SOC. EXPLORACION Y DESARROLLO MINERO (EXPLODESA)
RUT 79812520-6
ⓘ
RUT is Chile's tax identifier (Rol Único Tributario). SERNAGEOMIN, the SMA and the Dirección del Trabajo all publish it, so records join exactly, with no name matching.
ⓘ
A faena is a mine site: a named operation that can hold many installations (pits, shafts, plants, deposits).ⓘ
A fiscalización is one SMA inspection file: an on-site inspection, a document review or a monitoring check on one fiscalizable unit. Most close without a sanction proceeding; the ones that opened one link to it.ⓘ
UTA is Chile's annual tax unit (Unidad Tributaria Anual), 12 times the monthly UTM, about 859,788 CLP in August 2026. SMA fines are levied in UTA. Gray dollar figures are approximate conversions at CLP 929 per US$1 (August 31, 2026).| Faena | Category (SERNAGEOMIN) | Region | Installations | Status |
|---|---|---|---|---|
| MINA UVA | CATEGORIA B | VALPARAISO · CATEMU | 38 | 26 active |
| LOS CARDOS (1-24) | CATEGORIA D | COQUIMBO · LA HIGUERA | 7 | 5 active |
| BROWNFIELD CATEMU | CATEGORIA C | VALPARAISO · CATEMU | 5 | 2 active |
| SAN ANTONIO | CATEGORIA D | ATACAMA · VALLENAR | 2 | 1 active |
| TRICOLOR | CATEGORIA D | ATACAMA · VALLENAR | 2 | 1 active |
| EXPLORACION RAJO DOS AMIGOS | CATEGORIA D | ATACAMA · VALLENAR | 1 | 1 active |
| FAENA AMALIA | CATEGORIA B | COQUIMBO · LA HIGUERA | 20 | no active installations |
| DO AMIG | CATEGORIA B | ATACAMA · VALLENAR | 9 | no active installations |
| MINA CARDENILLA | SIN CATEGORIA | VALPARAISO · CATEMU | 6 | no active installations |
| MINA PICHEREY | CATEGORIA D | ATACAMA · CHAÑARAL | 5 | no active installations |
| LOS MANTOS DE CATEMU | CATEGORIA D | VALPARAISO · CATEMU | 4 | no active installations |
| BUENA UNION | CATEGORIA C | ATACAMA · FREIRINA | 3 | no active installations |
| FAENA MINERA 3H | CATEGORIA B | VALPARAISO · CATEMU | 3 | no active installations |
| MANTOS PACIFICO | CATEGORIA D | ATACAMA · VALLENAR | 3 | no active installations |
| SAN JUAN | CATEGORIA D | ATACAMA · FREIRINA | 3 | no active installations |
| FARELLONES | CATEGORIA D | ATACAMA · FREIRINA | 2 | no active installations |
| LA COBRE | CATEGORIA D | ATACAMA · VALLENAR | 2 | no active installations |
| SANTA TERESA | CATEGORIA D | ATACAMA · VALLENAR | 2 | no active installations |
| AGUSTINA | CATEGORIA D | COQUIMBO · LA HIGUERA | 1 | no active installations |
| CECILIA II 1/20 | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| CHERCAN 1/113 | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| DESIERTO | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| DESMONTES FREIRINA | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| DESMONTES LA VICTORIANA | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| DOMEYKO | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| EL ALTAR | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| ESCORIA EL MORADO | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| ESCORIAL 1/7 CANTO DEL AGUA | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| ESCORIAL CANTO DEL AGUA II | CATEGORIA D | ATACAMA · HUASCO | 1 | no active installations |
| ESCORIAL CARRIZAL ALTO | CATEGORIA D | ATACAMA · HUASCO | 1 | no active installations |
| ESTELA | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| EXPLORACIÓN MINA CARMEN | CATEGORIA C | ATACAMA · FREIRINA | 1 | no active installations |
| FAENA MAGARES | CATEGORIA D | COQUIMBO · LA HIGUERA | 1 | no active installations |
| LA CALIZA | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| LA CERRADA | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| LA FORTUNA | CATEGORIA C | VALPARAISO · CATEMU | 1 | no active installations |
