Employee was getting out of the skid steer and slipped and fell on their knee
Dinn Quarry Metal/Non-Metal
Dinn Quarry has $66K in proposed MSHA penalties and $0 outstanding across 4 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Dinn Quarry.
- Fatalities
- 0
- Total incidents
- 7
- Years on record
- 2013–2026
- Latest incident
- Jan 2026
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Dinn Quarry has $66K in proposed MSHA penalties and $0 outstanding across 4 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 12,515 | 3 | 1 | 239.7 |
| 2025 Q3 | 13,061 | 2 | 0 | 153.1 |
| 2025 Q2 | 13,086 | 0 | 0 | 0.0 |
| 2025 Q1 | 10,955 | 13 | 4 | 1186.7 |
| 2024 Q4 | 13,228 | 0 | 0 | 0.0 |
| 2024 Q3 | 14,346 | 12 | 7 | 836.5 |
| 2024 Q2 | 14,154 | 0 | 0 | 0.0 |
| 2024 Q1 | 10,777 | 1 | 0 | 92.8 |
Show 77 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 9,181 | 0 | 0 | 0.0 |
| 2023 Q3 | 11,839 | 0 | 0 | 0.0 |
| 2023 Q2 | 11,291 | 6 | 2 | 531.4 |
| 2023 Q1 | 11,059 | 0 | 0 | 0.0 |
| 2022 Q4 | 13,101 | 8 | 2 | 610.6 |
| 2022 Q3 | 12,736 | 0 | 0 | 0.0 |
| 2022 Q2 | 12,097 | 2 | 1 | 165.3 |
| 2022 Q1 | 13,068 | 0 | 0 | 0.0 |
| 2021 Q4 | 11,092 | 8 | 2 | 721.2 |
| 2021 Q3 | 11,408 | 0 | 0 | 0.0 |
| 2021 Q2 | 8,667 | 15 | 11 | 1730.7 |
| 2021 Q1 | 6,447 | 8 | 5 | 1240.9 |
| 2020 Q4 | 7,047 | 0 | 0 | 0.0 |
| 2020 Q3 | 7,760 | 1 | 0 | 128.9 |
| 2020 Q2 | 6,872 | 0 | 0 | 0.0 |
| 2020 Q1 | 5,515 | 0 | 0 | 0.0 |
| 2019 Q4 | 5,532 | 1 | 1 | 180.8 |
| 2019 Q3 | 6,063 | 3 | 0 | 494.8 |
| 2019 Q2 | 5,253 | 0 | 0 | 0.0 |
| 2019 Q1 | 5,449 | 0 | 0 | 0.0 |
| 2018 Q4 | 6,361 | 2 | 1 | 314.4 |
| 2018 Q3 | 8,130 | 3 | 0 | 369.0 |
| 2018 Q2 | 8,060 | 0 | 0 | 0.0 |
| 2018 Q1 | 6,175 | 0 | 0 | 0.0 |
| 2017 Q4 | 6,623 | 1 | 0 | 151.0 |
| 2017 Q3 | 6,814 | 3 | 1 | 440.3 |
| 2017 Q2 | 6,747 | 0 | 0 | 0.0 |
| 2017 Q1 | 6,671 | 0 | 0 | 0.0 |
| 2016 Q4 | 7,912 | 3 | 2 | 379.2 |
| 2016 Q3 | 7,755 | 1 | 0 | 128.9 |
| 2016 Q2 | 8,443 | 0 | 0 | 0.0 |
| 2016 Q1 | 7,587 | 3 | 1 | 395.4 |
| 2015 Q4 | 8,780 | 0 | 0 | 0.0 |
| 2015 Q3 | 8,131 | 0 | 0 | 0.0 |
| 2015 Q2 | 7,703 | 3 | 0 | 389.5 |
| 2015 Q1 | 6,413 | 5 | 1 | 779.7 |
| 2014 Q4 | 6,141 | 0 | 0 | 0.0 |
| 2014 Q3 | 7,037 | 0 | 0 | 0.0 |
| 2014 Q2 | 6,653 | 3 | 1 | 450.9 |
| 2014 Q1 | 4,049 | 0 | 0 | 0.0 |
| 2013 Q4 | 6,307 | 3 | 1 | 475.7 |
| 2013 Q3 | 6,662 | 0 | 0 | 0.0 |
| 2013 Q2 | 6,112 | 0 | 0 | 0.0 |
| 2013 Q1 | 5,406 | 5 | 1 | 924.9 |
| 2012 Q4 | 6,301 | 0 | 0 | 0.0 |
| 2012 Q3 | 7,537 | 1 | 0 | 132.7 |
| 2012 Q2 | 7,005 | 0 | 0 | 0.0 |
| 2012 Q1 | 4,368 | 0 | 0 | 0.0 |
| 2011 Q4 | 7,021 | 2 | 1 | 284.9 |
| 2011 Q3 | 7,142 | 0 | 0 | 0.0 |
| 2011 Q2 | 6,825 | 0 | 0 | 0.0 |
| 2011 Q1 | 5,402 | 1 | 0 | 185.1 |
| 2010 Q4 | 6,540 | 4 | 0 | 611.6 |
| 2010 Q3 | 6,110 | 3 | 0 | 491.0 |
