Mining Incidents

← Chile's mining record

Chile · Company record

SOC. EXPLORACION Y DESARROLLO MINERO (EXPLODESA)

RUT 79812520-6

ⓘ RUT is Chile's tax identifier (Rol Único Tributario). SERNAGEOMIN, the SMA and the Dirección del Trabajo all publish it, so records join exactly, with no name matching.

58
faenas
ⓘ A faena is a mine site: a named operation that can hold many installations (pits, shafts, plants, deposits).
5
SMA inspections
ⓘ A fiscalización is one SMA inspection file: an on-site inspection, a document review or a monitoring check on one fiscalizable unit. Most close without a sanction proceeding; the ones that opened one link to it.
4
SMA records
7,976 UTA
final fines
ⓘ UTA is Chile's annual tax unit (Unidad Tributaria Anual), 12 times the monthly UTM, about 859,788 CLP in August 2026. SMA fines are levied in UTA. Gray dollar figures are approximate conversions at CLP 929 per US$1 (August 31, 2026).
39
labor fines
Faenas in the SERNAGEOMIN registry
Faena Category (SERNAGEOMIN) Region Installations Status
MINA UVA CATEGORIA B VALPARAISO · CATEMU 38 26 active
LOS CARDOS (1-24) CATEGORIA D COQUIMBO · LA HIGUERA 7 5 active
BROWNFIELD CATEMU CATEGORIA C VALPARAISO · CATEMU 5 2 active
SAN ANTONIO CATEGORIA D ATACAMA · VALLENAR 2 1 active
TRICOLOR CATEGORIA D ATACAMA · VALLENAR 2 1 active
EXPLORACION RAJO DOS AMIGOS CATEGORIA D ATACAMA · VALLENAR 1 1 active
FAENA AMALIA CATEGORIA B COQUIMBO · LA HIGUERA 20 no active installations
DO AMIG CATEGORIA B ATACAMA · VALLENAR 9 no active installations
MINA CARDENILLA SIN CATEGORIA VALPARAISO · CATEMU 6 no active installations
MINA PICHEREY CATEGORIA D ATACAMA · CHAÑARAL 5 no active installations
LOS MANTOS DE CATEMU CATEGORIA D VALPARAISO · CATEMU 4 no active installations
BUENA UNION CATEGORIA C ATACAMA · FREIRINA 3 no active installations
FAENA MINERA 3H CATEGORIA B VALPARAISO · CATEMU 3 no active installations
MANTOS PACIFICO CATEGORIA D ATACAMA · VALLENAR 3 no active installations
SAN JUAN CATEGORIA D ATACAMA · FREIRINA 3 no active installations
FARELLONES CATEGORIA D ATACAMA · FREIRINA 2 no active installations
LA COBRE CATEGORIA D ATACAMA · VALLENAR 2 no active installations
SANTA TERESA CATEGORIA D ATACAMA · VALLENAR 2 no active installations
AGUSTINA CATEGORIA D COQUIMBO · LA HIGUERA 1 no active installations
CECILIA II 1/20 CATEGORIA D ATACAMA · FREIRINA 1 no active installations
CHERCAN 1/113 CATEGORIA D ATACAMA · VALLENAR 1 no active installations
DESIERTO CATEGORIA D ATACAMA · FREIRINA 1 no active installations
DESMONTES FREIRINA CATEGORIA D ATACAMA · FREIRINA 1 no active installations
DESMONTES LA VICTORIANA CATEGORIA D VALPARAISO · CATEMU 1 no active installations
DOMEYKO CATEGORIA D ATACAMA · VALLENAR 1 no active installations
EL ALTAR CATEGORIA D ATACAMA · FREIRINA 1 no active installations
ESCORIA EL MORADO CATEGORIA D ATACAMA · FREIRINA 1 no active installations
ESCORIAL 1/7 CANTO DEL AGUA CATEGORIA D ATACAMA · VALLENAR 1 no active installations
ESCORIAL CANTO DEL AGUA II CATEGORIA D ATACAMA · HUASCO 1 no active installations
ESCORIAL CARRIZAL ALTO CATEGORIA D ATACAMA · HUASCO 1 no active installations
ESTELA CATEGORIA D ATACAMA · VALLENAR 1 no active installations
EXPLORACIÓN MINA CARMEN CATEGORIA C ATACAMA · FREIRINA 1 no active installations
FAENA MAGARES CATEGORIA D COQUIMBO · LA HIGUERA 1 no active installations
LA CALIZA CATEGORIA D ATACAMA · VALLENAR 1 no active installations
LA CERRADA CATEGORIA D VALPARAISO · CATEMU 1 no active installations
LA FORTUNA CATEGORIA C VALPARAISO · CATEMU 1 no active installations
LA GANADORA 1/10 CATEGORIA D ATACAMA · VALLENAR 1 no active installations
LA GRINGA CATEGORIA D ATACAMA · FREIRINA 1 no active installations
LA LIGA CATEGORIA D ATACAMA · VALLENAR 1 no active installations
LA VERDE CATEGORIA D ATACAMA · FREIRINA 1 no active installations
LAURITA CATEGORIA D ATACAMA · FREIRINA 1 no active installations
LOLITA 1/20 CATEGORIA D ATACAMA · VALLENAR 1 no active installations
MARISOL CATEGORIA D ATACAMA · VALLENAR 1 no active installations
MARSELLESA CATEGORIA D ATACAMA · VALLENAR 1 no active installations
MINA AMELIA CATEGORIA D VALPARAISO · CATEMU 1 no active installations
MINA BOYEN CATEGORIA D VALPARAISO · CATEMU 1 no active installations
MINA LA CARDENILLA (ELIMINADA) CATEGORIA D VALPARAISO · CATEMU 1 no active installations
MINA SANDRA CATEGORIA D ATACAMA · FREIRINA 1 no active installations
NELIDA 1/20 CARRIZAL ALTO CATEGORIA D ATACAMA · HUASCO 1 no active installations
PLANTA DOMEYKO CATEGORIA D ATACAMA · VALLENAR 1 no active installations
PROYECTO DE EXPLORACIÓN (MINA CHEHUEQUE) CATEGORIA D ATACAMA · VALLENAR 1 no active installations
QUEBRADITA I CATEGORIA D ATACAMA · FREIRINA 1 no active installations
RINCON 1/10 CATEGORIA D ATACAMA · FREIRINA 1 no active installations
ROSARIO CATEGORIA D ATACAMA · FREIRINA 1 no active installations
SAN JOSE CATEGORIA D VALPARAISO · CATEMU 1 no active installations
SANDRA 1/18 CATEGORIA D ATACAMA · FREIRINA 1 no active installations
SOC DE EXPLOR Y DESARROLLO (LA LIGUA) CATEGORIA D VALPARAISO · LA LIGUA 1 no active installations
TOBIAS 1/20 CATEGORIA D ATACAMA · VALLENAR 1 no active installations