| LA GANADORA 1/10 | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| LA GRINGA | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| LA LIGA | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| LA VERDE | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| LAURITA | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| LOLITA 1/20 | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| MARISOL | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| MARSELLESA | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| MINA AMELIA | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| MINA BOYEN | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| MINA LA CARDENILLA (ELIMINADA) | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| MINA SANDRA | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| NELIDA 1/20 CARRIZAL ALTO | CATEGORIA D | ATACAMA · HUASCO | 1 | no active installations |
| PLANTA DOMEYKO | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| PROYECTO DE EXPLORACIÓN (MINA CHEHUEQUE) | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
| QUEBRADITA I | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| RINCON 1/10 | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| ROSARIO | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| SAN JOSE | CATEGORIA D | VALPARAISO · CATEMU | 1 | no active installations |
| SANDRA 1/18 | CATEGORIA D | ATACAMA · FREIRINA | 1 | no active installations |
| SOC DE EXPLOR Y DESARROLLO (LA LIGUA) | CATEGORIA D | VALPARAISO · LA LIGUA | 1 | no active installations |
| TOBIAS 1/20 | CATEGORIA D | ATACAMA · VALLENAR | 1 | no active installations |
One row per faena; installation counts and statuses are the registry's own. Active means at least one installation marked ACTIVA.
Case file
ⓘThe SMA's own case-file code, the key that links the proceeding across the agency's site. |
Fiscalized unit | Final SMA fines (UTA)
ⓘUTA is Chile's annual tax unit (Unidad Tributaria Anual), 12 times the monthly UTM, about 859,788 CLP in August 2026. SMA fines are levied in UTA. Gray dollar figures are approximate conversions at CLP 929 per US$1 (August 31, 2026). |
Payment
ⓘPayment status is the SMA's own Registro Público marker: Pagada = paid, Pendiente = pending. It tracks the fine, not any appeal. |
|---|---|---|---|
| F-009-2018 | MINA CARDENILLA · Región de Valparaíso | 7,976 UTA ≈$7.4M | Pagada |
| Case file | Fiscalized unit | Status (SMA)
ⓘThe proceeding status is the SMA's own wording, verbatim Spanish. |
|---|---|---|
| D-132-2021 | PROYECTO MINERO UVA · Región de Valparaíso | Programa de Cumplimiento en ejecución |
| P-001-2019 | MINA CARDENILLA · Región de Valparaíso | Terminado - PDC Satisfactorio |
| F-009-2018 | MINA CARDENILLA · Región de Valparaíso | Terminado - Sanción |
| A-002-2015 | PROYECTO MINERO UVA · Región de Valparaíso | Terminado - PDC Satisfactorio |
Final sanctions come from the SMA's Registro Público (fines in UTA); proceedings from its Sancionatorio docket. Statuses and wording are the SMA's own.
5 inspection files since 2016; 5 of them went on to a sanction proceeding.
| Year | Case file
ⓘThe SMA's own case-file code, the key that links the proceeding across the agency's site. |
Type (SMA) | Fiscalized unit | Led to | Report |
|---|---|---|---|---|---|
| 2018 | DFZ-2018-1278-V-RCA | PROYECTO MINERO UVA · Región de Valparaíso | D-132-2021 · Programa de Cumplimiento en ejecución | ||
| 2018 | DFZ-2018-2383-V-MP | PROYECTO MINERO UVA · Región de Valparaíso | D-132-2021 · Programa de Cumplimiento en ejecución | ||
| 2017 | DFZ-2017-177-V-RCA-IA | Inspección Ambiental | MINA CARDENILLA · Región de Valparaíso | F-009-2018 · Terminado - SanciónP-001-2019 · Terminado - PDC Satisfactorio | |
| 2017 | DFZ-2017-179-V-PC-EI | Examen de Información | PROYECTO MINERO UVA · Región de Valparaíso | A-002-2015 · Terminado - PDC Satisfactorio | |
| 2016 | DFZ-2016-919-V-RCA-IA | Inspección Ambiental | PROYECTO MINERO UVA · Región de Valparaíso | D-132-2021 · Programa de Cumplimiento en ejecución |
Every published SMA inspection file for this company's fiscalizable units, including the ones that closed without a case. Type, year and outcome are the SMA's own; a file that opened a sanction proceeding shows its case code and status. Files ingested before their detail page was read show the year from the file code and no type.
