citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 780 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Imminent-danger orders
ⓘA Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.
1
Section 107(a) orders
Most recent order: 2010-11-02.
On record since 2010.
Source: MSHA imminent-danger order records, updated weekly.
Crusher has $33K in proposed MSHA penalties and $328 outstanding across 1 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$33K
proposed penalties
$33K
current assessed
$33K
paid to date
$328
outstanding
105 assessments are final orders; 1 contested dockets.
Of $5K in penalties contested before the Commission, $5K was upheld in final decisions.
As of the most recent assessment on 2026-06-09.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
1citations taken to the federal commission · 1% of citations on record
Stood as issued
1 · 100%
100%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 1 decided S&S contests · industry: 79%
0%
Penalty reduction in decided contests
$5K proposed, $5K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2011-08-08.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Metal and nonmetal contaminants (personal samples)
ⓘMany samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2020-11-17, 5 years ago
0%
of limit-tested samples over the exposure limit
8
samples
6
limit-tested
Most sampled contaminants
Quartz, respirable, >1% Qtz7
Respirable dust, <.1mg1
Show the individual readings (8)
Date
Contaminant
Concentration
Limit
Conc / limit
Occupation
2020-11-17
Quartz, respirable, >1% Qtz
0.68
0.88
0.77
Bobcat Operator
2020-11-17
Quartz, respirable, >1% Qtz
0.19
Crusher Oper/Worker
2017-08-30
Quartz, respirable, >1% Qtz
0.35
1.32
0.27
Bulldozer Operator
2017-08-30
Respirable dust, <.1mg
0
Truck Driver
2010-04-13
Quartz, respirable, >1% Qtz
0.13
0.83
0.16
Crusher Oper/Worker
2010-04-13
Quartz, respirable, >1% Qtz
0.17
0.88
0.19
Front-end Loader Operator
2002-08-28
Quartz, respirable, >1% Qtz
0.25
0.62
0.40
Front-end Loader Operator
2002-08-28
Quartz, respirable, >1% Qtz
0.41
0.69
0.59
Front-end Loader Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year
Employees
2026
6
2025
6
2024
6
2023
6
2022
6
2021
6
2020
5
2019
6
2018
6
2017
6
2016
3
2015
3
2014
3
2013
3
2012
2
2011
3
2010
3
2009
3
2008
4
2007
4
2006
3
2005
4
2004
2
2003
2
2002
4
2001
2
2000
0
Source: MSHA quarterly employment and production, updated weekly.
Crusher sits in Okanogan County, Washington, where the Census mining category is 0.1% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Okanogan County, Washington · Population 42,811
0.1%
Mining share of county employment
$60,293
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2026 Q1
