WAS PLACING A PIECE OF METAL ON BIN SIDE, IT SLIPPED CAUSING HIM TO LOOSE BALANCE. METAL HIT HIM ON SIDE AND BACK.
Eagle Rock Quarry Metal/Non-Metal
Eagle Rock Quarry has $2K in proposed MSHA penalties and $0 outstanding across 3 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Eagle Rock Quarry.
- Fatalities
- 0
- Total incidents
- 9
- Years on record
- 1989–1999
- Latest incident
- Dec 1999
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Eagle Rock Quarry has $2K in proposed MSHA penalties and $0 outstanding across 3 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2010 Q3 | 599 | 0 | 0 | 0.0 |
| 2010 Q2 | 593 | 0 | 0 | 0.0 |
| 2010 Q1 | 1,107 | 0 | 0 | 0.0 |
| 2009 Q4 | 1,224 | 0 | 0 | 0.0 |
| 2009 Q3 | 2,847 | 4 | 2 | 1405.0 |
| 2009 Q2 | 665 | 0 | 0 | 0.0 |
| 2009 Q1 | 1,274 | 0 | 0 | 0.0 |
| 2008 Q4 | 1,037 | 0 | 0 | 0.0 |
Show 35 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2008 Q3 | 1,950 | 1 | 0 | 512.8 |
| 2008 Q2 | 1,423 | 0 | 0 | 0.0 |
| 2008 Q1 | 1,325 | 0 | 0 | 0.0 |
| 2007 Q4 | 997 | 0 | 0 | 0.0 |
| 2007 Q3 | 1,259 | 0 | 0 | 0.0 |
| 2007 Q2 | 2,356 | 0 | 0 | 0.0 |
| 2007 Q1 | 996 | 0 | 0 | 0.0 |
| 2006 Q4 | 1,904 | 0 | 0 | 0.0 |
| 2006 Q3 | 2,182 | 0 | 0 | 0.0 |
| 2006 Q2 | 2,039 | 0 | 0 | 0.0 |
| 2006 Q1 | 1,912 | 0 | 0 | 0.0 |
| 2005 Q4 | 1,933 | 0 | 0 | 0.0 |
| 2005 Q3 | 2,675 | 0 | 0 | 0.0 |
| 2005 Q2 | 1,776 | 0 | 0 | 0.0 |
| 2005 Q1 | 1,723 | 0 | 0 | 0.0 |
| 2004 Q4 | 1,506 | 0 | 0 | 0.0 |
| 2004 Q3 | 1,728 | 0 | 0 | 0.0 |
| 2004 Q2 | 1,602 | 0 | 0 | 0.0 |
| 2004 Q1 | 854 | 0 | 0 | 0.0 |
| 2003 Q4 | 1,168 | 0 | 0 | 0.0 |
| 2003 Q3 | 1,964 | 0 | 0 | 0.0 |
| 2003 Q2 | 1,072 | 0 | 0 | 0.0 |
| 2003 Q1 | 697 | 0 | 0 | 0.0 |
| 2002 Q4 | 1,211 | 0 | 0 | 0.0 |
| 2002 Q3 | 1,614 | 0 | 0 | 0.0 |
| 2002 Q2 | 1,689 | 0 | 0 | 0.0 |
| 2002 Q1 | 883 | 0 | 0 | 0.0 |
| 2001 Q4 | 2,217 | 0 | 0 | 0.0 |
| 2001 Q3 | 2,873 | 0 | 0 | 0.0 |
| 2001 Q2 | 2,838 | 14 | 4 | 4933.1 |
| 2001 Q1 | 2,668 | 0 | 0 | 0.0 |
| 2000 Q4 | 2,544 | 0 | 0 | 0.0 |
| 2000 Q3 | 2,985 | 4 | 2 | 1340.0 |
| 2000 Q2 | 3,177 | 0 | 0 | 0.0 |
| 2000 Q1 | 4,886 | 0 | 0 | 0.0 |
Reportable incidents
9 on file1999 · 3 incidents
EMPLOYEE WAS PREPARING TO CHANGE A WIPER ON A SCRAPER WHEN A ROCK SLIPPED AND HIT EMPLOYEE ABOVELEFT EYEBROW.
PUSHING STOCK PILE W/LOADER WENT FORWARD TO DUMP-STOCKPILE UNDER RIGHT FRONT WHEEL GAVE, LOADER TURNED OVER ON RIGHT SIDE. ANKLE HIT THE LOADER.
1998 · 1 incident
EMPLOYEE WAS CHANGING CUTTING EDGE ON LOADER. BOLT SLIPPED AND PUSHED ITSELF IN AN UPWARD DIRECTION. EMPLOYEE PROCEEDED TO RELIVE WEIGHT ON CUTTING EDGE AND WEIGHT IMPACTED ITSELF INTO HAND.
1992 · 3 incidents
BOULDER LOCKED IN JAW CRUSHER. USED PRY BAR TO LOOSEN ROCK, PRY BAR SLIPPED WENT BETWEEN BAR AND ROCK SNAPPED BACK. CAUGHT THUMB BETWEEN ROCK AND SAFETY CHAIN.
OPENING 50 GALLON BARREL WITH SCREWDRIVER/ SCREWDRIVER HANDLE BROKE AND BLUNT END WENT THROUGH SHOE.
GRINDING OFF OLD WELD GRINDER JUMPED CAME BACK AND CUT HIS KNEE.
1990 · 1 incident
EMPLOYEE WAS PRYING A ROCK LOOSE AND PINCHED FINGER BETWEEN ROCK & PRY BAR.
1989 · 1 incident
EMPL WAS TRYING TO GET ROCK THROUGH CRUSHER WHEN ANOTHER ROCK FELL OFF FEEDER & FELL ON FOOT.
The full compliance file on Eagle Rock Quarry
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.