Employee cut EE's fingers while changing the blades on the 950 Cat front end loader. EE was holding the plow bolt head with EE's right hand while using an impact with EE's left to loosen the nut. Once the impact engaged the bolt dropped down and spun cutting the 2 middle fingers.
Corpus Processing Facility Metal/Non-Metal
Corpus Processing Facility has $4K in proposed MSHA penalties and $183 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Corpus Processing Facility.
- Fatalities
- 0
- Total incidents
- 5
- Years on record
- 2017–2024
- Latest incident
- Dec 2024
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Corpus Processing Facility has $4K in proposed MSHA penalties and $183 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 13,188 | 1 | 0 | 75.8 |
| 2025 Q3 | 11,939 | 0 | 0 | 0.0 |
| 2025 Q2 | 11,677 | 0 | 0 | 0.0 |
| 2025 Q1 | 11,457 | 0 | 0 | 0.0 |
| 2024 Q4 | 11,884 | 1 | 0 | 84.1 |
| 2024 Q3 | 11,875 | 0 | 0 | 0.0 |
| 2024 Q2 | 10,732 | 3 | 0 | 279.5 |
| 2024 Q1 | 11,770 | 0 | 0 | 0.0 |
Show 32 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 12,308 | 0 | 0 | 0.0 |
| 2023 Q3 | 12,148 | 0 | 0 | 0.0 |
| 2023 Q2 | 12,301 | 2 | 0 | 162.6 |
| 2023 Q1 | 12,242 | 0 | 0 | 0.0 |
| 2022 Q4 | 10,673 | 0 | 0 | 0.0 |
| 2022 Q3 | 11,317 | 0 | 0 | 0.0 |
| 2022 Q2 | 10,541 | 0 | 0 | 0.0 |
| 2022 Q1 | 11,578 | 4 | 0 | 345.5 |
| 2021 Q4 | 10,019 | 0 | 0 | 0.0 |
| 2021 Q3 | 9,724 | 0 | 0 | 0.0 |
| 2021 Q2 | 8,448 | 3 | 1 | 355.1 |
| 2021 Q1 | 7,495 | 0 | 0 | 0.0 |
| 2020 Q4 | 6,386 | 1 | 0 | 156.6 |
| 2020 Q3 | 7,437 | 0 | 0 | 0.0 |
| 2020 Q2 | 7,127 | 3 | 0 | 420.9 |
| 2020 Q1 | 11,005 | 0 | 0 | 0.0 |
| 2019 Q4 | 9,877 | 1 | 1 | 101.2 |
| 2019 Q3 | 10,714 | 1 | 0 | 93.3 |
| 2019 Q2 | 10,252 | 0 | 0 | 0.0 |
| 2019 Q1 | 10,200 | 0 | 0 | 0.0 |
| 2018 Q4 | 11,304 | 1 | 0 | 88.5 |
| 2018 Q3 | 10,459 | 0 | 0 | 0.0 |
| 2018 Q2 | 9,490 | 2 | 0 | 210.7 |
| 2018 Q1 | 9,369 | 0 | 0 | 0.0 |
| 2017 Q4 | 9,635 | 2 | 0 | 207.6 |
| 2017 Q3 | 9,341 | 0 | 0 | 0.0 |
| 2017 Q2 | 7,980 | 1 | 1 | 125.3 |
| 2017 Q1 | 6,850 | 0 | 0 | 0.0 |
| 2016 Q4 | 5,252 | 3 | 0 | 571.2 |
| 2016 Q3 | 4,379 | 0 | 0 | 0.0 |
| 2016 Q2 | 4,273 | 5 | 0 | 1170.1 |
| 2016 Q1 | 4,622 | 0 | 0 | 0.0 |
Reportable incidents
5 on file2024 · 1 incident
2022 · 1 incident
EE was throwing trash in dumpster when EE slipped on a wet area and fell, fracturing the right fibula.
2020 · 1 incident
While replacing the skirting on the bottom of the crude feed south blending hopper a rock fell from the grating above approx 11 feet and struck the employee on the head.
2018 · 1 incident
Using overhead hoist with chain and hook, a strap was used to grab hold of the plow body attached to the hook. The hook from the overhead hoist got caught onto an I-Beam which caused tension to build up on the chain lifting up Plow body which then slipped off the I-beam and caused the corner of the Plow Body to strike the employee on lower lip and bottom jaw.
2017 · 1 incident
Employee was lowering a metal plate to install at the mill floor that weighed 85lbs. The plate slid, cut and fractured employee's finger at the tip.
The full compliance file on Corpus Processing Facility
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.