struck left thumb with hammer - contusion and Fx
Wisconsin Rose Red Metal/Non-Metal
Wisconsin Rose Red has $5K in proposed MSHA penalties and $124 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Wisconsin Rose Red.
- Fatalities
- 0
- Total incidents
- 18
- Years on record
- 1983–2021
- Latest incident
- Mar 2021
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Wisconsin Rose Red has $5K in proposed MSHA penalties and $124 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q1 | 0 | 0 | 0 | |
| 2024 Q4 | 0 | 0 | 0 | |
| 2024 Q3 | 0 | 0 | 0 | |
| 2024 Q2 | 0 | 0 | 0 | |
| 2024 Q1 | 0 | 0 | 0 | |
| 2023 Q4 | 0 | 0 | 0 | |
| 2023 Q3 | 0 | 0 | 0 | |
| 2023 Q2 | 1,178 | 0 | 0 | 0.0 |
Show 92 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q1 | 0 | 0 | 0 | |
| 2022 Q4 | 907 | 0 | 0 | 0.0 |
| 2022 Q3 | 2,729 | 1 | 0 | 366.4 |
| 2022 Q2 | 2,173 | 0 | 0 | 0.0 |
| 2022 Q1 | 0 | 0 | 0 | |
| 2021 Q4 | 2,448 | 0 | 0 | 0.0 |
| 2021 Q3 | 2,050 | 1 | 0 | 487.8 |
| 2021 Q2 | 1,840 | 0 | 0 | 0.0 |
| 2021 Q1 | 1,843 | 0 | 0 | 0.0 |
| 2020 Q4 | 2,562 | 3 | 1 | 1171.0 |
| 2020 Q3 | 3,279 | 0 | 0 | 0.0 |
| 2020 Q2 | 3,673 | 1 | 0 | 272.3 |
| 2020 Q1 | 1,830 | 0 | 0 | 0.0 |
| 2019 Q4 | 3,091 | 0 | 0 | 0.0 |
| 2019 Q3 | 3,519 | 1 | 0 | 284.2 |
| 2019 Q2 | 2,410 | 0 | 0 | 0.0 |
| 2019 Q1 | 2,025 | 0 | 0 | 0.0 |
| 2018 Q4 | 2,209 | 0 | 0 | 0.0 |
| 2018 Q3 | 3,802 | 0 | 0 | 0.0 |
| 2018 Q2 | 3,645 | 0 | 0 | 0.0 |
| 2018 Q1 | 1,652 | 0 | 0 | 0.0 |
| 2017 Q4 | 2,324 | 0 | 0 | 0.0 |
| 2017 Q3 | 3,593 | 0 | 0 | 0.0 |
| 2017 Q2 | 4,307 | 1 | 0 | 232.2 |
| 2017 Q1 | 2,043 | 0 | 0 | 0.0 |
| 2016 Q4 | 2,894 | 1 | 0 | 345.5 |
| 2016 Q3 | 3,547 | 0 | 0 | 0.0 |
| 2016 Q2 | 4,910 | 3 | 0 | 611.0 |
| 2016 Q1 | 2,040 | 0 | 0 | 0.0 |
| 2015 Q4 | 2,268 | 0 | 0 | 0.0 |
| 2015 Q3 | 3,846 | 0 | 0 | 0.0 |
| 2015 Q2 | 4,146 | 2 | 1 | 482.4 |
| 2015 Q1 | 2,272 | 0 | 0 | 0.0 |
| 2014 Q4 | 2,557 | 0 | 0 | 0.0 |
| 2014 Q3 | 3,983 | 1 | 0 | 251.1 |
| 2014 Q2 | 3,360 | 1 | 0 | 297.6 |
| 2014 Q1 | 1,924 | 0 | 0 | 0.0 |
| 2013 Q4 | 3,202 | 0 | 0 | 0.0 |
| 2013 Q3 | 4,518 | 0 | 0 | 0.0 |
| 2013 Q2 | 3,485 | 0 | 0 | 0.0 |
| 2013 Q1 | 2,562 | 1 | 0 | 390.3 |
| 2012 Q4 | 2,498 | 0 | 0 | 0.0 |
| 2012 Q3 | 3,240 | 1 | 0 | 308.6 |
| 2012 Q2 | 3,954 | 0 | 0 | 0.0 |
| 2012 Q1 | 2,129 | 0 | 0 | 0.0 |
