STEPPED IN HOLE AND TWISTED LEFT KNEE.
Hardshell Tipples Mine #1 Coal
Hardshell Tipples Mine #1 has $55K in proposed MSHA penalties and $29K outstanding across 5 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Hardshell Tipples Mine #1.
- Fatalities
- 0
- Total incidents
- 12
- Years on record
- 2002–2003
- Latest incident
- Aug 2003
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Hardshell Tipples Mine #1 has $55K in proposed MSHA penalties and $29K outstanding across 5 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.MSHA sampling at Hardshell Tipples Mine #1 shows respirable coal dust averaging 0.72 mg/m3 (85% compliant) across 231 samples.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2008 Q2 | 183 | 2 | 0 | 10929.0 |
| 2008 Q1 | 571 | 0 | 0 | 0.0 |
| 2007 Q2 | 0 | 0 | 0 | |
| 2007 Q1 | 2,780 | 1 | 0 | 359.7 |
| 2006 Q4 | 6,642 | 53 | 27 | 7979.5 |
| 2006 Q3 | 7,930 | 28 | 11 | 3530.9 |
| 2006 Q2 | 8,148 | 24 | 10 | 2945.5 |
| 2006 Q1 | 7,672 | 23 | 9 | 2997.9 |
Show 15 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2005 Q4 | 2,703 | 5 | 0 | 1849.8 |
| 2005 Q3 | 0 | 0 | 0 | |
| 2005 Q1 | 11,216 | 37 | 14 | 3298.9 |
| 2004 Q4 | 10,090 | 41 | 21 | 4063.4 |
| 2004 Q3 | 7,161 | 17 | 8 | 2374.0 |
| 2004 Q2 | 8,490 | 1 | 0 | 117.8 |
| 2004 Q1 | 1,203 | 1 | 0 | 831.3 |
| 2003 Q4 | 0 | 0 | 0 | |
| 2003 Q3 | 19,535 | 27 | 16 | 1382.1 |
| 2003 Q2 | 9,282 | 13 | 2 | 1400.6 |
| 2003 Q1 | 16,381 | 39 | 16 | 2380.8 |
| 2002 Q4 | 12,680 | 26 | 3 | 2050.5 |
| 2002 Q3 | 1,120 | 40 | 13 | 35714.3 |
| 2002 Q2 | 9,171 | 26 | 7 | 2835.0 |
| 2002 Q1 | 15,080 | 46 | 25 | 3050.4 |
Reportable incidents
12 on file2003 · 11 incidents
A PIECE OF DRAW ROCK FELL AND HIT HIM ON THE LEFT KNEE. (CONTUSION LEFT KNEE).
WORKING ON RAM CAR BATTERYS, TRYING TO REMOVE BATTERY LID. THE LID SPARKED ON THE BATTERY AND HE TRIED TO JUMP OFF THE BATTERYS AND SLIPPED AND FELL BETWEEN THE COAL RIB AND RAM CAR HURTING HI S LOWER BACK.
CUT RIGHT INDEX AND MIDDLE FINGER'S ON SCOOP CANOPY AND COAL RIB.
HE WAS LOADING ROOF PLATES AND CUT HIS HAND.
HE WAS TAKING PANEL BOARD OFF 482 SCOOP AND BOARD SWUNG DOWN AND CAUGHT THE END OF HIS MIDDLE FINGER ON HIS RIGHT HAND CRUSHING IT. THE TIP END OF MIDDLE FINGER ON HIS RIGHT HAND.
FELL OVER CAR CABLE; FOOT STUCK IN MUD.
ICE BUILT UP ON TRACK. JACKING TRACK UP OUT OF ICE AND GOB JACK HANDLE SLIPPED AND CAUGHT HIM ON LEFT SIDE OF HEAD IN FRONT OF EAR.
EMPLOYEE WAS USING A RAILROAD JACK TO RAISE TRACK WHEN THE BAR HE WAS USING SLIPPED & STRUCK HIM IN THE MOUTH.
ICE BUILD UP ON TRACK. WAS WALKING TO SECTION, SLIPPED ON ICE, FELL & HURT LOWER BACK.
SLIPPED ON ICE LANDED ON RIGHT WRIST CAUSING WRIST TO BREAK.
2002 · 1 incident
ROCK FELL OUT BETWEEN RIB AND BOLT. REPORT WAS FILLED OUT 2 DAYS LATER. EE RETURNED TO WORK THE NEXT DAY 7-30-02.
The full compliance file on Hardshell Tipples Mine #1
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.