Mining Incidents

Bauer Pit: 49 MSHA citations Metal/Non-Metal

Controlled by Summit Materials LLC
Tooele, Tooele County, UT  ·  Abandoned
MSHA Mine ID: 4202465

Bauer Pit has $24K in proposed MSHA penalties and $0 outstanding across 1 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Bauer Pit.

Fatalities
0
Total incidents
1
Years on record
2018
Latest incident
Feb 2018
Compliance record
MSHA citations since 2007
49
citations
13
significant & substantial
$23,571
proposed penalties
$23,571
paid to date
100% of proposed penalties paid to date, a $0 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2007
18
inspections on record
321
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 321 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

Bauer Pit has $24K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$24K
proposed penalties
$24K
current assessed
$24K
paid to date
$0
outstanding
46 assessments are final orders; 1 contested dockets.
Of $12K in penalties contested before the Commission, $12K was upheld in final decisions.
As of the most recent assessment on 2019-01-16.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
28.3%
significant & substantial
10.9%
high negligence or reckless
28.3%
reasonably likely or greater
76.1%
permanently disabling or fatal if injury occurs
Negligence coding: 2.2% none, 6.5% low, 80.4% moderate, 10.9% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
4 citations taken to the federal commission · 8% of citations on record
  • Stood as issued 3 · 75%
  • Vacated or withdrawn 1 · 25%
100%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 3 decided S&S contests · industry: 79%
7%
Penalty reduction in decided contests
$12K proposed, $12K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2010-03-23.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
WEST 2010-884M Dismissal Lesnick 2011 $12K → $12K
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2018-11-08, 7 years ago
64%
of limit-tested samples over the exposure limit
19
samples
11
limit-tested
Most sampled contaminants
  • Quartz, respirable, >1% Qtz117 over
  • Respirable dust, <.1mg7
  • Unlisted Particulate, respirable, <1% Qtz1
Show the individual readings (19)
Date Contaminant Concentration Limit Conc / limit Occupation
2018-09-19 Quartz, respirable, >1% Qtz 0.29 0.21 1.38 Crusher Oper/Worker
2009-11-24 Quartz, respirable, >1% Qtz 0.3 0.21 1.43 Crusher Oper/Worker
2007-11-06 Quartz, respirable, >1% Qtz 1.71 0.59 2.90 Crusher Oper/Worker
2007-11-06 Quartz, respirable, >1% Qtz 0.72 0.21 3.43 Laborer, Bullgang
2007-07-26 Quartz, respirable, >1% Qtz 0.82 0.32 2.56 Laborer, Bullgang
2007-07-26 Quartz, respirable, >1% Qtz 0.45 0.3 1.50 Crusher Oper/Worker
2007-07-26 Quartz, respirable, >1% Qtz 0.45 0.33 1.36 Laborer, Bullgang
2018-11-08 Respirable dust, <.1mg 0 Crusher Oper/Worker
2018-09-19 Unlisted Particulate, respirable, <1% Qtz 0.17 Front-end Loader Operator
2018-09-19 Quartz, respirable, >1% Qtz 0.26 0.46 0.57 Front-end Loader Operator
2010-02-02 Quartz, respirable, >1% Qtz 0.14 0.26 0.54 Crusher Oper/Worker
2009-11-24 Respirable dust, <.1mg 0 Front-end Loader Operator
2009-11-24 Respirable dust, <.1mg 0 Truck Driver
2009-11-24 Respirable dust, <.1mg 0 Front-end Loader Operator
2008-03-26 Quartz, respirable, >1% Qtz 0.17 0.45 0.38 Laborer, Bullgang
2008-03-26 Respirable dust, <.1mg 0 Crusher Oper/Worker
2008-03-26 Respirable dust, <.1mg 0 Laborer, Bullgang
2007-11-06 Quartz, respirable, >1% Qtz 0.19 0.27 0.70 Laborer, Bullgang
2007-07-26 Respirable dust, <.1mg 0 Front-end Loader Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.

Bauer Pit recorded 0.00 reportable injury cases per 100 full-time workers in 2010.

Injury rate, 2010
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.
0.00
total case rate
0.00
days-away rate
0.000
fatality rate
No reportable injury cases in any year shown. Employee-hours were reported in each of those years, so these are true zeros rather than missing data. Citations, listed in the compliance record above, are inspector-found violations and are counted separately from worker injuries.
Below average. The US metal and nonmetal mining average was 2.68 and the all-US-mining average was 3.20 cases per 100 workers.
In Utah, metal and nonmetal mining averaged 1.91 cases per 100 workers that year.
Under 100,000 employee-hours were reported that year, so a single case moves the rate by two or more. Read the figure as approximate.
Year total case rate days-away fatal
2010 * 0.00 0.00 0.000
2009 * 0.00 0.00 0.000
2008 * 0.00 0.00 0.000
2007 * 0.00 0.00 0.000
* Fewer than 100,000 employee-hours that year; the rate is less stable.
Source: injury cases from MSHA accident and injury records; employee-hours from MSHA quarterly employment reports. Rate is cases per 100 full-time-equivalent workers, operator employees only.
Ownership history
  1. Harper Sand & Gravel 2006 to 2010
  2. Kilgore Cos LLC dba Kilgore Contracting 2010 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2023 0
2022 7
2019 4
2018 6
2017 5
2011 2
2010 28
2009 25
2008 22
2007 16
Source: MSHA quarterly employment and production, updated weekly.

Bauer Pit sits in Tooele County, Utah, where the Census mining category is 1.8% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Tooele County, Utah · Population 76,648
1.8%
Mining share of county employment
$101,846
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2023 Q1 0 0 0
2022 Q4 1,394 0 0 0.0
2019 Q3 1,476 0 0 0.0
2019 Q2 1,836 0 0 0.0
2019 Q1 2,644 7 0 2647.5
2018 Q4 4,370 1 1 228.8
2018 Q3 3,952 0 0 0.0
2018 Q2 4,212 0 0 0.0
Show 21 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2018 Q1 4,492 0 0 0.0
2017 Q4 4,394 0 0 0.0
2017 Q3 3,995 0 0 0.0
2017 Q2 565 0 0 0.0
2011 Q1 614 0 0 0.0
2010 Q4 2,450 0 0 0.0
2010 Q3 15,184 0 0 0.0
2010 Q2 18,541 2 1 107.9
2010 Q1 8,587 3 3 349.4
2009 Q4 8,989 4 1 445.0
2009 Q3 10,279 1 0 97.3
2009 Q2 12,198 4 0 327.9
2009 Q1 7,531 0 0 0.0
2008 Q4 9,521 8 2 840.2
2008 Q3 9,957 0 0 0.0
2008 Q2 9,867 0 0 0.0
2008 Q1 8,313 0 0 0.0
2007 Q4 10,392 8 2 769.8
2007 Q3 9,989 11 3 1101.2
2007 Q2 7,736 0 0 0.0
2007 Q1 5,879 0 0 0.0
No fatalities recorded at this mine.

Reportable incidents

1 on file

2018 · 1 incident

February 26, 2018 UT · Metal/Non-Metal bulldozer operator, universal operator, heavy equipment operator, operating engineer SLIP OR FALL OF PERSON
Kilgore Cos LLC dba Kilgore Contracting · Fall to the walkway or working surface

As the miner was stepping off of a 980 CAT Loader,ee stepped onto uneven, Snow covered ground causing ee to fall and break left Ankle.