Mining Incidents

Cantera Materials Crushing Plant: 1 recorded fatality Metal/Non-Metal

Cantera Materials L.L.C. · Surface
Controlled by Gabriel DeAnda
Sierra Vista, Cochise County, AZ  ·  Abandoned
MSHA Mine ID: 0202451

Cantera Materials Crushing Plant has $9K in proposed MSHA penalties and $7K outstanding across 6 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Cantera Materials Crushing Plant.

Fatalities
1
Total incidents
4
Years on record
1999–2009
Latest incident
Sep 2009
Compliance record
MSHA citations since 2000
69
citations
24
significant & substantial
$9,137
proposed penalties
$2,096
paid to date
23% of proposed penalties paid to date, a $7,041 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
28
inspections on record
325
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 325 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

Cantera Materials Crushing Plant has $9K in proposed MSHA penalties and $7K outstanding across 6 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$9K
proposed penalties
$9K
current assessed
$2K
paid to date
$7K
outstanding
67 assessments are final orders; 6 contested dockets.
Of $131K in penalties contested before the Commission, $60K was upheld in final decisions.
As of the most recent assessment on 2013-10-22.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
35.8%
significant & substantial
3.0%
high negligence or reckless
37.3%
reasonably likely or greater
38.8%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 1.5% low, 95.5% moderate, 3.0% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
4 citations taken to the federal commission · 6% of citations on record
  • Stood as issued 4 · 100%
100%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 3 decided S&S contests · industry: 79%
0%
Penalty reduction in decided contests
$2K proposed, $2K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2010-12-21.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
WEST20010046M Settlement Weisberger 2001 $125K → $55K
WEST 2011-435M Default Lesnick 2011 $2K → $2K
WEST20000532M Settlement Feldman 2001 $2K → $1K
WEST20010131M Settlement Weisberger 2001 $947 → $676
WEST20020393M Settlement Cetti 2002 $539 → $387
WEST20020445M Default Cetti 2002 $166 → $166
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2010-05-19, 16 years ago
0%
of limit-tested samples over the exposure limit
9
samples
8
limit-tested
Most sampled contaminants
  • Quartz, respirable, >1% Qtz8
  • Respirable dust, <.1mg1
Show the individual readings (9)
Date Contaminant Concentration Limit Conc / limit Occupation
2010-05-19 Quartz, respirable, >1% Qtz 0.17 0.46 0.37 Welder, etc.
2010-05-19 Quartz, respirable, >1% Qtz 0.26 0.95 0.27 Front-end Loader Operator
2010-05-19 Quartz, respirable, >1% Qtz 0.29 0.44 0.66 Crusher Oper/Worker
2005-05-25 Quartz, respirable, >1% Qtz 0.33 0.58 0.57 Crusher Oper/Worker
2005-05-25 Quartz, respirable, >1% Qtz 0.2 1.07 0.19 Laborer, Bullgang
2005-05-25 Respirable dust, <.1mg 0 Front-end Loader Operator
2000-09-14 Quartz, respirable, >1% Qtz 0.49 0.89 0.55 Front-end Loader Operator
2000-09-14 Quartz, respirable, >1% Qtz 0.57 0.87 0.66 Washer Operator
2000-09-14 Quartz, respirable, >1% Qtz 0.27 0.64 0.42 Crusher Oper/Worker
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Ke & G Development 1988 to 1989
  2. AZ Con Agg 1989 to 2011
  3. Cantera Materials L.L.C. 2011 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2012 5
2011 5
2010 4
2009 5
2008 4
2007 5
2006 5
2005 5
2004 4
2003 6
2002 6
2001 7
2000 6
Source: MSHA quarterly employment and production, updated weekly.