One row per faena; installation counts and statuses are the registry's own. Active means at least one installation marked ACTIVA.

SMA environmental record
Case file
ⓘ The SMA's own case-file code, the key that links the proceeding across the agency's site.
Fiscalized unit Final SMA fines (UTA)
ⓘ UTA is Chile's annual tax unit (Unidad Tributaria Anual), 12 times the monthly UTM, about 859,788 CLP in August 2026. SMA fines are levied in UTA. Gray dollar figures are approximate conversions at CLP 929 per US$1 (August 31, 2026).
Payment
ⓘ Payment status is the SMA's own Registro Público marker: Pagada = paid, Pendiente = pending. It tracks the fine, not any appeal.
F-009-2018 MINA CARDENILLA · Región de Valparaíso 7,976 UTA ≈$7.4M Pagada
Case file Fiscalized unit Status (SMA)
ⓘ The proceeding status is the SMA's own wording, verbatim Spanish.
D-132-2021 PROYECTO MINERO UVA · Región de Valparaíso Programa de Cumplimiento en ejecución
P-001-2019 MINA CARDENILLA · Región de Valparaíso Terminado - PDC Satisfactorio
F-009-2018 MINA CARDENILLA · Región de Valparaíso Terminado - Sanción
A-002-2015 PROYECTO MINERO UVA · Región de Valparaíso Terminado - PDC Satisfactorio

Final sanctions come from the SMA's Registro Público (fines in UTA); proceedings from its Sancionatorio docket. Statuses and wording are the SMA's own.

