citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
212 citations across 1,059 inspection hours.
Source: MSHA inspections data, updated weekly.
#1 has $61K in proposed MSHA penalties and $44K outstanding across 2 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$61K
proposed penalties
$61K
current assessed
$17K
paid to date
$44K
outstanding
204 assessments are final orders; 2 contested dockets.
Of $7K in penalties contested before the Commission, $7K was upheld in final decisions.
As of the most recent assessment on 2010-01-14.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
3citations taken to the federal commission · 1% of citations on record
Settled
3 · 100%
100%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 3 decided S&S contests · industry: 79%
6%
Penalty reduction in decided contests
$7K proposed, $7K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2009-11-19.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
MSHA sampling at #1 shows 95% of 60 respirable coal dust samples met the 1.5 mg/m3 standard.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2009-12-14, 16 years ago
95%
within 1.5 mg/m3
60
samples
2.43
dust max (mg/m3)
41 samples taken by MSHA inspectors, 19 by the operator.
Most-sampled occupations
CUTTING MACHINE OPERATOR17
SCOOP CAR OPERATOR8
CONTINUOUS MINER OPERATOR6
Noise
ⓘThe share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Health sampling trend
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust by year
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
ⓘCoal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.
Year
Employees
Coal produced (tons)
2009
13
19,589
2008
10
15,156
Source: MSHA quarterly employment and production, updated weekly; years before 2000 come from MSHA's archived Part 50 employment files.
#1 sits in Pike County, Kentucky, where the Census mining category is 5.1% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Pike County, Kentucky · Population 57,466
5.1%
Mining share of county employment
$42,179
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000; earlier incidents are counted but not rate-adjusted, though reported hours reach back to 1983. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2009 Q3
6,344
28
17
4413.6
2009 Q2
4,059
3
2
739.1
2009 Q1
3,447
74
32
21467.9
2008 Q4
4,478
34
12
7592.7
2008 Q3
2,162
27
12
12488.4
2008 Q2
0
0
0
No fatalities recorded at this mine.
Reportable incidents
2 on file
2009 · 1 incident
March 10, 2009KY · Coalroof bolter, rock bolter, pinner, mobile roof support operator (mrs)MACHINERY
Roof Bolting and employee states the ATRS fell striking employee. Alleged Accident investigated by mine foreman and no sign of inoperable or malfunction ATRS found.
Show 1 earlier incidentsHide earlier incidents
2008 · 1 incident
September 16, 2008KY · Coallaborer, bull gang, parts runner, roustabout, roof trimmer/scalerHANDLING OF MATERIALS