EE was opening the gate when he slipped and fell and somehow broke his leg.
Brown Canyon Stone Works LLC: 78 MSHA citations Metal/Non-Metal
Brown Canyon Stone Works LLC has $11K in proposed MSHA penalties and $0 outstanding across 0 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Brown Canyon Stone Works LLC.
- Fatalities
- 0
- Total incidents
- 10
- Years on record
- 1999–2011
- Latest incident
- Sep 2011
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Brown Canyon Stone Works LLC has $11K in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2025-05-08
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Quartz, respirable, >1% Qtz61 over
- Respirable dust, <.1mg7
Show the individual readings (13)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2009-09-29 | Quartz, respirable, >1% Qtz | 0.41 | 0.33 | 1.24 | Stone Polisher/Cutter |
| 2025-05-08 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2023-09-26 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2018-08-28 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2018-08-28 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2018-08-28 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2010-05-27 | Respirable dust, <.1mg | 0 | Bagging Operator | ||
| 2009-09-29 | Quartz, respirable, >1% Qtz | 0.25 | 0.37 | 0.68 | Stone Polisher/Cutter |
| 2009-09-29 | Quartz, respirable, >1% Qtz | 0.17 | 0.22 | 0.77 | Stone Polisher/Cutter |
| 2004-03-10 | Quartz, respirable, >1% Qtz | 0.29 | 0.32 | 0.91 | Backhoe Operator |
| 2004-03-10 | Quartz, respirable, >1% Qtz | 0.22 | 0.32 | 0.69 | Laborer, Bullgang |
| 2004-03-10 | Respirable dust, <.1mg | 0 | Laborer, Bullgang | ||
| 2004-03-10 | Quartz, respirable, >1% Qtz | 0.13 | 1.09 | 0.12 | Front-end Loader Operator |
Area samples (mill and shop air)
Last sampled: 2016-05-25, 10 years agoShow the individual readings (2)
| Date | Contaminant | Concentration | Limit | Conc / limit | Area sampled |
|---|---|---|---|---|---|
| 2016-05-25 | Quartz, respirable, >1% Qtz | 0.27 | SF ACTIVE MINING | ||
| 2016-05-25 | Respirable dust, <.1mg | 0 | SF ACTIVE MINING |
Brown Canyon Stone Works LLC recorded 8.33 reportable injury cases per 100 full-time workers in 2001.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2001 * | 8.33 | 0.00 | 0.000 |
| 2000 * | 27.78 | 27.78 | 0.000 |
- Hi Ball Blasting 1995 to 1997
- Acme Stone 1997 to 1999
- B M W Stone Inc 1999 to 2013
