Mining Incidents

Crusher #1: 105 MSHA citations Metal/Non-Metal

Controlled by Kilen Boe
Thief River Falls, Pennington County, MN  ·  Abandoned
MSHA Mine ID: 2103708

Crusher #1 has $119K in proposed MSHA penalties and $2K outstanding across 5 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Crusher #1.

Fatalities
0
Total incidents
1
Years on record
2016
Latest incident
Nov 2016
Compliance record
MSHA citations since 2010
105
citations
35
significant & substantial
$118,505
proposed penalties
$79,760
paid to date
67% of proposed penalties paid to date, a $38,745 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2010
15
inspections on record
250
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 250 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

Crusher #1 has $119K in proposed MSHA penalties and $2K outstanding across 5 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$119K
proposed penalties
$82K
current assessed
$80K
paid to date
$2K
outstanding
105 assessments are final orders; 5 contested dockets.
Of $87K in penalties contested before the Commission, $51K was upheld in final decisions.
As of the most recent assessment on 2016-10-05.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
33.3%
significant & substantial
11.4%
high negligence or reckless
33.3%
reasonably likely or greater
62.9%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 17.1% low, 71.4% moderate, 11.4% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
26 citations taken to the federal commission · 25% of citations on record
  • Settled 26 · 100%
81%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 21 decided S&S contests · industry: 79%
46%
Penalty reduction in decided contests
$102K proposed, $56K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2015-05-12.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
LAKE 2012-489M Settlement Miller 2013 $32K → $14K
LAKE 2013-126M Settlement Miller 2013 $29K → $23K
LAKE 2012-292M Settlement Miller 2013 $22K → $10K
LAKE 2013-127M Settlement Miller 2013 $2K → $750
LAKE 2012-291M Settlement Miller 2013 $2K → $2K
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2011-08-16, 15 years ago
3
samples
0
limit-tested
Most sampled contaminants
  • Unlisted Particulate, respirable, <1% Qtz2
  • Respirable dust, <.1mg1
Show the individual readings (3)
Date Contaminant Concentration Limit Conc / limit Occupation
2011-08-16 Unlisted Particulate, respirable, <1% Qtz 0.14 Crusher Oper/Worker
2011-08-16 Unlisted Particulate, respirable, <1% Qtz 0.14 Front-end Loader Operator
2011-08-16 Respirable dust, <.1mg 0 Crusher Oper/Worker
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Minn-Dak Asphalt, Inc 2010 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2016 2
2015 2
2014 0
2013 3
2012 5
2011 5
2010 5
Source: MSHA quarterly employment and production, updated weekly.

Crusher #1 sits in Pennington County, Minnesota, where the Census mining category is 0.2% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Pennington County, Minnesota · Population 13,877
0.2%
Mining share of county employment
$72,561
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2016 Q4 1,179 13 7 11026.3
2016 Q3 2,140 1 0 467.3
2016 Q2 1,005 0 0 0.0
2016 Q1 0 0 0
2015 Q4 1,280 2 0 1562.5
2015 Q3 1,594 3 0 1882.1
2015 Q2 0 0 0
2015 Q1 0 0 0
Show 18 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2014 Q4 0 0 0
2014 Q3 0 0 0
2014 Q2 0 0 0
2014 Q1 0 0 0
2013 Q4 673 0 0 0.0
2013 Q3 1,921 27 6 14055.2
2013 Q2 1,559 0 0 0.0
2013 Q1 0 0 0
2012 Q4 1,639 1 0 610.1
2012 Q3 4,743 4 4 843.3
2012 Q2 2,655 0 0 0.0
2012 Q1 0 0 0
2011 Q4 2,413 28 8 11603.8
2011 Q3 5,027 15 5 2983.9
2011 Q2 2,927 0 0 0.0
2011 Q1 0 0 0
2010 Q4 463 0 0 0.0
2010 Q3 910 11 5 12087.9
No fatalities recorded at this mine.

Reportable incidents

1 on file

2016 · 1 incident

November 3, 2016 MN · Metal/Non-Metal bulldozer operator, universal operator, heavy equipment operator, operating engineer SLIP OR FALL OF PERSON
Minn-Dak Asphalt, Inc · Fall from machine

Employee was stepping down on ladder from rock crusher, missed a step and was unable to grab back onto ladder and fell approx. 5ft to ground, landing on left side of body.