Employee was operating skid steer to dump trash bucket full of stone, bucket hit hard when coming down, piece of stone fell out and landed in employee's lap across right knee cap. Knee is swollen and has limited mobility due to swelling.
Continental Quarries Inc: 206 MSHA citations Metal/Non-Metal
Continental Quarries Inc has $52K in proposed MSHA penalties and $0 outstanding across 4 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Continental Quarries Inc.
- Fatalities
- 0
- Total incidents
- 8
- Years on record
- 2001–2025
- Latest incident
- Aug 2025
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.Continental Quarries Inc has $52K in proposed MSHA penalties and $0 outstanding across 4 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 6 · 86%
- Vacated or withdrawn 1 · 14%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| CENT 2012-847M | Settlement | Lesnick | 2013 | $2K → $2K |
| CENT 2011-228M | Settlement | Lesnick | 2011 | $2K → $2K |
| CENT 2011-229M | Settlement | Lesnick | 2011 | $2K → $571 |
| CENT 2017-0472 | Settlement | Lesnick | 2017 | $1K → $453 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2020-09-22, 5 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Quartz, respirable, >1% Qtz21
- Nuisance dust, respirable, <1% Qtz6
- Respirable dust, <.1mg6
- Unlisted Particulate, respirable, <1% Qtz1
Show the individual readings (34)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2020-09-22 | Respirable dust, <.1mg | 0 | Stone Polisher/Cutter | ||
| 2020-09-22 | Unlisted Particulate, respirable, <1% Qtz | 0.22 | Stone Polisher/Cutter | ||
| 2017-10-18 | Nuisance dust, respirable, <1% Qtz | 0.25 | 10 | 0.03 | Stone Polisher/Cutter |
| 2017-10-18 | Quartz, respirable, >1% Qtz | 0.48 | 1.72 | 0.28 | Stone Polisher/Cutter |
| 2017-10-18 | Quartz, respirable, >1% Qtz | 1 | 1.97 | 0.51 | Stone Polisher/Cutter |
| 2017-09-19 | Quartz, respirable, >1% Qtz | 0.9 | 1.85 | 0.49 | Stone Polisher/Cutter |
| 2017-09-19 | Quartz, respirable, >1% Qtz | 0.22 | 1.88 | 0.12 | Stone Polisher/Cutter |
| 2017-09-19 | Quartz, respirable, >1% Qtz | 0.85 | 1.55 | 0.55 | Stone Polisher/Cutter |
| 2016-08-24 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2016-08-24 | Nuisance dust, respirable, <1% Qtz | 0.22 | 10 | 0.02 | Stone Polisher/Cutter |
| 2016-08-24 | Nuisance dust, respirable, <1% Qtz | 0.38 | 10 | 0.04 | Stone Polisher/Cutter |
| 2014-12-17 | Respirable dust, <.1mg | 0 | Cutting Mach Operator | ||
| 2014-12-17 | Nuisance dust, respirable, <1% Qtz | 0.38 | 10 | 0.04 | Front-end Loader Operator |