- Western Construction Materials LLC 2013 to present
| Year | Employees |
|---|---|
| 2026 | 2 |
| 2025 | 2 |
| 2024 | 2 |
| 2023 | 2 |
| 2022 | 2 |
| 2021 | 2 |
| 2020 | 2 |
| 2019 | 2 |
| 2018 | 2 |
| 2017 | 2 |
| 2016 | 2 |
| 2015 | 2 |
| 2014 | 2 |
| 2013 | 2 |
| 2012 | 4 |
| 2011 | 5 |
| 2010 | 6 |
| 2009 | 6 |
| 2008 | 9 |
| 2007 | 11 |
| 2006 | 11 |
| 2005 | 12 |
| 2004 | 11 |
| 2003 | 9 |
| 2002 | 14 |
| 2001 | 12 |
| 2000 | 11 |
Brown Canyon Stone Works LLC sits in Summit County, Utah, where the Census mining category is 0.4% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 520 | 0 | 0 | 0.0 |
| 2026 Q1 | 460 | 0 | 0 | 0.0 |
| 2025 Q4 | 420 | 0 | 0 | 0.0 |
| 2025 Q2 | 432 | 3 | 0 | 6944.4 |
| 2025 Q1 | 418 | 0 | 0 | 0.0 |
| 2024 Q4 | 358 | 0 | 0 | 0.0 |
| 2024 Q3 | 412 | 0 | 0 | 0.0 |
| 2024 Q2 | 408 | 0 | 0 | 0.0 |
Show 90 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q1 | 322 | 3 | 0 | 9316.8 |
| 2023 Q4 | 264 | 0 | 0 | 0.0 |
| 2023 Q3 | 268 | 0 | 0 | 0.0 |
| 2023 Q2 | 240 | 0 | 0 | 0.0 |
| 2023 Q1 | 150 | 6 | 1 | 40000.0 |
| 2022 Q4 | 330 | 0 | 0 | 0.0 |
| 2022 Q3 | 525 | 0 | 0 | 0.0 |
| 2022 Q2 | 510 | 0 | 0 | 0.0 |
| 2022 Q1 | 380 | 0 | 0 | 0.0 |
| 2021 Q4 | 360 | 2 | 2 | 5555.6 |
| 2021 Q3 | 460 | 0 | 0 | 0.0 |
| 2021 Q2 | 480 | 0 | 0 | 0.0 |
| 2021 Q1 | 320 | 3 | 0 | 9375.0 |
| 2020 Q4 | 280 | 0 | 0 | 0.0 |
| 2020 Q3 | 420 | 0 | 0 | 0.0 |
| 2020 Q2 | 345 | 1 | 0 | 2898.6 |
| 2020 Q1 | 280 | 0 | 0 | 0.0 |
| 2019 Q4 | 160 | 0 | 0 | 0.0 |
| 2019 Q3 | 480 | 0 | 0 | 0.0 |
| 2019 Q2 | 450 | 3 | 1 | 6666.7 |
| 2019 Q1 | 480 | 0 | 0 | 0.0 |
| 2018 Q4 | 440 | 0 | 0 | 0.0 |
| 2018 Q3 | 624 | 4 | 1 | 6410.3 |
| 2018 Q2 | 580 | 0 | 0 | 0.0 |
| 2018 Q1 | 540 | 0 | 0 | 0.0 |
| 2017 Q4 | 160 | 0 | 0 | 0.0 |
| 2017 Q3 | 180 | 6 | 0 | 33333.3 |
| 2017 Q2 | 222 | 0 | 0 | 0.0 |
| 2017 Q1 | 216 | 0 | 0 | 0.0 |
| 2016 Q4 | 130 | 0 | 0 | 0.0 |
| 2016 Q3 | 140 | 0 | 0 | 0.0 |
| 2016 Q2 | 86 | 2 | 0 | 23255.8 |
| 2016 Q1 | 74 | 0 | 0 | 0.0 |
| 2015 Q4 | 40 | 0 | 0 | 0.0 |
| 2015 Q3 | 80 | 2 | 1 | 25000.0 |
| 2015 Q2 | 74 | 0 | 0 | 0.0 |
| 2015 Q1 | 96 | 0 | 0 | 0.0 |
| 2014 Q4 | 86 | 0 | 0 | 0.0 |
| 2014 Q3 | 102 | 0 | 0 | 0.0 |
| 2014 Q2 | 99 | 0 | 0 | 0.0 |
| 2014 Q1 | 139 | 0 | 0 | 0.0 |
| 2013 Q4 | 88 | 0 | 0 | 0.0 |
| 2012 Q1 | 1,320 | 0 | 0 | 0.0 |
| 2011 Q4 | 1,475 | 1 | 0 | 678.0 |
| 2011 Q3 | 1,724 | 0 | 0 | 0.0 |
| 2011 Q2 | 2,538 | 2 | 0 | 788.0 |
