Moving a pallet with a walk behind forklift, was backing up and bumped into a table
E S Stone and Structure Mobile 2 Metal/Non-Metal
E S Stone and Structure Mobile 2 has $17K in proposed MSHA penalties and $0 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at E S Stone and Structure Mobile 2.
- Fatalities
- 0
- Total incidents
- 11
- Years on record
- 2005–2021
- Latest incident
- Aug 2021
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.E S Stone and Structure Mobile 2 has $17K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 1,665 | 0 | 0 | 0.0 |
| 2025 Q3 | 1,447 | 0 | 0 | 0.0 |
| 2025 Q2 | 1,487 | 0 | 0 | 0.0 |
| 2025 Q1 | 1,224 | 0 | 0 | 0.0 |
| 2024 Q4 | 1,484 | 1 | 0 | 673.9 |
| 2024 Q3 | 771 | 0 | 0 | 0.0 |
| 2024 Q2 | 938 | 0 | 0 | 0.0 |
| 2024 Q1 | 2,252 | 0 | 0 | 0.0 |
Show 77 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 2,125 | 0 | 0 | 0.0 |
| 2023 Q3 | 2,557 | 0 | 0 | 0.0 |
| 2023 Q2 | 2,478 | 0 | 0 | 0.0 |
| 2023 Q1 | 1,637 | 0 | 0 | 0.0 |
| 2022 Q4 | 1,505 | 0 | 0 | 0.0 |
| 2022 Q3 | 2,172 | 0 | 0 | 0.0 |
| 2022 Q2 | 1,852 | 0 | 0 | 0.0 |
| 2022 Q1 | 1,285 | 0 | 0 | 0.0 |
| 2021 Q4 | 2,034 | 0 | 0 | 0.0 |
| 2021 Q3 | 1,157 | 2 | 1 | 1728.6 |
| 2021 Q2 | 1,071 | 0 | 0 | 0.0 |
| 2021 Q1 | 2,000 | 0 | 0 | 0.0 |
| 2020 Q4 | 3,299 | 0 | 0 | 0.0 |
| 2020 Q3 | 4,030 | 1 | 0 | 248.1 |
| 2020 Q2 | 2,483 | 0 | 0 | 0.0 |
| 2020 Q1 | 2,644 | 1 | 0 | 378.2 |
| 2019 Q4 | 2,980 | 0 | 0 | 0.0 |
| 2019 Q3 | 2,664 | 0 | 0 | 0.0 |
| 2019 Q2 | 3,699 | 0 | 0 | 0.0 |
| 2019 Q1 | 2,181 | 1 | 0 | 458.5 |
| 2018 Q4 | 3,772 | 0 | 0 | 0.0 |
| 2018 Q3 | 3,561 | 2 | 0 | 561.6 |
| 2018 Q2 | 3,976 | 0 | 0 | 0.0 |
| 2018 Q1 | 3,376 | 1 | 0 | 296.2 |
| 2017 Q4 | 5,828 | 0 | 0 | 0.0 |
| 2017 Q3 | 6,399 | 0 | 0 | 0.0 |
| 2017 Q2 | 6,208 | 2 | 1 | 322.2 |
| 2017 Q1 | 5,055 | 1 | 0 | 197.8 |
| 2016 Q4 | 5,873 | 0 | 0 | 0.0 |
| 2016 Q3 | 6,039 | 0 | 0 | 0.0 |
| 2016 Q2 | 6,032 | 0 | 0 | 0.0 |
| 2016 Q1 | 9,028 | 0 | 0 | 0.0 |
| 2015 Q4 | 5,660 | 1 | 0 | 176.7 |
| 2015 Q3 | 4,968 | 0 | 0 | 0.0 |
| 2015 Q2 | 6,979 | 0 | 0 | 0.0 |
| 2015 Q1 | 6,180 | 2 | 0 | 323.6 |
| 2014 Q4 | 7,495 | 0 | 0 | 0.0 |
| 2014 Q3 | 7,122 | 3 | 1 | 421.2 |
| 2014 Q2 | 6,689 | 0 | 0 | 0.0 |
| 2014 Q1 | 5,846 | 2 | 0 | 342.1 |
| 2013 Q4 | 6,282 | 0 | 0 | 0.0 |
| 2013 Q3 | 6,544 | 0 | 0 | 0.0 |
| 2013 Q2 | 5,071 | 1 | 0 | 197.2 |
| 2013 Q1 | 4,770 | 0 | 0 | 0.0 |
