Employee was using a pipe wrench to seat a belt on the PS1 Shaker Pully, when the belt seated the pressure released and they smashed a hand between the wrench and a guard brace that was under the pully. This resulted in a laceration that required 13 stiches to close up. EE was given a prescription for antibiotic and placed on light duty until the stiches are removed in 10 days.
Benton Plant Metal/Non-Metal
Benton Plant tiene $5K en multas propuestas de MSHA y $32 pendientes en 0 expedientes impugnados, ademas del muestreo de salud y el registro completo de incidentes.
Seguir esta mina
Avísenme cuando se presente un nuevo incidente de la MSHA en Benton Plant.
- Muertes
- 0
- Incidentes totales
- 3
- Años en registro
- 2022–2024
- Último incidente
- Feb 2024
ⓘ
Esta tasa son las citaciones registradas divididas entre las horas de inspección de la MSHA, por cada 100 horas. Refleja el esfuerzo de inspección, no el tamaño de la mina ni la producción.Benton Plant tiene $5K en multas propuestas de MSHA y $32 pendientes en 0 expedientes impugnados.
ⓘ
Las diferencias entre las multas propuestas y las pagadas reflejan tanto acuerdos y reducciones en conferencia como montos aun adeudados. Pendiente es el saldo que se debe actualmente.ⓘ
Citaciones por millón de horas-empleado reportadas. Las tasas comienzan en el año 2000, cuando inician los datos trimestrales de empleo de la MSHA; los incidentes anteriores se cuentan pero no pueden ajustarse por tasa. Los trimestres con menos de 100,000 horas reportadas se muestran en gris: muy pocas horas para una tasa estable.| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 7,559 | 0 | 0 | 0.0 |
| 2025 Q3 | 10,234 | 0 | 0 | 0.0 |
| 2025 Q2 | 10,021 | 0 | 0 | 0.0 |
| 2025 Q1 | 7,921 | 0 | 0 | 0.0 |
| 2024 Q4 | 7,607 | 0 | 0 | 0.0 |
| 2024 Q3 | 8,913 | 0 | 0 | 0.0 |
| 2024 Q2 | 8,341 | 1 | 0 | 119.9 |
| 2024 Q1 | 8,284 | 0 | 0 | 0.0 |
Mostrar 24 trimestres anteriores Ocultar trimestres anteriores
| Trimestre | Horas trabajadas | Citaciones | S&S | Por 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 9,328 | 0 | 0 | 0.0 |
| 2023 Q3 | 10,465 | 0 | 0 | 0.0 |
| 2023 Q2 | 11,606 | 1 | 0 | 86.2 |
| 2023 Q1 | 8,647 | 4 | 0 | 462.6 |
| 2022 Q4 | 9,576 | 0 | 0 | 0.0 |
| 2022 Q3 | 8,851 | 0 | 0 | 0.0 |
| 2022 Q2 | 7,923 | 1 | 0 | 126.2 |
| 2022 Q1 | 6,736 | 0 | 0 | 0.0 |
| 2021 Q4 | 6,842 | 4 | 0 | 584.6 |
| 2021 Q2 | 8,497 | 0 | 0 | 0.0 |
| 2021 Q1 | 6,842 | 2 | 0 | 292.3 |
| 2020 Q4 | 8,703 | 0 | 0 | 0.0 |
| 2020 Q3 | 7,769 | 0 | 0 | 0.0 |
| 2020 Q2 | 5,625 | 4 | 0 | 711.1 |
| 2020 Q1 | 4,731 | 0 | 0 | 0.0 |
| 2019 Q4 | 4,341 | 3 | 0 | 691.1 |
| 2019 Q3 | 4,507 | 0 | 0 | 0.0 |
| 2019 Q2 | 4,473 | 6 | 2 | 1341.4 |
| 2019 Q1 | 3,985 | 2 | 0 | 501.9 |
| 2018 Q4 | 4,032 | 0 | 0 | 0.0 |
| 2018 Q3 | 5,322 | 0 | 0 | 0.0 |
| 2018 Q2 | 5,492 | 0 | 0 | 0.0 |
| 2018 Q1 | 4,101 | 0 | 0 | 0.0 |
| 2017 Q4 | 4,073 | 0 | 0 | 0.0 |
Incidentes reportables
3 en archivo2024 · 1 incidente
2022 · 2 incidentes
Emp was using a pry bar to keep a pump impellor from turning as they were replacing it. The impellor turned and EE's rt hand was caught between the pry bar and the pump housing causing a bruise to the top of EE's hand.
Mechanic was working on a track hoe and removing a tooth form the bucket. The tooth was stuck and they struck the tooth with a hammer and sliver of metal sheered off and struck them in the leg, causing a puncture to right leg.
The full compliance file on Benton Plant
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.