Mining Incidents

Airport Pit: 89 MSHA citations Metal/Non-Metal

Hurricane Ready Mix · Surface
Controlled by Cason Todd Stratton
Hurricane, Washington County, UT  ·  Intermittent
MSHA Mine ID: 4201912

Airport Pit has $35K in proposed MSHA penalties and $6K outstanding across 4 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Airport Pit.

Fatalities
0
Total incidents
0
Years on record
Latest incident
Compliance record
MSHA citations since 2000
89
citations
24
significant & substantial
$34,615
proposed penalties
$27,008
paid to date
78% of proposed penalties paid to date, a $7,607 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
48
inspections on record
689
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 689 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Imminent-danger orders
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.
1
Section 107(a) orders
Most recent order: 2020-04-29.
On record since 2020.
Source: MSHA imminent-danger order records, updated weekly.

Airport Pit has $35K in proposed MSHA penalties and $6K outstanding across 4 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$35K
proposed penalties
$33K
current assessed
$27K
paid to date
$6K
outstanding
81 assessments are final orders; 4 contested dockets.
Of $3K in penalties contested before the Commission, $1K was upheld in final decisions.
As of the most recent assessment on 2026-04-08.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
27.9%
significant & substantial
22.1%
high negligence or reckless
27.9%
reasonably likely or greater
62.8%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 8.1% low, 69.8% moderate, 22.1% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
1 citations taken to the federal commission · 1% of citations on record
  • Stood as issued 1 · 100%
0%
Penalty reduction in decided contests
$60 proposed, $60 after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2005-09-30.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
WEST20010557M Settlement Manning 2002 $2K → $1K
WEST20010538M Settlement Manning 2002 $500 → $200
WEST20010528M Settlement Manning 2002 $140 → $75
WEST 2006-1M Default Lesnick 2006 $60 → $60
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2026-04-08
20%
of limit-tested samples over the exposure limit
9
samples
5
limit-tested
Most sampled contaminants
  • Quartz, respirable, >1% Qtz61 over
  • Respirable dust, <.1mg3
Show the individual readings (9)
Date Contaminant Concentration Limit Conc / limit Occupation
2005-07-12 Quartz, respirable, >1% Qtz 1.09 0.77 1.42 Crusher Oper/Worker
2026-04-08 Respirable dust, <.1mg 0 Utility Man
2023-05-10 Quartz, respirable, >1% Qtz 0.2 0.89 0.22 Front-end Loader Operator
2023-05-10 Quartz, respirable, >1% Qtz 0.12 Front-end Loader Operator
2020-11-03 Respirable dust, <.1mg 0 Front-end Loader Operator
2017-01-18 Respirable dust, <.1mg 0 Front-end Loader Operator
2017-01-18 Quartz, respirable, >1% Qtz 0.14 1.11 0.13 Front-end Loader Operator
2005-11-29 Quartz, respirable, >1% Qtz 0.48 1.58 0.30 Crusher Oper/Worker
2005-07-12 Quartz, respirable, >1% Qtz 0.77 1.29 0.60 Front-end Loader Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Stratton & Son 1985 to 1989
  2. Darwin Stratton & Son Inc 1989 to 2007
  3. Hurricane Ready Mix 2007 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2026 2
2025 2
2024 2
2023 2
2022 2
2021 2
2020 2
2019 2
2018 2
2017 2
2016 2
2015 2
2014 2
2013 2
2012 2
2011 2
2010 2
2009 0
2008 3
2007 3
2006 2
2005 2
2004 2
2003 2
2002 2
2001 2
2000 2
Source: MSHA quarterly employment and production, updated weekly.

