There was very hot temperatures in West Texas on this day. The temperature was 103 degrees at time of the incident. Employees Air conditioner was not properly working throughout the day in the Haul truck. The heat caused the employer to pull over on the side of the haul road, where 30 minutes later EE was found passed out from heat.
OnCore 1 Metal/Non-Metal
OnCore 1 tiene $28K en multas propuestas de MSHA y $948 pendientes en 0 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en OnCore 1.
- Muertes
- 0
- Incidentes totales
- 7
- Años en registro
- 2022–2026
- Último incidente
- Jun 2026
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.OnCore 1 tiene $28K en multas propuestas de MSHA y $948 pendientes en 0 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 15,058 | 0 | 0 | 0.0 |
| 2025 Q3 | 12,721 | 0 | 0 | 0.0 |
| 2025 Q2 | 13,586 | 3 | 0 | 220.8 |
| 2025 Q1 | 12,419 | 0 | 0 | 0.0 |
| 2024 Q4 | 15,439 | 11 | 0 | 712.5 |
| 2024 Q3 | 12,483 | 0 | 0 | 0.0 |
| 2024 Q2 | 15,744 | 3 | 1 | 190.5 |
| 2024 Q1 | 13,451 | 6 | 1 | 446.1 |
Mostrar 13 trimestres anteriores Ocultar trimestres anteriores
| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 14,044 | 0 | 0 | 0.0 |
| 2023 Q3 | 14,730 | 0 | 0 | 0.0 |
| 2023 Q2 | 18,605 | 3 | 2 | 161.2 |
| 2023 Q1 | 16,901 | 0 | 0 | 0.0 |
| 2022 Q4 | 14,716 | 9 | 2 | 611.6 |
| 2022 Q3 | 14,921 | 5 | 3 | 335.1 |
| 2022 Q2 | 13,848 | 17 | 4 | 1227.6 |
| 2022 Q1 | 11,958 | 0 | 0 | 0.0 |
| 2021 Q4 | 12,243 | 0 | 0 | 0.0 |
| 2021 Q3 | 10,007 | 3 | 0 | 299.8 |
| 2021 Q2 | 12,840 | 0 | 0 | 0.0 |
| 2021 Q1 | 12,972 | 0 | 0 | 0.0 |
| 2020 Q4 | 7,935 | 0 | 0 | 0.0 |
Incidentes reportables
7 en archivo2026 · 1 incidente
2025 · 1 incidente
Employee was utilizing a grinder to cut a bearing sleeve. This task was necessary to replace the bearing on the head pulley of the C1 belt. Midway through the task, the grinder unexpectedly kicked back towards the employee, causing the grinder's disk to make contact with the employee's left forearm resulting in a laceration.
2023 · 2 incidentes
Individual was greasing excavator prior to working and outdoor conditions were windy and dry. EE recalls sand blowing into right eye. EE attempted to wipe it away and believed EE had done so. Reported to manager on 28 Aug as EE felt EE needed to get medical attention to the eye.
IW was struck by co-workers hardhat. Hardhat was swung down and away and was swung into the injured worker standing behind.
2022 · 3 incidentes
While replacing a damaged digger tooth on excavator bucket, as hammer was swung it impacted corner of tooth and broke off and entered right hand between thumb and index finger (Crotch of hand).
While climbing down the ladder, IP right foot slipped off the last step (rung) on the ladder. IP attempted to catch self resulting in a strain to EE's right elbow. Incident occurred on 06/28/22, reported on 06/29/2022 First Aid Case. Seen by MD on 07/06/2022.
Employee fell on frozen ground landing on their side resulting in a shoulder strain.
The full compliance file on OnCore 1
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.