SMA inspection record (fiscalizaciones)

5 inspection files since 2016; 5 of them went on to a sanction proceeding.

Year Case file
ⓘ The SMA's own case-file code, the key that links the proceeding across the agency's site.
Type (SMA) Fiscalized unit Led to Report
2018 DFZ-2018-1278-V-RCA PROYECTO MINERO UVA · Región de Valparaíso D-132-2021 · Programa de Cumplimiento en ejecución PDF
2018 DFZ-2018-2383-V-MP PROYECTO MINERO UVA · Región de Valparaíso D-132-2021 · Programa de Cumplimiento en ejecución PDF
2017 DFZ-2017-177-V-RCA-IA Inspección Ambiental MINA CARDENILLA · Región de Valparaíso F-009-2018 · Terminado - SanciónP-001-2019 · Terminado - PDC Satisfactorio PDF
2017 DFZ-2017-179-V-PC-EI Examen de Información PROYECTO MINERO UVA · Región de Valparaíso A-002-2015 · Terminado - PDC Satisfactorio PDF
2016 DFZ-2016-919-V-RCA-IA Inspección Ambiental PROYECTO MINERO UVA · Región de Valparaíso D-132-2021 · Programa de Cumplimiento en ejecución PDF

Every published SMA inspection file for this company's fiscalizable units, including the ones that closed without a case. Type, year and outcome are the SMA's own; a file that opened a sanction proceeding shows its case code and status. Files ingested before their detail page was read show the year from the file code and no type.

Labor fines (Dirección del Trabajo)

39 executed fines on record; the UTM-denominated ones total 1,650 UTM (≈$127K).

