Mining Incidents

Jordan Plant: 60 MSHA citations Metal/Non-Metal

Controlled by Berkshire Hathaway Inc
Moody, St Clair County, AL  ·  Active
MSHA Mine ID: 0103353

Jordan Plant has $13K in proposed MSHA penalties and $0 outstanding across 1 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Jordan Plant.

Fatalities
0
Total incidents
1
Years on record
2008
Latest incident
Jun 2008
Compliance record
MSHA citations since 2006
60
citations
18
significant & substantial
$12,527
proposed penalties
$12,527
paid to date
100% of proposed penalties paid to date, a $0 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2006
49
inspections on record
478
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 478 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

Jordan Plant has $13K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$13K
proposed penalties
$13K
current assessed
$13K
paid to date
$0
outstanding
60 assessments are final orders; 1 contested dockets.
Of $100 in penalties contested before the Commission, $100 was upheld in final decisions.
As of the most recent assessment on 2023-06-07.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
30.0%
significant & substantial
5.0%
high negligence or reckless
30.0%
reasonably likely or greater
46.7%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 5.0% low, 90.0% moderate, 5.0% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
1 citations taken to the federal commission · 2% of citations on record
  • Settled 1 · 100%
0%
Penalty reduction in decided contests
$100 proposed, $100 after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2013-04-30.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
SE 2013-370M Settlement Harner 2013 $100 → $100
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2022-09-13, 3 years ago
6
samples
0
limit-tested
Most sampled contaminants
  • Respirable dust, <.1mg6
Show the individual readings (6)
Date Contaminant Concentration Limit Conc / limit Occupation
2022-09-13 Respirable dust, <.1mg 0 Truck Driver
2022-09-13 Respirable dust, <.1mg 0 Backhoe Operator
2016-11-16 Respirable dust, <.1mg 0 Truck Driver
2016-11-16 Respirable dust, <.1mg 0 Bulldozer Operator
2016-11-16 Respirable dust, <.1mg 0 Backhoe Operator
2016-09-21 Respirable dust, <.1mg 0 Front-end Loader Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Jenkins Brick Company 2006 to 2011
  2. Acme Brick Tile & Stone, Inc. 2011 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2026 3
2025 3
2024 5
2023 5
2022 5
2021 5
2020 5
2019 5
2018 5
2017 5
2016 5
2015 6
2014 6
2013 5
2012 6
2011 4
2010 2
2009 5
2008 14
2007 15
2006 12
Source: MSHA quarterly employment and production, updated weekly.

Jordan Plant sits in St. Clair County, Alabama, where the Census mining category is 0.2% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
St. Clair County, Alabama · Population 92,903
0.2%
Mining share of county employment
$78,993
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2026 Q2 831 0 0 0.0
2026 Q1 914 0 0 0.0
2025 Q4 931 0 0 0.0
2025 Q3 966 0 0 0.0
2025 Q2 975 0 0 0.0
2025 Q1 943 0 0 0.0
2024 Q4 1,015 0 0 0.0
2024 Q3 1,343 0 0 0.0
Show 72 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2024 Q2 514 0 0 0.0
2024 Q1 1,392 0 0 0.0
2023 Q4 1,478 0 0 0.0
2023 Q3 1,341 0 0 0.0
2023 Q2 1,732 2 0 1154.7
2023 Q1 1,810 2 0 1105.0
2022 Q4 1,742 0 0 0.0
2022 Q3 1,745 1 0 573.1
2022 Q2 1,535 0 0 0.0
2022 Q1 1,537 0 0 0.0
2021 Q4 1,307 0 0 0.0
2021 Q3 1,725 0 0 0.0
2021 Q2 1,455 0 0 0.0
2021 Q1 1,933 0 0 0.0
2020 Q4 1,580 0 0 0.0
2020 Q3 1,850 0 0 0.0
2020 Q2 1,878 0 0 0.0
2020 Q1 2,435 0 0 0.0
2019 Q4 1,864 0 0 0.0
2019 Q3 1,700 0 0 0.0
2019 Q2 1,942 0 0 0.0
2019 Q1 1,959 1 0 510.5
2018 Q4 2,138 0 0 0.0
2018 Q3 2,189 0 0 0.0
2018 Q2 1,800 0 0 0.0
2018 Q1 1,613 0 0 0.0
2017 Q4 1,709 2 0 1170.3
2017 Q3 1,483 0 0 0.0
2017 Q2 976 1 0 1024.6
2017 Q1 1,045 0 0 0.0
2016 Q4 1,301 0 0 0.0
2016 Q3 1,322 1 0 756.4
2016 Q2 782 1 1 1278.8
2016 Q1 1,048 0 0 0.0
2015 Q4 1,384 0 0 0.0
2015 Q3 1,198 0 0 0.0
2015 Q2 1,139 1 0 878.0
2015 Q1 1,813 0 0 0.0
2014 Q4 1,187 0 0 0.0
2014 Q3 1,398 1 0 715.3
2014 Q2 648 0 0 0.0
2014 Q1 1,284 0 0 0.0
2013 Q4 1,192 1 0 838.9
2013 Q3 1,086 0 0 0.0
2013 Q2 1,997 0 0 0.0
2013 Q1 2,255 1 0 443.5
2012 Q4 1,879 0 0 0.0
2012 Q3 2,519 0 0 0.0
2012 Q2 2,283 0 0 0.0
2012 Q1 2,131 0 0 0.0
2011 Q4 1,606 0 0 0.0
2011 Q3 1,310 0 0 0.0
2011 Q2 859 2 0 2328.3
2011 Q1 971 0 0 0.0
2010 Q4 1,302 0 0 0.0
2010 Q3 1,289 0 0 0.0
2010 Q2 0 0 0
2010 Q1 0 0 0
2009 Q4 0 0 0
2009 Q3 0 0 0
2009 Q2 672 0 0 0.0
2009 Q1 740 0 0 0.0
2008 Q4 2,761 0 0 0.0
2008 Q3 3,435 3 0 873.4
2008 Q2 5,093 0 0 0.0
2008 Q1 4,191 1 0 238.6
2007 Q4 4,162 0 0 0.0
2007 Q3 4,424 2 0 452.1
2007 Q2 4,451 7 2 1572.7
2007 Q1 4,223 0 0 0.0
2006 Q4 3,992 0 0 0.0
2006 Q3 2,232 15 11 6720.4
No fatalities recorded at this mine.

Reportable incidents

1 on file

2008 · 1 incident

June 21, 2008 AL · Metal/Non-Metal ledgeman/hand, quarry man HANDLING OF MATERIALS
Jenkins Brick Company · Over-exertion in wielding or throwing objects

While assoc. was cleaning up under a conveyor he pick up a rock to throw over the belt, he threw it like a hook shot playing around and said that hurt his back. Rock was approx. 6" ground.