While climbing down equipment ladder,L hand missed rung while moving feet to the next rung. Fell backwards approx 6 feet, landing on catwalk.
Amrize Sand Crusher #2 Metal/Non-Metal
Amrize Sand Crusher #2 has $37K in proposed MSHA penalties and $0 outstanding across 3 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Amrize Sand Crusher #2.
- Fatalities
- 0
- Total incidents
- 6
- Years on record
- 2013–2016
- Latest incident
- Sep 2016
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Amrize Sand Crusher #2 has $37K in proposed MSHA penalties and $0 outstanding across 3 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 2,491 | 0 | 0 | 0.0 |
| 2025 Q2 | 1,434 | 0 | 0 | 0.0 |
| 2025 Q1 | 1,319 | 4 | 2 | 3032.6 |
| 2024 Q4 | 1,163 | 0 | 0 | 0.0 |
| 2024 Q3 | 701 | 0 | 0 | 0.0 |
| 2024 Q2 | 1,696 | 0 | 0 | 0.0 |
| 2024 Q1 | 5,461 | 0 | 0 | 0.0 |
| 2023 Q4 | 5,078 | 3 | 0 | 590.8 |
Show 70 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q3 | 5,270 | 4 | 0 | 759.0 |
| 2023 Q2 | 3,305 | 0 | 0 | 0.0 |
| 2023 Q1 | 4,660 | 0 | 0 | 0.0 |
| 2022 Q4 | 4,394 | 0 | 0 | 0.0 |
| 2022 Q3 | 3,056 | 0 | 0 | 0.0 |
| 2022 Q2 | 2,976 | 0 | 0 | 0.0 |
| 2022 Q1 | 2,794 | 1 | 0 | 357.9 |
| 2021 Q4 | 2,383 | 0 | 0 | 0.0 |
| 2021 Q3 | 2,191 | 0 | 0 | 0.0 |
| 2021 Q2 | 1,999 | 0 | 0 | 0.0 |
| 2021 Q1 | 1,958 | 12 | 4 | 6128.7 |
| 2020 Q4 | 3,107 | 0 | 0 | 0.0 |
| 2020 Q3 | 3,246 | 0 | 0 | 0.0 |
| 2020 Q2 | 4,890 | 0 | 0 | 0.0 |
| 2020 Q1 | 3,352 | 1 | 0 | 298.3 |
| 2019 Q4 | 3,945 | 0 | 0 | 0.0 |
| 2019 Q3 | 4,367 | 1 | 0 | 229.0 |
| 2019 Q2 | 5,340 | 0 | 0 | 0.0 |
| 2019 Q1 | 4,106 | 6 | 1 | 1461.3 |
| 2018 Q4 | 3,259 | 0 | 0 | 0.0 |
| 2018 Q3 | 4,059 | 4 | 1 | 985.5 |
| 2018 Q2 | 2,967 | 0 | 0 | 0.0 |
| 2018 Q1 | 2,750 | 6 | 1 | 2181.8 |
| 2017 Q4 | 3,753 | 0 | 0 | 0.0 |
| 2017 Q3 | 5,524 | 0 | 0 | 0.0 |
| 2017 Q2 | 6,628 | 0 | 0 | 0.0 |
| 2017 Q1 | 5,977 | 6 | 4 | 1003.8 |
| 2016 Q4 | 5,630 | 0 | 0 | 0.0 |
| 2016 Q3 | 6,045 | 6 | 1 | 992.6 |
| 2016 Q2 | 5,603 | 0 | 0 | 0.0 |
| 2016 Q1 | 3,600 | 0 | 0 | 0.0 |
| 2015 Q4 | 5,814 | 3 | 2 | 516.0 |
| 2015 Q3 | 5,731 | 0 | 0 | 0.0 |
| 2015 Q2 | 3,161 | 5 | 2 | 1581.8 |
| 2015 Q1 | 5,004 | 0 | 0 | 0.0 |
| 2014 Q4 | 5,249 | 1 | 0 | 190.5 |
| 2014 Q3 | 5,947 | 3 | 1 | 504.5 |
| 2014 Q2 | 5,572 | 0 | 0 | 0.0 |
| 2014 Q1 | 4,429 | 0 | 0 | 0.0 |
| 2013 Q4 | 5,062 | 13 | 5 | 2568.2 |
| 2013 Q3 | 5,313 | 13 | 0 | 2446.8 |
| 2013 Q2 | 3,449 | 0 | 0 | 0.0 |