Case Executed Amount
ⓘ UTM is Chile's monthly-indexed tax unit (71,649 CLP in August 2026); UF is a separate inflation-indexed unit. A labor fine states its amount plus which unit it is denominated in.
Status (SMA) Infringement (DT's wording)
8687/25/221-1 2026-02-16 60 UTM PAGADA No otorgar finiquito de trabajo y no poner el pago a disposición del trabajador dentro del plazo de 10 días hábiles.
8366/24/004-1 2025-07-03 60 UTM PAGADA Incumplimiento al contrato de trabajo.
8366/24/004-2 2025-07-03 60 UTM PAGADA Exceder la jornada ordinaria diaria (semanal).
8366/24/004-3 2025-07-03 60 UTM PAGADA No suprimir los factores de peligro en el lugar de trabajo.
8366/24/004-4 2025-07-03 30 UTM PAGADA No dotar de vestidores y/o guardarropas según los requisitos mínimos legales.
1468/24/061-1 2025-06-17 30 UTM PAGADA No mantener en los lugares de trabajo las condiciones sanitarias y ambientales necesarias.
1468/24/061-2 2025-06-17 30 UTM PAGADA No estar debidamente protegidas las partes móviles y otras de las maquinarias y equipos.
1468/24/061-3 2025-06-17 30 UTM PAGADA No dotar de vestidores y/o guardarropas según los requisitos mínimos legales.
1468/24/061-4 2025-06-17 30 UTM PAGADA No contar los lugares de trabajo con elementos estructurales, maquinarias e instalaciones en condiciones seguras.
1468/24/061-5 2025-06-17 30 UTM PAGADA No mantener los pisos y pasillos de tránsito libres de obstáculos para un seguro desplazamiento.
1468/24/061-6 2025-06-17 30 UTM PAGADA No suprimir los factores de peligro en el lugar de trabajo.
1468/24/061-7 2025-06-17 60 UTM PAGADA No proporcionar a los trabajadores, libres de todo costo y cualquiera sea la función que éstos desempeñen, los elementos de protección personal.
1468/24/061-8 2025-06-17 30 UTM PAGADA No realizar reunión el Comité Paritario de Higiene y Seguridad, de acuerdo con la ley.
3920/24/051-1 2025-06-17 30 UTM PAGADA No contar con ventilación el lugar de trabajo.
3920/24/051-2 2025-06-17 30 UTM PAGADA No contar la empresa minera extractiva con excusados de agua corriente o excusados químicos.
3920/24/051-3 2025-06-17 30 UTM PAGADA No dotar de vestidores y/o guardarropas fijo o móvil.
3920/24/051-4 2025-06-17 30 UTM PAGADA No informar a los trabajadores acerca de los riesgos laborales.
3920/24/051-5 2025-06-17 30 UTM PAGADA No mantener las paredes, cielos rasos, puertas y ventanas en buen estado de limpieza y conservación.
3920/24/051-6 2025-06-17 30 UTM PAGADA No mantener protegidas las instalaciones eléctricas o de gas.
3920/24/051-7 2025-06-17 30 UTM PAGADA No mantener vías de escape o evacuación libre de obstrucciones.
3920/24/051-8 2025-06-17 30 UTM PAGADA No mantener en los lugares de trabajo las condiciones sanitarias y ambientales necesarias.
3920/24/051-9 2025-06-17 30 UTM PAGADA No disponer de duchas con agua fría y caliente.
8687/24/169-1 2025-04-25 60 UTM PAGADA No enviar a la Inspección del Trabajo dentro del plazo de 3 días hábiles copia del aviso de término del contrato de trabajo.
1468/25/004-1 2025-03-17 5.25 UF PAGADA No declarar oportunamente las cotizaciones previsionales del seguro de invalidez y sobrevivencia durante los períodos de incapacidad laboral.
1739/24/003-4 2025-01-02 60 UTM PAGADA No cumplir el Comité Paritario de Higiene y Seguridad las funciones encomendadas por la ley.
1337/22/006-1 2024-12-09 60 UTM PAGADA No cumplir acuerdos del Departamento de Prevención de Riesgos/Comité Paritario de Higiene y Seguridad.
1337/22/006-2 2024-12-09 60 UTM PAGADA No contar con servicios higiénicos según los requisitos mínimos legales.
1337/22/006-3 2024-12-09 60 UTM PAGADA No realizar medidas preventivas ante enfermedades profesionales.
1337/22/006-5 2024-12-09 60 UTM PAGADA No suprimir los factores de peligro en el lugar de trabajo.
8336/24/029-1 2024-08-06 60 UTM PAGADA No trasladar a trabajador afectado por enfermedad profesional a otra faena no nociva.
8336/24/029-2 2024-08-06 60 UTM PAGADA No asesorar y desarrollar el Departamento de Prevención de Riesgos lo pertinente con las funciones mínimas.
8366/23/004-3 2024-04-22 60 UTM PAGADA Exceder la jornada ordinaria diaria (semanal).
1468/24/008-1 2024-04-01 60 UTM PAGADA No contener el reglamento interno las cláusulas mínimas establecida por la ley.
7911/22/007-1 2023-08-25 60 UTM PAGADA No registrar la jornada de trabajo el experto en prevención de riesgos.
7911/22/007-4 2023-08-25 30 UTM PAGADA No suprimir los factores de peligro en el lugar de trabajo.
4260/23/003-1 2023-04-13 2 IMM PAGADA No exhibir  toda la documentación necesaria para efectuar la conciliación
7911/22/007-3 2022-12-29 60 UTM PAGADA No tomar todas las medidas necesarias para proteger eficazmente la vida y salud de los trabajadores.
8336/21/030-1 2021-11-28 30 UTM PAGADA No cumplir estipulaciones de instrumento colectivo.
8336/20/039-1 2021-04-26 60 UTM PAGADA Investigación por acoso sexual sin el procedimiento establecido en la ley.

Executed fines only (multas ejecutoriadas); fines still under administrative or judicial review are not in the DT registry.