39 executed fines on record; the UTM-denominated ones total 1,650 UTM (≈$127K).
| Case | Executed | Amount
ⓘUTM is Chile's monthly-indexed tax unit (71,649 CLP in August 2026); UF is a separate inflation-indexed unit. A labor fine states its amount plus which unit it is denominated in. |
Status (SMA) | Infringement (DT's wording) |
|---|---|---|---|---|
| 8687/25/221-1 | 2026-02-16 | 60 UTM | PAGADA | No otorgar finiquito de trabajo y no poner el pago a disposición del trabajador dentro del plazo de 10 días hábiles. |
| 8366/24/004-1 | 2025-07-03 | 60 UTM | PAGADA | Incumplimiento al contrato de trabajo. |
| 8366/24/004-2 | 2025-07-03 | 60 UTM | PAGADA | Exceder la jornada ordinaria diaria (semanal). |
| 8366/24/004-3 | 2025-07-03 | 60 UTM | PAGADA | No suprimir los factores de peligro en el lugar de trabajo. |
| 8366/24/004-4 | 2025-07-03 | 30 UTM | PAGADA | No dotar de vestidores y/o guardarropas según los requisitos mínimos legales. |
| 1468/24/061-1 | 2025-06-17 | 30 UTM | PAGADA | No mantener en los lugares de trabajo las condiciones sanitarias y ambientales necesarias. |
| 1468/24/061-2 | 2025-06-17 | 30 UTM | PAGADA | No estar debidamente protegidas las partes móviles y otras de las maquinarias y equipos. |
| 1468/24/061-3 | 2025-06-17 | 30 UTM | PAGADA | No dotar de vestidores y/o guardarropas según los requisitos mínimos legales. |
| 1468/24/061-4 | 2025-06-17 | 30 UTM | PAGADA | No contar los lugares de trabajo con elementos estructurales, maquinarias e instalaciones en condiciones seguras. |
| 1468/24/061-5 | 2025-06-17 | 30 UTM | PAGADA | No mantener los pisos y pasillos de tránsito libres de obstáculos para un seguro desplazamiento. |
| 1468/24/061-6 | 2025-06-17 | 30 UTM | PAGADA | No suprimir los factores de peligro en el lugar de trabajo. |
| 1468/24/061-7 | 2025-06-17 | 60 UTM | PAGADA | No proporcionar a los trabajadores, libres de todo costo y cualquiera sea la función que éstos desempeñen, los elementos de protección personal. |
| 1468/24/061-8 | 2025-06-17 | 30 UTM | PAGADA | No realizar reunión el Comité Paritario de Higiene y Seguridad, de acuerdo con la ley. |
| 3920/24/051-1 | 2025-06-17 | 30 UTM | PAGADA | No contar con ventilación el lugar de trabajo. |
| 3920/24/051-2 | 2025-06-17 | 30 UTM | PAGADA | No contar la empresa minera extractiva con excusados de agua corriente o excusados químicos. |
| 3920/24/051-3 | 2025-06-17 | 30 UTM | PAGADA | No dotar de vestidores y/o guardarropas fijo o móvil. |
| 3920/24/051-4 | 2025-06-17 | 30 UTM | PAGADA | No informar a los trabajadores acerca de los riesgos laborales. |
| 3920/24/051-5 | 2025-06-17 | 30 UTM | PAGADA | No mantener las paredes, cielos rasos, puertas y ventanas en buen estado de limpieza y conservación. |
| 3920/24/051-6 | 2025-06-17 | 30 UTM | PAGADA | No mantener protegidas las instalaciones eléctricas o de gas. |
