LEXINGTON PIT: 93 MSHA citations Metal/Non-Metal

Controlled by Glen Olmstead
Lexington, Dawson County, NE  ·  Abandoned
MSHA Mine ID: 2501010

LEXINGTON PIT has $22K in proposed MSHA penalties and $0 outstanding across 5 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at LEXINGTON PIT.

Fatalities
0
Total incidents
0
Years on record
Latest incident
Compliance record
MSHA citations since 2001
93
citations
30
significant & substantial
$21,621
proposed penalties
$18,929
paid to date
88% of proposed penalties paid to date, a $2,692 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2001
43
inspections on record
523
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 523 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Imminent-danger orders
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.
1
Section 107(a) orders
Most recent order: 2010-07-07.
On record since 2010.
Source: MSHA imminent-danger order records, updated weekly.

LEXINGTON PIT has $22K in proposed MSHA penalties and $0 outstanding across 5 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$22K
proposed penalties
$19K
current assessed
$19K
paid to date
$0
outstanding
92 assessments are final orders; 5 contested dockets.
Of $9K in penalties contested before the Commission, $6K was upheld in final decisions.
As of the most recent assessment on 2023-10-17.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
32.6%
significant & substantial
13.0%
high negligence or reckless
32.6%
reasonably likely or greater
65.2%
permanently disabling or fatal if injury occurs
Negligence coding: 1.1% none, 2.2% low, 83.7% moderate, 13.0% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
10 citations taken to the federal commission · 11% of citations on record
  • Settled 7 · 70%
  • Stood as issued 3 · 30%
100%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 10 decided S&S contests · industry: 79%
33%
Penalty reduction in decided contests
$8K proposed, $6K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2015-07-21.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
CENT 2011-180M Settlement Lesnick 2011 $4K → $2K
CENT 2015-0512 Dismissal Lesnick 2015 $2K → $2K
CENT 2015-0511 Settlement Lesnick 2015 $2K → $1K
CENT 2005-69M Default Lesnick 2005 $514 → $514
CENT 2004-21-M Dismissal Zielinski 2004 $472 → $390
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2019-09-17, 6 years ago
0%
of limit-tested samples over the exposure limit
8
samples
2
limit-tested
Most sampled contaminants
  • Respirable dust, <.1mg5
  • Quartz, respirable, >1% Qtz2
  • Unlisted Particulate, respirable, <1% Qtz1
Show the individual readings (8)
Date Contaminant Concentration Limit Conc / limit Occupation
2019-09-17 Respirable dust, <.1mg 0 Front-end Loader Operator
2019-09-17 Respirable dust, <.1mg 0 Dredge/Barge Operator
2017-06-01 Respirable dust, <.1mg 0 Dredge/Barge Operator
2017-06-01 Respirable dust, <.1mg 0 Dredge/Barge Operator
2017-06-01 Quartz, respirable, >1% Qtz 0.16 1.34 0.12 Front-end Loader Operator
2011-06-01 Unlisted Particulate, respirable, <1% Qtz 0.16 Front-end Loader Operator
2004-08-31 Quartz, respirable, >1% Qtz 0.18 0.68 0.26 Front-end Loader Operator
2004-08-31 Respirable dust, <.1mg 0 Dredge/Barge Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Overton Sand & Gravel Company 1983 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2025 1
2024 2
2023 2
2022 2
2021 2
2020 2
2019 2
2018 2
2017 2
2016 3
2015 2
2014 2
2013 2
2012 2
2011 2
2010 3
2009 2
2008 3
2007 4
2006 3
2005 3
2004 2
2003 2
2002 3
2001 5
2000 2
Source: MSHA quarterly employment and production, updated weekly.