| 2011 Q4 | 2,187 | 0 | 0 | 0.0 |
| 2011 Q3 | 4,081 | 0 | 0 | 0.0 |
| 2011 Q2 | 3,836 | 1 | 1 | 260.7 |
| 2011 Q1 | 1,471 | 0 | 0 | 0.0 |
| 2010 Q4 | 2,311 | 0 | 0 | 0.0 |
| 2010 Q3 | 2,770 | 0 | 0 | 0.0 |
| 2010 Q2 | 4,063 | 0 | 0 | 0.0 |
| 2010 Q1 | 2,766 | 0 | 0 | 0.0 |
| 2009 Q4 | 2,188 | 0 | 0 | 0.0 |
| 2009 Q3 | 3,421 | 0 | 0 | 0.0 |
| 2009 Q2 | 3,523 | 0 | 0 | 0.0 |
| 2009 Q1 | 2,192 | 0 | 0 | 0.0 |
| 2008 Q4 | 3,899 | 2 | 0 | 513.0 |
| 2008 Q3 | 5,346 | 0 | 0 | 0.0 |
| 2008 Q2 | 5,217 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,404 | 0 | 0 | 0.0 |
| 2007 Q4 | 4,586 | 0 | 0 | 0.0 |
| 2007 Q3 | 6,236 | 2 | 2 | 320.7 |
| 2007 Q2 | 4,941 | 0 | 0 | 0.0 |
| 2007 Q1 | 1,740 | 0 | 0 | 0.0 |
| 2006 Q4 | 4,168 | 7 | 2 | 1679.5 |
| 2006 Q3 | 5,361 | 0 | 0 | 0.0 |
| 2006 Q2 | 3,444 | 0 | 0 | 0.0 |
| 2006 Q1 | 1,562 | 0 | 0 | 0.0 |
| 2005 Q4 | 3,492 | 0 | 0 | 0.0 |
| 2005 Q3 | 4,394 | 0 | 0 | 0.0 |
| 2005 Q2 | 5,037 | 0 | 0 | 0.0 |
| 2005 Q1 | 180 | 0 | 0 | 0.0 |
| 2004 Q4 | 3,400 | 1 | 0 | 294.1 |
| 2004 Q3 | 3,954 | 0 | 0 | 0.0 |
| 2004 Q2 | 4,467 | 0 | 0 | 0.0 |
| 2004 Q1 | 441 | 0 | 0 | 0.0 |
| 2003 Q4 | 3,807 | 9 | 2 | 2364.1 |
| 2003 Q3 | 4,241 | 0 | 0 | 0.0 |
| 2003 Q2 | 3,542 | 0 | 0 | 0.0 |
| 2003 Q1 | 1,087 | 0 | 0 | 0.0 |
| 2002 Q4 | 3,301 | 5 | 2 | 1514.7 |
| 2002 Q3 | 4,258 | 0 | 0 | 0.0 |
| 2002 Q2 | 4,057 | 0 | 0 | 0.0 |
| 2002 Q1 | 3,482 | 1 | 0 | 287.2 |
| 2001 Q3 | 2,990 | 1 | 0 | 334.4 |
| 2001 Q2 | 2,804 | 0 | 0 | 0.0 |
| 2001 Q1 | 2,208 | 1 | 0 | 452.9 |
| 2000 Q4 | 2,300 | 0 | 0 | 0.0 |
| 2000 Q3 | 2,826 | 0 | 0 | 0.0 |
| 2000 Q2 | 2,728 | 2 | 0 | 733.1 |
| 2000 Q1 | 1,527 | 0 | 0 | 0.0 |
Reportable incidents
18 on file2021 · 1 incident
2007 · 2 incidents
fell while walking and bruised tailbone
Twisted right knee, had no lost work days. 0n 4/09/2007 sought treatment and is in need of MCL repair.
2003 · 1 incident
EE BROKE A STONE AND THE STONE FELL APART. EE FELL INTO THE STONE WITH HIS FACE, FRACTURING HIS NOSE.
1998 · 1 incident
HE WAS BULLSETTING HANDLE BROKE HITTING HIM IN THE MOUTH
1996 · 1 incident
WHILE GROUTING USING SNARE CHAIN ON DERRICK--OPERATOR MISSED GROUT BOX WITH WASTE BLOCK--WHEN THE STONE BUMPED THE GROUT BOX IT TURNED, PINCHING HIS LEG AGAINST QUARRY WALL. NATURE AND EXTENT OF INJURY--TORN LIGAMENT.