| 3920/24/051-7 | 2025-06-17 | 30 UTM | PAGADA | No mantener vías de escape o evacuación libre de obstrucciones. |
| 3920/24/051-8 | 2025-06-17 | 30 UTM | PAGADA | No mantener en los lugares de trabajo las condiciones sanitarias y ambientales necesarias. |
| 3920/24/051-9 | 2025-06-17 | 30 UTM | PAGADA | No disponer de duchas con agua fría y caliente. |
| 8687/24/169-1 | 2025-04-25 | 60 UTM | PAGADA | No enviar a la Inspección del Trabajo dentro del plazo de 3 días hábiles copia del aviso de término del contrato de trabajo. |
| 1468/25/004-1 | 2025-03-17 | 5.25 UF | PAGADA | No declarar oportunamente las cotizaciones previsionales del seguro de invalidez y sobrevivencia durante los períodos de incapacidad laboral. |
| 1739/24/003-4 | 2025-01-02 | 60 UTM | PAGADA | No cumplir el Comité Paritario de Higiene y Seguridad las funciones encomendadas por la ley. |
| 1337/22/006-1 | 2024-12-09 | 60 UTM | PAGADA | No cumplir acuerdos del Departamento de Prevención de Riesgos/Comité Paritario de Higiene y Seguridad. |
| 1337/22/006-2 | 2024-12-09 | 60 UTM | PAGADA | No contar con servicios higiénicos según los requisitos mínimos legales. |
| 1337/22/006-3 | 2024-12-09 | 60 UTM | PAGADA | No realizar medidas preventivas ante enfermedades profesionales. |
| 1337/22/006-5 | 2024-12-09 | 60 UTM | PAGADA | No suprimir los factores de peligro en el lugar de trabajo. |
| 8336/24/029-1 | 2024-08-06 | 60 UTM | PAGADA | No trasladar a trabajador afectado por enfermedad profesional a otra faena no nociva. |
| 8336/24/029-2 | 2024-08-06 | 60 UTM | PAGADA | No asesorar y desarrollar el Departamento de Prevención de Riesgos lo pertinente con las funciones mínimas. |
| 8366/23/004-3 | 2024-04-22 | 60 UTM | PAGADA | Exceder la jornada ordinaria diaria (semanal). |
| 1468/24/008-1 | 2024-04-01 | 60 UTM | PAGADA | No contener el reglamento interno las cláusulas mínimas establecida por la ley. |
| 7911/22/007-1 | 2023-08-25 | 60 UTM | PAGADA | No registrar la jornada de trabajo el experto en prevención de riesgos. |
| 7911/22/007-4 | 2023-08-25 | 30 UTM | PAGADA | No suprimir los factores de peligro en el lugar de trabajo. |
| 4260/23/003-1 | 2023-04-13 | 2 IMM | PAGADA | No exhibir toda la documentación necesaria para efectuar la conciliación |
| 7911/22/007-3 | 2022-12-29 | 60 UTM | PAGADA | No tomar todas las medidas necesarias para proteger eficazmente la vida y salud de los trabajadores. |
| 8336/21/030-1 | 2021-11-28 | 30 UTM | PAGADA | No cumplir estipulaciones de instrumento colectivo. |
| 8336/20/039-1 | 2021-04-26 | 60 UTM | PAGADA | Investigación por acoso sexual sin el procedimiento establecido en la ley. |
Executed fines only (multas ejecutoriadas); fines still under administrative or judicial review are not in the DT registry.