LEXINGTON PIT sits in Dawson County, Nebraska, where the Census mining category is 0.1% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Dawson County, Nebraska · Population 24,020
0.1%
Mining share of county employment
$65,383
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2025 Q2 930 0 0 0.0
2025 Q1 560 0 0 0.0
2024 Q4 980 0 0 0.0
2024 Q3 820 0 0 0.0
2024 Q2 980 0 0 0.0
2024 Q1 870 0 0 0.0
2023 Q4 830 2 1 2409.6
2023 Q3 1,180 0 0 0.0
Show 94 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2023 Q2 1,160 0 0 0.0
2023 Q1 710 0 0 0.0
2022 Q4 610 2 0 3278.7
2022 Q3 1,150 0 0 0.0
2022 Q2 1,550 0 0 0.0
2022 Q1 900 0 0 0.0
2021 Q4 1,200 0 0 0.0
2021 Q3 1,770 0 0 0.0
2021 Q2 1,190 0 0 0.0
2021 Q1 850 0 0 0.0
2020 Q4 1,088 1 0 919.1
2020 Q3 1,840 0 0 0.0
2020 Q2 1,780 0 0 0.0
2020 Q1 950 0 0 0.0
2019 Q4 1,020 1 0 980.4
2019 Q3 1,290 0 0 0.0
2019 Q2 1,180 0 0 0.0
2019 Q1 730 0 0 0.0
2018 Q4 920 3 1 3260.9
2018 Q3 1,100 0 0 0.0
2018 Q2 1,050 3 1 2857.1
2018 Q1 722 0 0 0.0
2017 Q4 980 3 0 3061.2
2017 Q3 1,200 0 0 0.0
2017 Q2 1,510 7 1 4635.8
2017 Q1 1,090 5 2 4587.2
2016 Q4 1,595 0 0 0.0
2016 Q3 2,205 3 2 1360.5
2016 Q2 1,550 0 0 0.0
2016 Q1 714 0 0 0.0
2015 Q4 850 0 0 0.0
2015 Q3 2,226 0 0 0.0
2015 Q2 2,100 5 5 2381.0
2015 Q1 630 0 0 0.0
2014 Q4 1,020 0 0 0.0
2014 Q3 1,049 0 0 0.0
2014 Q2 220 5 1 22727.3
2014 Q1 150 1 0 6666.7
2013 Q4 740 0 0 0.0
2013 Q3 1,150 0 0 0.0
2013 Q2 1,090 2 0 1834.9
2013 Q1 630 0 0 0.0
2012 Q4 1,197 1 1 835.4
2012 Q3 1,550 0 0 0.0
2012 Q2 766 0 0 0.0
2012 Q1 1,150 2 0 1739.1
2011 Q4 2,150 0 0 0.0
2011 Q3 1,370 0 0 0.0
2011 Q2 1,020 1 1 980.4
2011 Q1 650 0 0 0.0
2010 Q4 1,450 0 0 0.0
2010 Q3 1,870 8 4 4278.1
2010 Q2 1,110 0 0 0.0
2010 Q1 750 0 0 0.0
2009 Q4 985 0 0 0.0
2009 Q3 1,135 2 0 1762.1
2009 Q2 660 0 0 0.0
2009 Q1 997 0 0 0.0
2008 Q4 1,224 0 0 0.0
2008 Q3 2,720 0 0 0.0
2008 Q2 2,298 0 0 0.0
2008 Q1 940 0 0 0.0
2007 Q4 2,570 0 0 0.0
2007 Q3 3,024 0 0 0.0
2007 Q2 2,745 0 0 0.0
2007 Q1 1,255 0 0 0.0
2006 Q4 2,804 4 0 1426.5
2006 Q3 1,910 0 0 0.0
2006 Q2 1,202 12 1 9983.4
2006 Q1 443 0 0 0.0
2005 Q4 720 0 0 0.0
2005 Q3 2,705 0 0 0.0
2005 Q2 2,342 0 0 0.0
2005 Q1 915 0 0 0.0
2004 Q4 1,200 0 0 0.0
2004 Q3 1,375 10 6 7272.7
2004 Q2 926 2 0 2159.8
2004 Q1 775 0 0 0.0
2003 Q4 1,250 0 0 0.0
2003 Q3 1,273 0 0 0.0
2003 Q2 1,270 4 2 3149.6
2003 Q1 504 0 0 0.0
2002 Q4 998 0 0 0.0
2002 Q3 1,101 0 0 0.0
2002 Q2 1,231 0 0 0.0
2002 Q1 945 0 0 0.0
2001 Q4 1,440 0 0 0.0
2001 Q3 1,519 3 1 1975.0
2001 Q2 4,260 0 0 0.0
2001 Q1 275 0 0 0.0
2000 Q4 130 0 0 0.0
2000 Q3 400 0 0 0.0
2000 Q2 768 0 0 0.0
2000 Q1 0 0 0

No reportable incidents on file.

MSHA has no recorded reportable accidents for this mine in the current dataset. New reports appear here within a week of being filed.