| 2010 Q2 | 6,495 | 0 | 0 | 0.0 |
| 2010 Q1 | 4,465 | 0 | 0 | 0.0 |
| 2009 Q4 | 5,632 | 0 | 0 | 0.0 |
| 2009 Q3 | 5,686 | 1 | 0 | 175.9 |
| 2009 Q2 | 5,809 | 0 | 0 | 0.0 |
| 2009 Q1 | 4,139 | 1 | 1 | 241.6 |
| 2008 Q4 | 5,355 | 1 | 0 | 186.7 |
| 2008 Q3 | 5,269 | 2 | 0 | 379.6 |
| 2008 Q2 | 5,336 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,940 | 0 | 0 | 0.0 |
| 2007 Q4 | 5,615 | 0 | 0 | 0.0 |
| 2007 Q3 | 6,261 | 0 | 0 | 0.0 |
| 2007 Q2 | 5,514 | 0 | 0 | 0.0 |
| 2007 Q1 | 4,119 | 0 | 0 | 0.0 |
| 2006 Q4 | 4,904 | 0 | 0 | 0.0 |
| 2006 Q3 | 5,674 | 0 | 0 | 0.0 |
| 2006 Q2 | 4,331 | 0 | 0 | 0.0 |
| 2006 Q1 | 4,258 | 0 | 0 | 0.0 |
| 2005 Q4 | 3,862 | 1 | 0 | 258.9 |
| 2005 Q3 | 4,107 | 0 | 0 | 0.0 |
| 2005 Q2 | 3,320 | 0 | 0 | 0.0 |
| 2005 Q1 | 2,472 | 0 | 0 | 0.0 |
| 2004 Q4 | 2,359 | 0 | 0 | 0.0 |
Reportable incidents
7 on file2026 · 1 incident
2025 · 1 incident
Miner was washing the pins to disengage the bucket of skid steer. The bucket disengaged and fell on EE's right foot
2018 · 1 incident
Employees were placing a 200lb steel plate on a structure, the plate slipped off and fell 15" striking employee's left foot just behind the steel toe portion of their boot.
2016 · 2 incidents
EE went to tower 1 to check clips on conveyor belt. Ee grabbed ladder at hinge point, when ee placed weight on the ladder, it smashed/pinched left pinky, ring & middle fingers. Resulting in the amputation of middle finger, just below the nail. EE recalls pulling hand out, from the hinge point, which ee thinks resulted in the separation of middle finger.
2 ee were cutting a section of conveyor belt w/a straight edge & a razor knife. 1 ee was holding the straight edge while the other was cutting the belt on the ground when the knife slipped & cut the right hand of the employee holding the straight edge. Resulting in a 1" laceration. It was determined that the employee needs medical attention & was taken to Prompt Med
2015 · 1 incident
Reinstalling screen panels (punch plate) on tower 1 screen. While installing last panel on the top deck employee had his hand between a rivet and the hook rail on the screen panel catching the end of his left thumb when the panel was pushed into place. This caused a laceration to the left thumb requiring 3 stitches.
2013 · 1 incident
EE was digging frozen material out of a feed chute that transfers rock from an overhead surge bin onto a belt feeder. He reached into chute to remove piece of rock, placing his arm under opening of bin. Piece of frozen lime fell/rolled from side of bin, striking his arm. Quarry had rec'd apprx 4" of rain over weekend, then temps dropped, washing material onto belts & freezing it
The full compliance file on Dinn Quarry
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.