 2014 * | 0.00 | 0.00 | 0.000 |
| 2013 * | 0.00 | 0.00 | 0.000 |
- Vulcan Construction Materials, LLC 2005 al presente
| Año | Empleados |
|---|---|
| 2026 | 6 |
| 2025 | 5 |
| 2024 | 5 |
| 2023 | 4 |
| 2022 | 4 |
| 2021 | 4 |
| 2020 | 21 |
| 2019 | 22 |
| 2018 | 18 |
| 2017 | 22 |
| 2016 | 26 |
| 2015 | 27 |
| 2014 | 26 |
| 2013 | 20 |
| 2012 | 24 |
| 2011 | 22 |
| 2010 | 25 |
| 2009 | 24 |
| 2008 | 30 |
| 2007 | 29 |
| 2006 | 28 |
| 2005 | 10 |
Bolingbrook Underground se ubica en Will County, Illinois, donde la categoría minera del Censo representa el 0.1% del empleo del condado.
ⓘ
Las cifras del condado provienen de la Encuesta sobre la Comunidad Estadounidense de la Oficina del Censo de EE. UU., estimaciones quinquenales agrupadas, por lo que la edición de 2023 abarca de 2019 a 2023. La categoría del Censo es 'minería, explotación de canteras y extracción de petróleo y gas', que es más amplia que la jurisdicción de la MSHA e incluye a trabajadores de petróleo y gas que ninguna mina emplea. Estas cifras describen el condado circundante, no esta mina, y no son un factor en ningún incidente específico.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 1,604 | 0 | 0 | 0.0 |
| 2026 Q1 | 1,927 | 0 | 0 | 0.0 |
| 2025 Q4 | 2,418 | 0 | 0 | 0.0 |
| 2025 Q3 | 2,086 | 0 | 0 | 0.0 |
| 2025 Q2 | 2,015 | 0 | 0 | 0.0 |
| 2025 Q1 | 1,927 | 0 | 0 | 0.0 |
| 2024 Q4 | 2,095 | 0 | 0 | 0.0 |
| 2024 Q3 | 1,800 | 0 | 0 | 0.0 |
Mostrar 75 trimestres anteriores Ocultar trimestres anteriores
| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 2,241 | 1 | 0 | 446.2 |
| 2024 Q1 | 403 | 0 | 0 | 0.0 |
| 2023 Q4 | 68 | 4 | 0 | 58823.5 |
| 2023 Q3 | 67 | 0 | 0 | 0.0 |
| 2023 Q2 | 46 | 0 | 0 | 0.0 |
| 2023 Q1 | 95 | 3 | 0 | 31578.9 |
| 2022 Q4 | 19 | 0 | 0 | 0.0 |
| 2022 Q3 | 313 | 0 | 0 | 0.0 |
| 2022 Q2 | 595 | 2 | 0 | 3361.3 |
| 2022 Q1 | 154 | 1 | 0 | 6493.5 |
| 2021 Q4 | 388 | 0 | 0 | 0.0 |
| 2021 Q3 | 111 | 0 | 0 | 0.0 |
| 2021 Q2 | 392 | 0 | 0 | 0.0 |
| 2021 Q1 | 147 | 0 | 0 | 0.0 |
| 2020 Q4 | 3,450 | 0 | 0 | 0.0 |
| 2020 Q3 | 4,557 | 0 | 0 | 0.0 |
| 2020 Q2 | 12,382 | 1 | 0 | 80.8 |
| 2020 Q1 | 8,502 | 0 | 0 | 0.0 |
| 2019 Q4 | 9,915 | 1 | 0 | 100.9 |
| 2019 Q3 | 9,237 | 1 | 0 | 108.3 |
| 2019 Q2 | 13,680 | 5 | 4 | 365.5 |
| 2019 Q1 | 11,907 | 3 | 1 | 252.0 |
| 2018 Q4 | 8,973 | 0 | 0 | 0.0 |
| 2018 Q3 | 11,731 | 0 | 0 | 0.0 |
| 2018 Q2 | 12,567 | 4 | 0 | 318.3 |
| 2018 Q1 | 8,081 | 3 | 0 | 371.2 |
| 2017 Q4 | 12,622 | 0 | 0 | 0.0 |
| 2017 Q3 | 11,114 | 0 | 0 | 0.0 |
| 2017 Q2 | 11,758 | 1 | 0 | 85.0 |
| 2017 Q1 | 9,657 | 10 | 1 | 1035.5 |
| 2016 Q4 | 8,445 | 2 | 0 | 236.8 |
| 2016 Q3 | 16,372 | 0 | 0 | 0.0 |
| 2016 Q2 | 16,200 | 3 | 2 | 185.2 |
| 2016 Q1 | 12,403 | 0 | 0 | 0.0 |
| 2015 Q4 | 12,198 | 0 | 0 | 0.0 |
| 2015 Q3 | 17,465 | 4 | 3 | 229.0 |
| 2015 Q2 | 15,551 | 23 | 12 | 1479.0 |
| 2015 Q1 | 9,447 | 1 | 0 | 105.9 |
| 2014 Q4 | 9,880 | 4 | 0 | 404.9 |
| 2014 Q3 | 17,552 | 1 | 0 | 57.0 |
| 2014 Q2 | 11,293 | 4 | 1 | 354.2 |
| 2014 Q1 | 6,393 | 1 | 0 | 156.4 |
| 2013 Q4 | 17,038 | 0 | 0 | 0.0 |
| 2013 Q3 | 15,750 | 8 | 2 | 507.9 |