| 2014-12-17 | Quartz, respirable, >1% Qtz | 0.18 | 1.67 | 0.11 | Bobcat Operator |
| 2014-12-17 | Quartz, respirable, >1% Qtz | 0.27 | 1.1 | 0.25 | Forklift Operator |
| 2012-05-16 | Quartz, respirable, >1% Qtz | 0.45 | 1.04 | 0.43 | Forklift Operator |
| 2012-05-16 | Quartz, respirable, >1% Qtz | 0.72 | 1.92 | 0.38 | Stone Polisher/Cutter |
| 2012-05-16 | Nuisance dust, respirable, <1% Qtz | 0.5 | 10 | 0.05 | Stone Polisher/Cutter |
| 2010-10-13 | Quartz, respirable, >1% Qtz | 0.18 | 1.53 | 0.12 | Stone Polisher/Cutter |
| 2010-10-13 | Quartz, respirable, >1% Qtz | 0.73 | 1.21 | 0.60 | Bobcat Operator |
| 2010-10-13 | Quartz, respirable, >1% Qtz | 0.19 | 1.97 | 0.10 | Stone Polisher/Cutter |
| 2010-04-14 | Quartz, respirable, >1% Qtz | 0.23 | 1.63 | 0.14 | Stone Polisher/Cutter |
| 2010-04-14 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2010-04-14 | Quartz, respirable, >1% Qtz | 0.34 | 1.49 | 0.23 | Stone Polisher/Cutter |
| 2009-07-14 | Quartz, respirable, >1% Qtz | 0.51 | 2.56 | 0.20 | Stone Polisher/Cutter |
| 2009-07-14 | Nuisance dust, respirable, <1% Qtz | 0.21 | 10 | 0.02 | Stone Polisher/Cutter |
| 2009-07-14 | Quartz, respirable, >1% Qtz | 0.59 | 2.9 | 0.20 | Front-end Loader Operator |
| 2007-07-25 | Respirable dust, <.1mg | 0 | Mechanic | ||
| 2007-07-25 | Quartz, respirable, >1% Qtz | 0.22 | 1.56 | 0.14 | Stone Polisher/Cutter |
| 2007-07-25 | Respirable dust, <.1mg | 0 | Stone Polisher/Cutter | ||
| 2003-10-15 | Quartz, respirable, >1% Qtz | 0.3 | 1.23 | 0.24 | Cutting Mach Operator |
| 2003-10-15 | Quartz, respirable, >1% Qtz | 0.18 | 0.88 | 0.20 | Front-end Loader Operator |
| 2003-10-15 | Quartz, respirable, >1% Qtz | 0.32 | 1.05 | 0.30 | Cutting Mach Helper |
| 2003-10-15 | Quartz, respirable, >1% Qtz | 0.9 | 1.35 | 0.67 | Cutting Mach Helper |
Continental Quarries Inc recorded 7.19 reportable injury cases per 100 full-time workers in 2025.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2025 * | 7.19 | 7.19 | 0.000 |
| 2024 * | 0.00 | 0.00 | 0.000 |
| 2023 * | 0.00 | 0.00 | 0.000 |
| 2022 * | 0.00 | 0.00 | 0.000 |
| 2021 * | 6.13 | 6.13 | 0.000 |
| 2020 * | 0.00 | 0.00 | 0.000 |
| 2019 * | 0.00 | 0.00 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
- Continental Quarries Inc 1999 to present
| Year | Employees |
|---|---|
| 2026 | 14 |
| 2025 | 16 |
| 2024 | 17 |
| 2023 | 21 |
| 2022 | 21 |
| 2021 | 20 |
| 2020 | 17 |
| 2019 | 16 |
| 2018 | 17 |
| 2017 | 20 |
| 2016 | 21 |
| 2015 | 23 |
| 2014 | 22 |
| 2013 | 22 |
| 2012 | 21 |
| 2011 | 18 |
| 2010 | 16 |
| 2009 | 9 |
| 2008 | 28 |
| 2007 | 35 |
| 2006 | 26 |