Airport Pit sits in Washington County, Utah, where the Census mining category is 0.2% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Washington County, Utah · Population 189,827
0.2%
Mining share of county employment
$76,411
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2026 Q2 286 10 3 34965.0
2026 Q1 294 0 0 0.0
2025 Q4 273 0 0 0.0
2025 Q3 284 0 0 0.0
2025 Q2 264 0 0 0.0
2025 Q1 278 3 0 10791.4
2024 Q4 265 0 0 0.0
2024 Q3 326 0 0 0.0
Show 98 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2024 Q2 305 0 0 0.0
2024 Q1 307 0 0 0.0
2023 Q4 206 0 0 0.0
2023 Q3 278 0 0 0.0
2023 Q2 259 4 1 15444.0
2023 Q1 236 0 0 0.0
2022 Q4 210 0 0 0.0
2022 Q3 292 0 0 0.0
2022 Q2 293 0 0 0.0
2022 Q1 277 0 0 0.0
2021 Q4 197 2 0 10152.3
2021 Q3 289 0 0 0.0
2021 Q2 277 0 0 0.0
2021 Q1 264 0 0 0.0
2020 Q4 216 4 1 18518.5
2020 Q3 226 0 0 0.0
2020 Q2 235 2 2 8510.6
2020 Q1 221 0 0 0.0
2019 Q4 205 0 0 0.0
2019 Q3 210 0 0 0.0
2019 Q2 177 3 0 16949.2
2019 Q1 217 0 0 0.0
2018 Q4 205 0 0 0.0
2018 Q3 216 0 0 0.0
2018 Q2 211 0 0 0.0
2018 Q1 205 0 0 0.0
2017 Q4 140 5 2 35714.3
2017 Q3 137 0 0 0.0
2017 Q2 131 0 0 0.0
2017 Q1 127 4 0 31496.1
2016 Q4 121 0 0 0.0
2016 Q3 94 0 0 0.0
2016 Q2 91 0 0 0.0
2016 Q1 72 0 0 0.0
2015 Q4 72 0 0 0.0
2015 Q3 90 0 0 0.0
2015 Q2 85 0 0 0.0
2015 Q1 79 0 0 0.0
2014 Q4 90 0 0 0.0
2014 Q3 142 0 0 0.0
2014 Q2 146 0 0 0.0
2014 Q1 151 0 0 0.0
2013 Q4 127 0 0 0.0
2013 Q3 125 0 0 0.0
2013 Q2 72 0 0 0.0
2013 Q1 36 0 0 0.0
2012 Q4 46 0 0 0.0
2012 Q3 130 0 0 0.0
2012 Q2 162 0 0 0.0
2012 Q1 26 0 0 0.0
2011 Q4 46 0 0 0.0
2011 Q3 30 0 0 0.0
2011 Q2 50 0 0 0.0
2011 Q1 28 0 0 0.0
2010 Q4 22 2 0 90909.1
2010 Q3 54 3 1 55555.6
2010 Q2 111 0 0 0.0
2010 Q1 0 0 0
2009 Q4 0 0 0
2009 Q3 0 0 0
2009 Q2 0 0 0
2009 Q1 0 0 0
2008 Q4 495 0 0 0.0
2008 Q3 763 0 0 0.0
2008 Q2 1,540 9 1 5844.2
2008 Q1 1,594 0 0 0.0
2007 Q4 1,506 1 1 664.0
2007 Q3 1,964 0 0 0.0
2007 Q2 1,254 0 0 0.0
2007 Q1 1,210 0 0 0.0
2006 Q4 1,307 0 0 0.0
2006 Q3 1,382 0 0 0.0
2006 Q2 1,431 2 1 1397.6
2006 Q1 1,475 0 0 0.0
2005 Q4 1,272 0 0 0.0
2005 Q3 1,679 2 1 1191.2
2005 Q2 1,226 0 0 0.0
2005 Q1 468 0 0 0.0
2004 Q4 240 0 0 0.0
2004 Q3 154 5 3 32467.5
2004 Q2 45 0 0 0.0
2004 Q1 47 0 0 0.0
2003 Q4 45 0 0 0.0
2003 Q3 50 0 0 0.0
2003 Q2 45 0 0 0.0
2003 Q1 50 4 0 80000.0
2002 Q4 55 0 0 0.0
2002 Q3 55 0 0 0.0
2002 Q2 55 0 0 0.0
2002 Q1 45 0 0 0.0
2001 Q4 40 0 0 0.0
2001 Q3 40 0 0 0.0
2001 Q2 40 7 3 175000.0
2001 Q1 35 0 0 0.0
2000 Q4 38 11 2 289473.7
2000 Q3 38 3 0 78947.4
2000 Q2 38 0 0 0.0
2000 Q1 38 0 0 0.0

No reportable incidents on file.

MSHA has no recorded reportable accidents for this mine in the current dataset. New reports appear here within a week of being filed.