Cantera Materials Crushing Plant sits in Cochise County, Arizona, where the Census mining category is 0.7% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Cochise County, Arizona · Population 125,458
0.7%
Mining share of county employment
$58,970
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2012 Q4 1,866 1 0 535.9
2012 Q2 1,082 4 2 3696.9
2012 Q1 2,232 0 0 0.0
2011 Q4 2,321 4 0 1723.4
2011 Q3 1,981 0 0 0.0
2011 Q2 151 2 0 13245.0
2010 Q4 876 6 3 6849.3
2010 Q3 1,033 0 0 0.0
Show 42 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2010 Q2 0 11 3
2010 Q1 1,073 0 0 0.0
2009 Q4 1,359 0 0 0.0
2009 Q3 2,289 0 0 0.0
2009 Q2 1,440 0 0 0.0
2009 Q1 868 1 0 1152.1
2008 Q4 638 0 0 0.0
2008 Q3 1,024 0 0 0.0
2008 Q2 1,345 0 0 0.0
2008 Q1 1,607 0 0 0.0
2007 Q4 1,223 0 0 0.0
2007 Q3 2,675 0 0 0.0
2007 Q2 546 1 0 1831.5
2007 Q1 1,665 0 0 0.0
2006 Q4 2,780 0 0 0.0
2006 Q3 2,710 0 0 0.0
2006 Q2 2,928 0 0 0.0
2006 Q1 1,954 0 0 0.0
2005 Q4 2,106 0 0 0.0
2005 Q3 2,825 0 0 0.0
2005 Q2 2,486 2 0 804.5
2005 Q1 1,456 0 0 0.0
2004 Q4 1,795 0 0 0.0
2004 Q3 974 0 0 0.0
2004 Q2 1,789 0 0 0.0
2004 Q1 1,485 0 0 0.0
2003 Q4 1,533 0 0 0.0
2003 Q3 1,108 0 0 0.0
2003 Q2 2,485 0 0 0.0
2003 Q1 3,210 3 1 934.6
2002 Q4 1,885 0 0 0.0
2002 Q3 1,478 0 0 0.0
2002 Q2 2,680 0 0 0.0
2002 Q1 2,450 4 3 1632.7
2001 Q4 3,217 0 0 0.0
2001 Q3 2,876 6 3 2086.2
2001 Q2 3,162 0 0 0.0
2001 Q1 2,462 0 0 0.0
2000 Q4 467 0 0 0.0
2000 Q3 1,839 9 5 4894.0
2000 Q2 3,430 0 0 0.0
2000 Q1 4,928 0 0 0.0

Fatalities at this mine

1 recorded
July 27, 1999 AZ · Metal/Non-Metal warehouseman, bagger, palletizer/stacker, store keeper, packager, fabricator, cleaning plant operator Fatality · POWERED HAULAGE
AZ Con Agg · Caught in, under or between collapsing material or buildings

THE VICTIM ENTERED A HOPPER APPARENTLY TO LOOSEN MATERIAL AND BECAME ENGULFED. THE HOPPER IS NOT EASILY ACCESIBLE.

Reportable incidents

3 on file (excluding fatalities above)

2009 · 1 incident

September 24, 2009 AZ · Metal/Non-Metal front-end loader, scraper-loader operator, pan operator, payloader, scraper rig operator SLIP OR FALL OF PERSON
AZ Con Agg · Fall onto or against objects

While dismounting from loader, employee slipped and scraped right forearm and smacked his chest on the loader.

2006 · 1 incident

September 28, 2006 AZ · Metal/Non-Metal front-end loader, scraper-loader operator, pan operator, payloader, scraper rig operator SLIP OR FALL OF PERSON
AZ Con Agg · Over-exertion (Not Elsewhere Classified)

Employee slipped on steering fluid as he climbed the ladder.

2002 · 1 incident

June 7, 2002 AZ · Metal/Non-Metal warehouseman, bagger, palletizer/stacker, store keeper, packager, fabricator, cleaning plant operator STRIKING OR BUMPING
AZ Con Agg · Struck against stationary object

EE WAS WALKING ALONG CONVEYOR & HIT HIS RIGHT INDEX FINGER AGAINST A LOOSE GUARD THAT WAS PROTRUDING FROM UNDER THE CONVEYOR.