| 2013 Q1 | 3,926 | 7 | 2 | 1783.0 |
| 2012 Q4 | 3,903 | 0 | 0 | 0.0 |
| 2012 Q3 | 3,276 | 0 | 0 | 0.0 |
| 2012 Q2 | 3,752 | 1 | 0 | 266.5 |
| 2012 Q1 | 3,173 | 0 | 0 | 0.0 |
| 2011 Q4 | 3,932 | 1 | 0 | 254.3 |
| 2011 Q3 | 2,649 | 0 | 0 | 0.0 |
| 2011 Q2 | 3,580 | 3 | 0 | 838.0 |
| 2011 Q1 | 2,596 | 5 | 2 | 1926.0 |
| 2010 Q4 | 2,094 | 0 | 0 | 0.0 |
| 2010 Q3 | 3,484 | 0 | 0 | 0.0 |
| 2010 Q2 | 3,649 | 5 | 2 | 1370.2 |
| 2010 Q1 | 3,600 | 0 | 0 | 0.0 |
| 2009 Q4 | 3,735 | 0 | 0 | 0.0 |
| 2009 Q3 | 3,059 | 0 | 0 | 0.0 |
| 2009 Q2 | 3,977 | 0 | 0 | 0.0 |
| 2009 Q1 | 3,463 | 0 | 0 | 0.0 |
| 2008 Q4 | 3,526 | 1 | 0 | 283.6 |
| 2008 Q3 | 3,614 | 0 | 0 | 0.0 |
| 2008 Q2 | 4,234 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,458 | 1 | 0 | 289.2 |
| 2007 Q4 | 5,545 | 0 | 0 | 0.0 |
| 2007 Q3 | 4,823 | 0 | 0 | 0.0 |
| 2007 Q2 | 5,832 | 0 | 0 | 0.0 |
| 2007 Q1 | 3,661 | 14 | 3 | 3824.1 |
| 2006 Q4 | 4,351 | 0 | 0 | 0.0 |
| 2006 Q3 | 4,082 | 4 | 3 | 979.9 |
| 2006 Q2 | 1,200 | 0 | 0 | 0.0 |
Reportable incidents
6 on file2016 · 1 incident
2015 · 1 incident
Stepping off of dozer, twisted ankle. First aid only; then sought medical care on 09/29/2015 and was prescribed ankle brace and crutches.
2014 · 2 incidents
2 employees in 2006 Cat 735 seat belts fastened. Trainer was training employee on driving haul truck. The trainer w trainee driving 3rd load. Going down a steep road in 4th gear, truck jumped to 7th gear & speed increased w brakes on. Going too fast on curve, flipped onto its side. Both Employees have minor injuries. Investigating root cause of jumping gear.
2 employees in 2006 Cat 735 seat belts fastened. Trainer was training employee on driving haul truck. The trainer w trainee driving 3rd load. Going down a steep road in 4th gear, truck jumped to 7th gear & speed increased w brakes on. Going too fast on curve, flipped onto its side. Both Employees have minor injuries. Investigating root cause of jumping gear.
2013 · 2 incidents
While getting into cab of semi truck, driver "smacked" top of head on door frame. diagnosis - laceration and concussion without loss of consciousness.
He was in the pit, climbing off his bulldozer. There was a trench that he stepped on and he twisted his L ankle on the uneven surface. Ankle is swollen and doesn't move normally.
The full compliance file on Amrize Sand Crusher #2
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.