1995 · 1 incident
GROUTING- USE OF SNARE CHAIN W/DERRICK- TRIED TO SLIDE LOOSE PIECE OF ROCK DOWN PILE TO WRAP CHAIN AROUND IT. IT SLIDE FASTER THAN ANTICIPATED AND LANDED ON FOOT ABOVE RT FIRST TOE. CAUSED CON TUSION AND FRACTURE.
1992 · 2 incidents
68935 LOADING GRANITE SLAB ON TRUCK WITH MOBIL CRANE SLAB BUMPED SIDE RAIL ON TRUCK CAUSING HOOK TO COME OUT OF HOLE AND THE SLAB FELL ON RIGHT FOOT.
WORKERS HAD JUST MADE A LIFT (BLAST). AFTER SANDING WORK AREA, HE WAS DISCUSSING WITH FELLOW WORKERS WHERE TO ATTACH SAFETY HARNESSES AND INSTALL FENCING TO MAKE AREA SAFE. HE VOLUNTEERED TO G ET HARNESSES. AS HE TURNED, HIS FOOT SLIPPED. HIS ATTEMPT TO REGAIN BALANCE TOOK HIM OVER THE EDGEE. HE FELL APPROX. 8' HITTING LEFT FOOT ON SMALL BOULDER DISLOCATING A BONE IN FOOT.
1989 · 3 incidents
EMPLOYEE ALLEGES STONE FELL ON DUMP TRUCK BOX ALLOWING IT TO RISE AND HIT BOTTOM OF LEFT UPPER ARM.
EMPLOYEE WAS DRIVING TO FAST WITH LOADER, HIT A BUMP WHICH CAUSED HIM TO BE THROWN SIDEWAYS TO PREVENT HEAD INJURY HE BRACERD HIMSELF AGAINST WINDOW WITH HIS ARM KNOCKING OUT THE WINDOW AND CA USING INJURY.
EMPLOYEE ALLEGES HE WAS POUNDING BRACE PIN INTO A HOLE HE HAD DRILLED IN BLOCK TO SUPPORT END SLAB WHILE BEING SAWED. HE MISSED THE PIN AND FRACTURED LEFT THUMB.
1988 · 3 incidents
EMPLOYEE ALLEGES HE TRIPPED ON A PIECE OF WOOD, FELL FORWARD AND CAUGHT HIMSELF WITH RIGHT HAND. SORENESS PERSISTED UNTIL PRESENT IN RIGHT WRIST. BEING THIS LONG, THOUGHT IS SHOULD BE CHECKED. 1ST WENT TO DOCTOR ON 3/10/89.
FIRE FROM AN UNKNOWN CAUSED DESTROYED BUILDING AND WIRE SAW.
EMPLOYEE WAS ST5NDING ON A STONE WHICH HE HAD PREVIOUSLY TRIED TO DISLODGE WITH A BAR. STONE SUDDENLY DISLODGED ITSELF AND ROLLED AWAY. EMPLOYEE FELL OFF AND STRUCK STONE NEXTY TO THE ONE HE H AD BEEN STANDIN1 ON, HITTING HIS CHEST AND BREAKING FIVE RIBS ON HIS RIGHT SIDE.
1987 · 1 incident
EMPL LIFTING ST2NE TO PUT INTO GROUT BOX.PIECE OF STONE BROKE AND FELL ON FOOT ABOVE STEEL PORTION OF SHOE.X-RAYS REVEALED NO FX BUT DID HAVE BAD BRUISE REQ HIM TO MISS 3 WORK DAYS.
1986 · 1 incident
HE WAS BARRING 5 STONE WITH ANOTHER ON TOP IN ORDER TO TIP BOTH STONES. WHEN THE STONES TOPPLED THE TOP STONE SPUN OFF AND STRUCK HIM IN THE LEFT LEG, CAUSING A LACERATION APPROX, 6 INCHES AB OVE THE ANKEL. 3
1983 · 1 incident
WHILE TRYING TO DISLODGE A LARGE PIECE OF GRANITE FROM LOOSE QUARRY WALL, EE STEPPED ON THE LOOSE EDGE WHILE PRYING THE LARGE BLOCK. WHEN USING A CROW BAR TO PRY WITH THE PIECE HE WAS STANDI NG ON FELL WITH HIM ON IT, SUBSEQUENTLY PINNING HIM BETWEEN 2 LARGE STONE & THE QUARRY WALL. PHYSICAL DAMAGE IS NOT COMPLETELY KNOWN. INJURY INCLUDED ARM SHOULDER PELVIS BROKEN THUMB LACERATI
The full compliance file on Wisconsin Rose Red
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.