Scoop operator was scooping rock and know out a stopping and a piece of rock and a block hit right hand of operator.
No 7-D: 170 MSHA citations Coal
No 7-D has $34K in proposed MSHA penalties and $0 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at No 7-D.
- Fatalities
- 0
- Total incidents
- 8
- Years on record
- 2009–2011
- Latest incident
- Sep 2011
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.No 7-D has $34K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 3 · 100%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| KENT 2011-903 | Settlement | Paez | 2011 | $4K → $3K |
MSHA sampling at No 7-D shows 90% of 239 respirable coal dust samples met the 1.5 mg/m3 standard.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Respirable coal dust
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2011-09-15, 14 years ago
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.- CONTINUOUS MINER OPERATOR107
- SHUTTLE CAR OPERATOR (STANDARD SIDE)37
- SCOOP CAR OPERATOR19
Silica (quartz)
Last sampled: 2011-08-05, 15 years ago- CONTINUOUS MINER OPERATOR12
Noise
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Last sampled: 2011-08-02, 15 years ago
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.- SHUTTLE CAR OPERATOR (STANDARD SIDE)7
- CONTINUOUS MINER OPERATOR3
- ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)3
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.| Year | within 1.5 mg/m3 | samples |
|---|---|---|
| 2011 | 82% | 76 |
| 2010 | 94% | 78 |
| 2009 | 94% | 78 |
| 2008 | 100% | 7 |
| Year | silica avg (%) | samples |
|---|---|---|
| 2011 | 5.9 | 7 |
| 2010 | 4.3 | 5 |
| 2009 | 5.6 | 5 |
| 2008 | 4.3 | 1 |
| Year | over PEL | samples |
|---|---|---|
| 2011 | 0% | 1 |
| 2010 | 0% | 7 |
| 2009 | 0% | 12 |
No 7-D recorded 13.17 reportable injury cases per 100 full-time workers in 2010.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2010 * | 13.17 | 13.17 | 0.000 |
| 2009 * | 13.00 | 13.00 | 0.000 |
- Dags Branch Coal Co Inc 2008 to present
ⓘ
Coal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.| Year | Employees | Coal produced (tons) |
|---|---|---|
| 2012 | 0 | |
| 2011 | 14 | 47,788 |
| 2010 | 13 | 88,757 |
| 2009 | 14 | 83,083 |
| 2008 | 10 | 6,128 |
No 7-D sits in Pike County, Kentucky, where the Census mining category is 5.1% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2012 Q1 | 0 | 0 | 0 | |
| 2011 Q3 | 6,136 | 14 | 7 | 2281.6 |
| 2011 Q2 | 8,233 | 6 | 3 | 728.8 |
| 2011 Q1 | 8,380 | 24 | 10 | 2864.0 |
| 2010 Q4 | 8,963 | 19 | 8 | 2119.8 |
| 2010 Q3 | 6,905 | 20 | 7 | 2896.5 |
| 2010 Q2 | 7,663 | 16 | 5 | 2088.0 |
| 2010 Q1 | 6,844 | 4 | 2 | 584.5 |
Show 5 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2009 Q4 | 7,875 | 10 | 4 | 1269.8 |
| 2009 Q3 | 8,153 | 3 | 0 | 368.0 |
| 2009 Q2 | 7,481 | 13 | 4 | 1737.7 |
| 2009 Q1 | 7,259 | 19 | 4 | 2617.4 |
| 2008 Q4 | 3,233 | 17 | 6 | 5258.3 |
Reportable incidents
8 on file2011 · 3 incidents
Bolting top rock fell striking him on Rt. Forearm, as he was drilling.
Bolting top got finger caught between drillpot and drill steel, mashed little finger and cut it.
2010 · 3 incidents
EE was taking drill steel apart when his right ring finger was mashed between 2 pieces of drill steel.
A roof fall occurred in the #4 right crosscut into the #5 heading. The fall was approximately 25'long x 18'wide x 8' high. The roof fall did not affect workers,ventilation nor equipment. The fall also continued in the #5 heading on 4-22-10 appx. 10' in length x 18, wide x 8' high.
Bending a roof bolt.
2009 · 2 incidents
EE was crawling to get back on his scoop when a piece of draw rock fell & hit him on the neck & back.
EE was operating a shuttle car, when he hit a small hole and it bounced him into the top of the canopy.