| 2012 Q4 | 5,459 | 1 | 1 | 183.2 |
| 2012 Q3 | 6,170 | 0 | 0 | 0.0 |
| 2012 Q2 | 7,577 | 1 | 0 | 132.0 |
| 2012 Q1 | 6,895 | 4 | 0 | 580.1 |
| 2011 Q4 | 7,231 | 0 | 0 | 0.0 |
| 2011 Q3 | 6,743 | 2 | 1 | 296.6 |
| 2011 Q2 | 5,142 | 0 | 0 | 0.0 |
| 2011 Q1 | 4,225 | 0 | 0 | 0.0 |
| 2010 Q4 | 7,107 | 5 | 1 | 703.5 |
| 2010 Q3 | 7,901 | 0 | 0 | 0.0 |
| 2010 Q2 | 2,732 | 0 | 0 | 0.0 |
| 2010 Q1 | 6,344 | 0 | 0 | 0.0 |
| 2009 Q4 | 8,968 | 6 | 3 | 669.0 |
| 2009 Q3 | 7,250 | 15 | 6 | 2069.0 |
| 2009 Q2 | 9,370 | 2 | 0 | 213.4 |
| 2009 Q1 | 7,974 | 0 | 0 | 0.0 |
| 2008 Q4 | 9,988 | 0 | 0 | 0.0 |
| 2008 Q3 | 12,090 | 3 | 2 | 248.1 |
| 2008 Q2 | 13,372 | 0 | 0 | 0.0 |
| 2008 Q1 | 13,551 | 0 | 0 | 0.0 |
| 2007 Q4 | 13,953 | 0 | 0 | 0.0 |
| 2007 Q3 | 12,946 | 0 | 0 | 0.0 |
| 2007 Q2 | 9,850 | 0 | 0 | 0.0 |
| 2007 Q1 | 9,826 | 0 | 0 | 0.0 |
| 2006 Q4 | 11,591 | 4 | 0 | 345.1 |
| 2006 Q3 | 12,463 | 0 | 0 | 0.0 |
| 2006 Q2 | 12,749 | 1 | 0 | 78.4 |
| 2006 Q1 | 14,027 | 0 | 0 | 0.0 |
| 2005 Q4 | 12,325 | 1 | 0 | 81.1 |
| 2005 Q3 | 11,819 | 1 | 0 | 84.6 |
| 2005 Q2 | 8,384 | 0 | 0 | 0.0 |
| 2005 Q1 | 5,273 | 0 | 0 | 0.0 |
| 2004 Q4 | 7,548 | 0 | 0 | 0.0 |
Reportable incidents
11 on file2021 · 1 incident
2015 · 1 incident
Pulling on a rock on the roller table at the breaker felt pop in right shoulder. Caused a pectoral strain.
2012 · 1 incident
Cutting metal with 4" grinder when blade pinched causing grinder to jump and cut finger.
2009 · 1 incident
An employee suffered a fatal heart attack while palletizing stone.(found injury laying on the ground adjacent to 3 pallet of rock he had been palitizing. unresponsive. CPR was performed EMS service were called and continued CPR. The sheriff prounced the miner dead approx. 12:05 pm MSHA was notified 12:52 pm) by Misc Mail 4/28/09 #3.
2007 · 5 incidents
Tripped & hurt ankle. Hairline Fracture.
Stung by a bee.
Slipped on steps of trailer, pulled groin muscles
Moving a rock when pain occured between shoulder blades.
Lifting a rock off the breaker and when he set it down his back went numb.
2006 · 1 incident
Stepping out of truck ankle gave out.
2005 · 1 incident
Tent door came unhooked and fell on miners head as he was going out. Small laceration requiring 3 stiches. Miner returned to work next scheduled shift.
The full compliance file on E S Stone and Structure Mobile 2
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.