2,737
5
0
1826.8
2025 Q4
2,874
0
0
0.0
2025 Q3
2,406
0
0
0.0
2025 Q2
2,204
6
1
2722.3
2024 Q4
2,209
0
0
0.0
2024 Q3
3,202
0
0
0.0
2024 Q2
2,804
0
0
0.0
2024 Q1
2,003
0
0
0.0
Show 95 earlier quartersHide earlier quarters
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2023 Q4
2,202
2
1
908.3
2023 Q3
2,402
4
1
1665.3
2023 Q2
1,000
0
0
0.0
2023 Q1
2,202
7
1
3178.9
2022 Q4
2,202
0
0
0.0
2022 Q3
2,403
8
2
3329.2
2022 Q2
1,602
0
0
0.0
2022 Q1
1,602
1
0
624.2
2021 Q4
1,602
1
0
624.2
2021 Q3
2,404
0
0
0.0
2021 Q2
2,404
1
0
416.0
2021 Q1
2,063
0
0
0.0
2020 Q4
1,920
1
0
520.8
2020 Q3
2,400
0
0
0.0
2020 Q2
2,402
1
0
416.3
2020 Q1
1,281
1
0
780.6
2019 Q4
1,923
0
0
0.0
2019 Q3
2,005
0
0
0.0
2019 Q2
2,002
6
0
2997.0
2019 Q1
1,603
0
0
0.0
2018 Q4
2,205
1
1
453.5
2018 Q3
2,405
0
0
0.0
2018 Q2
2,402
1
0
416.3
2018 Q1
1,604
7
1
4364.1
2017 Q4
2,406
0
0
0.0
2017 Q3
1,924
4
0
2079.0
2017 Q2
2,403
0
0
0.0
2017 Q1
802
0
0
0.0
2016 Q4
642
0
0
0.0
2016 Q3
964
0
0
0.0
2016 Q2
763
0
0
0.0
2016 Q1
482
0
0
0.0
2015 Q4
644
1
0
1552.8
2015 Q3
724
0
0
0.0
2015 Q2
245
0
0
0.0
2015 Q1
645
3
0
4651.2
2014 Q4
964
0
0
0.0
2014 Q3
906
0
0
0.0
2014 Q2
645
2
0
3100.8
2014 Q1
321
0
0
0.0
2013 Q4
324
0
0
0.0
2013 Q3
322
6
2
18633.5
2013 Q2
486
0
0
0.0
2013 Q1
244
0
0
0.0
2012 Q3
645
2
0
3100.8
2012 Q2
4
0
0
0.0
2012 Q1
4
0
0
0.0
2011 Q4
245
0
0
0.0
2011 Q3
903
0
0
0.0
2011 Q2
6
0
0
0.0
2011 Q1
322
0
0
0.0
2010 Q4
604
2
0
3311.3
2010 Q3
320
0
0
0.0
2010 Q2
990
5
2
5050.5
2010 Q1
484
0
0
0.0
2009 Q4
323
0
0
0.0
2009 Q3
963
0
0
0.0
2009 Q2
964
0
0
0.0
2009 Q1
601
0
0
0.0
2008 Q4
650
3
1
4615.4
2008 Q3
970
0
0
0.0
2008 Q2
1,443
3
1
2079.0
2008 Q1
734
0
0
0.0
2007 Q4
1,206
0
0
0.0
2007 Q3
1,446
0
0
0.0
2007 Q2
1,406
0
0
0.0
2007 Q1
484
0
0
0.0
2006 Q4
364
2
0
5494.5
2006 Q3
366
0
0
0.0
2006 Q2
2
0
0
0.0
2006 Q1
962
0
0
0.0
2005 Q4
1,202
0
0
0.0
2005 Q3
602
0
0
0.0
2005 Q2
461
0
0
0.0
2005 Q1
841
0
0
0.0
2004 Q4
960
0
0
0.0
2004 Q3
2
3
2
1500000.0
2004 Q2
962
0
0
0.0
2004 Q1
960
1
0
1041.7
2003 Q4
841
0
0
0.0
2003 Q3
0
0
0
2003 Q2
1,040
0
0
0.0
2003 Q1
641
0
0
0.0
2002 Q4
181
0
0
0.0
2002 Q3
382
0
0
0.0
2002 Q2
161
0
0
0.0
2002 Q1
231
0
0
0.0
2001 Q4
1,003
0
0
0.0
2001 Q3
1,935
0
0
0.0
2001 Q2
0
0
0
2001 Q1
0
0
0
2000 Q4
0
6
3
2000 Q3
0
0
0
2000 Q2
0
0
0
2000 Q1
0
0
0
Fatalities at this mine
1 recorded
September 26, 1985WA · Metal/Non-MetalsuperintendentFatality · POWERED HAULAGE
REAR RIGHT TIRE OF LOADER DROPPED OVER EDGE OF EMBANKMENT WHILE BACKING UP.BANK GAVE WAY CAUSING LOADER TO ROLL EJECTING DRIVER PINNING DRIVER UNDER LOADER FATALLY INJURING DRIVER AND DOING EX TENSIVE DAMAGE TO LOADER.
Related mines
Other mines operated by Godbey Red-E-Mix Concrete Inc