| 2005 | 15 |
| 2004 | 12 |
| 2003 | 9 |
| 2002 | 9 |
| 2001 | 3 |
| 2000 | 3 |
Continental Quarries Inc sits in Shackelford County, Texas, where the Census mining category is 11.5% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 6,296 | 0 | 0 | 0.0 |
| 2026 Q1 | 6,576 | 4 | 1 | 608.3 |
| 2025 Q4 | 6,522 | 0 | 0 | 0.0 |
| 2025 Q3 | 7,528 | 0 | 0 | 0.0 |
| 2025 Q2 | 8,015 | 4 | 1 | 499.1 |
| 2025 Q1 | 5,769 | 0 | 0 | 0.0 |
| 2024 Q4 | 7,755 | 2 | 0 | 257.9 |
| 2024 Q3 | 6,624 | 0 | 0 | 0.0 |
Show 98 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 8,137 | 1 | 0 | 122.9 |
| 2024 Q1 | 7,283 | 0 | 0 | 0.0 |
| 2023 Q4 | 9,471 | 3 | 1 | 316.8 |
| 2023 Q3 | 9,589 | 2 | 1 | 208.6 |
| 2023 Q2 | 11,469 | 0 | 0 | 0.0 |
| 2023 Q1 | 6,810 | 3 | 3 | 440.5 |
| 2022 Q4 | 7,981 | 0 | 0 | 0.0 |
| 2022 Q3 | 7,432 | 1 | 0 | 134.6 |
| 2022 Q2 | 10,121 | 0 | 0 | 0.0 |
| 2022 Q1 | 7,246 | 0 | 0 | 0.0 |
| 2021 Q4 | 8,584 | 2 | 1 | 233.0 |
| 2021 Q3 | 7,633 | 0 | 0 | 0.0 |
| 2021 Q2 | 9,042 | 3 | 1 | 331.8 |
| 2021 Q1 | 7,374 | 0 | 0 | 0.0 |
| 2020 Q4 | 9,275 | 6 | 0 | 646.9 |
| 2020 Q3 | 7,724 | 0 | 0 | 0.0 |
| 2020 Q2 | 8,014 | 3 | 1 | 374.3 |
| 2020 Q1 | 5,711 | 0 | 0 | 0.0 |
| 2019 Q4 | 7,479 | 2 | 0 | 267.4 |
| 2019 Q3 | 7,970 | 0 | 0 | 0.0 |
| 2019 Q2 | 7,128 | 2 | 2 | 280.6 |
| 2019 Q1 | 7,391 | 0 | 0 | 0.0 |
| 2018 Q4 | 5,261 | 2 | 1 | 380.2 |
| 2018 Q3 | 8,749 | 0 | 0 | 0.0 |
| 2018 Q2 | 8,270 | 4 | 1 | 483.7 |
| 2018 Q1 | 8,826 | 3 | 3 | 339.9 |
| 2017 Q4 | 8,384 | 0 | 0 | 0.0 |
| 2017 Q3 | 8,952 | 1 | 1 | 111.7 |
| 2017 Q2 | 8,694 | 4 | 1 | 460.1 |
| 2017 Q1 | 9,771 | 0 | 0 | 0.0 |
| 2016 Q4 | 8,019 | 5 | 3 | 623.5 |
| 2016 Q3 | 8,833 | 2 | 1 | 226.4 |
| 2016 Q2 | 8,363 | 0 | 0 | 0.0 |
| 2016 Q1 | 10,939 | 3 | 0 | 274.2 |
| 2015 Q4 | 8,799 | 0 | 0 | 0.0 |
| 2015 Q3 | 10,213 | 0 | 0 | 0.0 |
| 2015 Q2 | 8,876 | 3 | 0 | 338.0 |
| 2015 Q1 | 8,519 | 0 | 0 | 0.0 |
| 2014 Q4 | 8,586 | 2 | 1 | 232.9 |
| 2014 Q3 | 9,491 | 2 | 1 | 210.7 |
| 2014 Q2 | 9,340 | 0 | 0 | 0.0 |
| 2014 Q1 | 6,662 | 1 | 0 | 150.1 |
| 2013 Q4 | 8,289 | 1 | 0 | 120.6 |
| 2013 Q3 | 7,776 | 0 | 0 | 0.0 |
| 2013 Q2 | 9,029 | 5 | 1 | 553.8 |
| 2013 Q1 | 9,146 | 0 | 0 | 0.0 |
| 2012 Q4 | 8,573 | 4 | 3 | 466.6 |
| 2012 Q3 | 8,046 | 0 | 0 | 0.0 |
| 2012 Q2 | 9,095 | 7 | 1 | 769.7 |
| 2012 Q1 | 8,548 | 0 | 0 | 0.0 |
| 2011 Q4 | 7,205 | 4 | 1 | 555.2 |
| 2011 Q3 | 7,163 | 0 | 0 | 0.0 |
| 2011 Q2 | 6,860 | 5 | 0 | 728.9 |
| 2011 Q1 | 6,525 | 0 | 0 | 0.0 |
| 2010 Q4 | 6,991 | 11 | 4 | 1573.5 |
| 2010 Q3 | 7,330 | 0 | 0 | 0.0 |
| 2010 Q2 | 7,007 | 4 | 1 | 570.9 |
| 2010 Q1 | 7,105 | 0 | 0 | 0.0 |