| 2011 Q1 | 1,901 | 0 | 0 | 0.0 |
| 2010 Q4 | 2,545 | 0 | 0 | 0.0 |
| 2010 Q3 | 438 | 0 | 0 | 0.0 |
| 2010 Q2 | 2,396 | 3 | 1 | 1252.1 |
| 2010 Q1 | 1,862 | 0 | 0 | 0.0 |
| 2009 Q4 | 2,072 | 1 | 0 | 482.6 |
| 2009 Q3 | 3,597 | 1 | 0 | 278.0 |
| 2009 Q2 | 2,540 | 0 | 0 | 0.0 |
| 2009 Q1 | 1,806 | 0 | 0 | 0.0 |
| 2008 Q4 | 5,721 | 0 | 0 | 0.0 |
| 2008 Q3 | 4,100 | 0 | 0 | 0.0 |
| 2008 Q2 | 4,236 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,879 | 0 | 0 | 0.0 |
| 2007 Q4 | 4,758 | 0 | 0 | 0.0 |
| 2007 Q3 | 5,356 | 2 | 0 | 373.4 |
| 2007 Q2 | 2,589 | 0 | 0 | 0.0 |
| 2007 Q1 | 3,502 | 1 | 0 | 285.6 |
| 2006 Q4 | 4,315 | 0 | 0 | 0.0 |
| 2006 Q3 | 4,465 | 0 | 0 | 0.0 |
| 2006 Q2 | 4,778 | 0 | 0 | 0.0 |
| 2006 Q1 | 5,750 | 0 | 0 | 0.0 |
| 2005 Q4 | 4,413 | 0 | 0 | 0.0 |
| 2005 Q3 | 5,055 | 0 | 0 | 0.0 |
| 2005 Q2 | 5,202 | 0 | 0 | 0.0 |
| 2005 Q1 | 3,594 | 0 | 0 | 0.0 |
| 2004 Q4 | 4,027 | 0 | 0 | 0.0 |
| 2004 Q3 | 6,081 | 2 | 0 | 328.9 |
| 2004 Q2 | 4,590 | 0 | 0 | 0.0 |
| 2004 Q1 | 3,907 | 5 | 1 | 1279.8 |
| 2003 Q4 | 3,250 | 0 | 0 | 0.0 |
| 2003 Q3 | 3,750 | 0 | 0 | 0.0 |
| 2003 Q2 | 5,440 | 1 | 0 | 183.8 |
| 2003 Q1 | 5,500 | 0 | 0 | 0.0 |
| 2002 Q4 | 5,200 | 0 | 0 | 0.0 |
| 2002 Q3 | 4,358 | 0 | 0 | 0.0 |
| 2002 Q1 | 5,275 | 4 | 2 | 758.3 |
| 2001 Q4 | 6,000 | 0 | 0 | 0.0 |
| 2001 Q3 | 6,000 | 7 | 2 | 1166.7 |
| 2001 Q2 | 6,000 | 0 | 0 | 0.0 |
| 2001 Q1 | 6,000 | 0 | 0 | 0.0 |
| 2000 Q4 | 6,000 | 0 | 0 | 0.0 |
| 2000 Q3 | 6,000 | 6 | 1 | 1000.0 |
| 2000 Q2 | 4,800 | 0 | 0 | 0.0 |
| 2000 Q1 | 4,800 | 0 | 0 | 0.0 |
Reportable incidents
10 on file2011 · 1 incident
2009 · 1 incident
Caught finger between 2 rocks while palliating them. Splitting the skin open, a few stitches and a bandage.
2007 · 1 incident
Rock slipped while palletizing and smashed finger between two rocks.
2004 · 1 incident
LIFTING ROCK TO SET IT TO BE SPLIT BY HAMMER AND CHISEL, WHEN HIS BACK POPPED. (ACCIDENT WAS NOT REPORTED TO SUPERVISOR FOR 1 WEEK.)
2003 · 1 incident
STONE SLIPPED OUT OF EE'S HAND AND SMASHED HIS LITTLE FINGER AGAINST THE PALLET HE WAS STACKING.
2001 · 1 incident
GOT TENDONITIS FROM SWINGING A 4LB SPLITTING HAMMER AFTER BEING ON VACATION FOR TWO MONTHS.
2000 · 3 incidents
PULLED MUSCLE IN BACK WHILE LIFTING A ROCK.
BOULDER SPLIT & ROLLED ON TO FOOT
DROPPED ROCK ON FOOT WHILE SPLITTING.
1999 · 1 incident
EMPLOYEE GOT DUST IN HIS EYES WHILE HE WAS EATING HIS LUNCH. THE WIND WAS BLOWING AT THE TIME.