| 2013 Q2 | 11,452 | 1 | 0 | 87.3 |
| 2013 Q1 | 5,352 | 0 | 0 | 0.0 |
| 2012 Q4 | 11,611 | 9 | 1 | 775.1 |
| 2012 Q3 | 16,249 | 1 | 0 | 61.5 |
| 2012 Q2 | 14,821 | 0 | 0 | 0.0 |
| 2012 Q1 | 6,473 | 0 | 0 | 0.0 |
| 2011 Q4 | 12,656 | 4 | 1 | 316.1 |
| 2011 Q3 | 17,307 | 0 | 0 | 0.0 |
| 2011 Q2 | 14,724 | 1 | 0 | 67.9 |
| 2011 Q1 | 5,783 | 0 | 0 | 0.0 |
| 2010 Q4 | 14,139 | 5 | 0 | 353.6 |
| 2010 Q3 | 14,754 | 2 | 0 | 135.6 |
| 2010 Q2 | 14,151 | 1 | 0 | 70.7 |
| 2010 Q1 | 6,968 | 0 | 0 | 0.0 |
| 2009 Q4 | 12,572 | 1 | 0 | 79.5 |
| 2009 Q3 | 17,668 | 0 | 0 | 0.0 |
| 2009 Q2 | 17,721 | 1 | 0 | 56.4 |
| 2009 Q1 | 11,658 | 0 | 0 | 0.0 |
| 2008 Q4 | 14,868 | 0 | 0 | 0.0 |
| 2008 Q3 | 19,291 | 1 | 0 | 51.8 |
| 2008 Q2 | 19,628 | 0 | 0 | 0.0 |
| 2008 Q1 | 17,338 | 0 | 0 | 0.0 |
| 2007 Q4 | 16,252 | 0 | 0 | 0.0 |
| 2007 Q3 | 21,067 | 1 | 0 | 47.5 |
| 2007 Q2 | 20,360 | 2 | 0 | 98.2 |
| 2007 Q1 | 17,442 | 4 | 1 | 229.3 |
| 2006 Q4 | 16,709 | 2 | 0 | 119.7 |
| 2006 Q3 | 17,159 | 0 | 0 | 0.0 |
| 2006 Q2 | 16,464 | 2 | 0 | 121.5 |
| 2006 Q1 | 11,425 | 5 | 0 | 437.6 |
| 2005 Q4 | 5,046 | 0 | 0 | 0.0 |
Incidentes reportables
7 en archivo2019 · 1 incidente
2013 · 1 incidente
NON-WORK RELATED INCIDENT. 2 employees decided to come to work a half hour early to swap a personal television in the employee parking lot before work started. The injured EE attempted to pick up the TV and set it back down in the fellow EE's personal vehicle, the TV landed on his right middle finger causing a laceration. The EE received 7 stitches and released without restriction.
2010 · 3 incidentes
The employee was attempting to remove a shanked drill steel from the face by standing on the tool box in the back of his pickup. When the employee stepped down from the tool box he stepped onto a wheel chock fracturing his ankle.
Working area had a small hump in floor. Employee was in the process tying in the explosive round when he picked up the detonation cord from the rear of the explosives vehicle. He turned to his right to walk back to the face. A small hump in the floor caused employee to roll his right ankle causing the fracture to his right tibula and fibula.
Employee removed a pump motor from the housing to determine the reason for no pressure. When pump was plugged in the impeller broke and a section struck him. The injury required 5 stitches in his lip.
2008 · 1 incidente
The mine had recently changed resin suppliers and new boxes are fully glued. The miner used a razor knife to open the end of the resin box. The miner steadied the box with his left hand while cutting toward it with the knife in his right hand. The blade exited the cardboard and cut the left hand. The miner was taken to a medical facility and received stitches.
2007 · 1 incidente
Employee was assisting a vendor in lowering an equipment part out of the back of a truck at the surface maintenance shop when he heard a tearing sound. When he looked down at his arm he saw that the bicep muscle was out of place. Diagnosed as a ruptured biceps tendon and placed on restricted duty 07/24/07.