| 2009 Q4 | 8,514 | 11 | 2 | 1292.0 |
| 2009 Q3 | 2,127 | 1 | 0 | 470.1 |
| 2009 Q2 | 2,833 | 9 | 5 | 3176.8 |
| 2009 Q1 | 2,812 | 6 | 1 | 2133.7 |
| 2008 Q4 | 13,604 | 0 | 0 | 0.0 |
| 2008 Q3 | 14,188 | 0 | 0 | 0.0 |
| 2008 Q2 | 14,647 | 2 | 1 | 136.5 |
| 2008 Q1 | 13,894 | 18 | 4 | 1295.5 |
| 2007 Q4 | 13,850 | 0 | 0 | 0.0 |
| 2007 Q3 | 15,198 | 3 | 1 | 197.4 |
| 2007 Q2 | 11,988 | 0 | 0 | 0.0 |
| 2007 Q1 | 10,734 | 0 | 0 | 0.0 |
| 2006 Q4 | 11,597 | 5 | 2 | 431.1 |
| 2006 Q3 | 11,125 | 0 | 0 | 0.0 |
| 2006 Q2 | 9,807 | 3 | 1 | 305.9 |
| 2006 Q1 | 9,659 | 0 | 0 | 0.0 |
| 2005 Q4 | 9,444 | 11 | 4 | 1164.8 |
| 2005 Q3 | 3,487 | 0 | 0 | 0.0 |
| 2005 Q2 | 6,714 | 4 | 1 | 595.8 |
| 2005 Q1 | 5,122 | 0 | 0 | 0.0 |
| 2004 Q4 | 5,699 | 0 | 0 | 0.0 |
| 2004 Q3 | 6,513 | 0 | 0 | 0.0 |
| 2004 Q2 | 1,655 | 2 | 1 | 1208.5 |
| 2004 Q1 | 4,692 | 0 | 0 | 0.0 |
| 2003 Q4 | 5,126 | 2 | 0 | 390.2 |
| 2003 Q3 | 4,573 | 0 | 0 | 0.0 |
| 2003 Q2 | 3,905 | 2 | 0 | 512.2 |
| 2003 Q1 | 4,956 | 0 | 0 | 0.0 |
| 2002 Q4 | 4,101 | 0 | 0 | 0.0 |
| 2002 Q3 | 4,303 | 3 | 2 | 697.2 |
| 2002 Q2 | 2,990 | 0 | 0 | 0.0 |
| 2002 Q1 | 2,860 | 1 | 1 | 349.7 |
| 2001 Q4 | 1,440 | 0 | 0 | 0.0 |
| 2001 Q3 | 1,680 | 1 | 0 | 595.2 |
| 2001 Q2 | 1,440 | 0 | 0 | 0.0 |
| 2001 Q1 | 1,638 | 6 | 1 | 3663.0 |
| 2000 Q4 | 1,430 | 0 | 0 | 0.0 |
| 2000 Q3 | 1,680 | 0 | 0 | 0.0 |
| 2000 Q2 | 1,440 | 0 | 0 | 0.0 |
| 2000 Q1 | 1,278 | 0 | 0 | 0.0 |
Reportable incidents
8 on file2025 · 1 incident
2021 · 1 incident
Employee was in the process of measuring stone to be chopped. Second employee moved the roller on the conveyor table of the Hydrasplit which moved the stone forward. Injured employee's left index finger was smashed between the roller and stone. The finger was busted open from the middle knuckle to the end of the finger.
2015 · 1 incident
Chopping and stacking rock. Started having back pain and eventually pain went down leg. Could hardly walk.
2010 · 1 incident
Stacking stone on a pallet someone pushed a stone middle finger was caught between two rocks. End of finger bone was broken and nail damaged.
2009 · 1 incident
Person was cleaning his area, stood up and bumped his head pm am overhead saw travel.
2007 · 1 incident
Went to step off of the concrete slab to the ground (2 inch drop) and twisted his ankle. The doctor stated that he was such a big guy that it didn't have to take much to break his foot. We finally got the M.R.I. results and they stated that it was broken.
2003 · 1 incident
LIFTING STONE TO PUT ON PALLET.
2001 · 1 incident
DRILLING WET LUEDER'S LIMESTONE.