citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 574 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Kellar #2 has $6K in proposed MSHA penalties and $118 outstanding across 1 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$6K
proposed penalties
$5K
current assessed
$5K
paid to date
$118
outstanding
14 assessments are final orders; 1 contested dockets.
Of $4K in penalties contested before the Commission, $4K was upheld in final decisions.
As of the most recent assessment on 2018-08-30.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
2citations taken to the federal commission · 14% of citations on record
Settled
2 · 100%
100%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 1 decided S&S contests · industry: 79%
10%
Penalty reduction in decided contests
$4K proposed, $4K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2008-10-16.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
MSHA sampling at Kellar #2 shows 100% of 76 respirable coal dust samples met the 1.5 mg/m3 standard.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2024-03-21
100%
within 1.5 mg/m3
76
samples
0.33
dust max (mg/m3)
0
over MSHA ECV
ⓘThe excessive concentration value (ECV) is MSHA's own per-sample enforcement threshold, which builds in measurement uncertainty; a sample over its ECV can trigger a citation. The count covers only samples MSHA assigned an ECV.
67 samples taken by MSHA inspectors, 9 by the operator.
Noise
ⓘThe share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Health sampling trend
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust by year
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
ⓘCoal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.
Year
Employees
Coal produced (tons)
2024
2
802
2023
2
1,240
2022
2
491
2021
3
727
2020
3
6,689
2019
3
4,436
2018
3
2,535
2017
3
1,782
2016
2
6,431
2015
2
2,015
2014
2
2,985
2013
3
10,399
2012
2
6,237
2011
3
6,033
2010
3
8,548
2009
3
7,890
2008
3
22,427
2007
3
16,625
2006
3
16,271
2005
3
11,419
Source: MSHA quarterly employment and production, updated weekly.
Kellar #2 sits in Clearfield County, Pennsylvania, where the Census mining category is 1.3% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Clearfield County, Pennsylvania · Population 78,902
1.3%
Mining share of county employment
$60,181
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2024 Q2
104
0
0
0.0
2024 Q1
100
0
0
0.0
2023 Q4
86
0
0
0.0
2023 Q3
170
0
0
0.0
2023 Q2
212
0
0
0.0
2022 Q4
138
0
0
0.0
2021 Q1
227
0
0
0.0
2020 Q4
378
0
0
0.0
Show 55 earlier quartersHide earlier quarters
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2020 Q3
185
0
0
0.0
2020 Q2
660
0
0
0.0
2020 Q1
378
0
0
0.0
2019 Q4
188
0
0
0.0
2019 Q3
903
0
0
0.0
2018 Q2
468
0
0
0.0
2018 Q1
170
0
0
0.0
2017 Q3
88
0
0
0.0
2017 Q2
144
0
0
0.0
2016 Q2
0
0
0
2016 Q1
1,055
0
0
0.0
2015 Q4
0
0
0
2015 Q3
210
0
0
0.0
2015 Q2
373
0
0
0.0
2015 Q1
0
0
0
2014 Q4
0
0
0
2014 Q3
207
0
0
0.0
2014 Q2
434
1
0
2304.1
2014 Q1
412
0
0
0.0
2013 Q4
992
0
0
0.0
2013 Q3
774
0
0
0.0
2013 Q2
723
0
0
0.0
2013 Q1
621
0
0
0.0
2012 Q4
919
0
0
0.0
2012 Q3
531
2
0
3766.5
2012 Q2
0
0
0
2012 Q1
378
1
0
2645.5
2011 Q4
90
0
0
0.0
2011 Q3
240
0
0
0.0
2011 Q2
471
0
0
0.0
2011 Q1
339
0
0
0.0
2010 Q4
360
0
0
0.0
2010 Q3
230
0
0
0.0
2010 Q2
670
0
0
0.0
2010 Q1
264
0
0
0.0
2009 Q4
369
0
0
0.0
2009 Q3
258
0
0
0.0
2009 Q2
378
2
1
5291.0
2009 Q1
756
0
0
0.0
2008 Q4
1,203
0
0
0.0
2008 Q3
1,119
0
0
0.0
2008 Q2
1,098
2
1
1821.5
2008 Q1
735
0
0
0.0
2007 Q4
1,061
4
4
3770.0
2007 Q3
1,278
0
0
0.0
2007 Q2
1,635
0
0
0.0
2007 Q1
360
0
0
0.0
2006 Q4
876
0
0
0.0
2006 Q3
932
0
0
0.0
2006 Q2
555
0
0
0.0
2006 Q1
321
1
0
3115.3
2005 Q4
1,070
0
0
0.0
2005 Q3
120
0
0
0.0
2005 Q2
100
0
0
0.0
2005 Q1
1,693
0
0
0.0
No fatalities recorded at this mine.
Reportable incidents
1 on file
2005 · 1 incident
February 15, 2005PA · Coallaborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitmanMACHINERY
Kellar Augering · Caught in, under or between (Not Elsewhere Classified)
Got finger pinched between two augers on 2-15-05 did not report to me until 3-4-05.