Flames were noticed on the truck by the blasters when prepping the face to be loaded with explosives. Mine was evacuated.
North Indianapolis Underground Quarry: 190 MSHA citations Metal/Non-Metal
North Indianapolis Underground Quarry has $79K in proposed MSHA penalties and $0 outstanding across 6 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at North Indianapolis Underground Quarry.
- Fatalities
- 0
- Total incidents
- 47
- Years on record
- 1988–2024
- Latest incident
- Oct 2024
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.North Indianapolis Underground Quarry has $79K in proposed MSHA penalties and $0 outstanding across 6 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 6 · 60%
- Vacated or withdrawn 4 · 40%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| LAKE 2021-0168 | Settlement | Moran | 2021 | $2K → $395 |
| LAKE 2018-0013 | Withdrawal | Gill | 2018 | $1K → $232 |
| LAKE 2012-284M | Settlement | Lesnick | 2012 | $1K → $585 |
| LAKE 2017-0035 | Settlement | Simonton | 2017 | $1K → $390 |
| LAKE 2015-0655 | Withdrawal | Lewis | 2016 | $634 → $0 |
| LAKE 2015-0530 | Settlement | Harner | 2015 | $460 → $368 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2026-08-10
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Diesel particulate (total carbon)5011 over
- Total Carbon,calculated from elemental carbon.163 over
- Total Carbon,TC162 over
- Diesel Particulate Material52 over
Show the individual readings (100)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2022-08-31 | Quartz, respirable, >1% Qtz | 2.48 | 2.13 | 1.16 | Scaling (mechanical) |
| 2020-09-10 | TC @ 160 | 168 | 160 | 1.05 | Roof Bolter, Rock |
| 2018-07-17 | TC @ 160 | 180 | 160 | 1.13 | Blaster, Powder Gang |
| 2018-06-05 | TC @ 160 | 224 | 160 | 1.40 | Blaster, Powder Gang |
| 2018-06-05 | EC @ 160 | 174 | 160 | 1.09 | Blaster, Powder Gang |
| 2018-06-05 | TC from EC @ 160 | 211 | 160 | 1.32 | Blaster, Powder Gang |
| 2015-07-22 | TC from EC @ 160 | 199 | 160 | 1.24 | Blaster, Powder Gang |
| 2015-07-22 | EC @ 160 | 163 | 160 | 1.02 | Blaster, Powder Gang |
| 2015-07-22 | TC @ 160 | 208 | 160 | 1.30 | Blaster, Powder Gang |
| 2015-07-22 | TC @ 160 | 474 | 160 | 2.96 | Roof Bolter, Rock |
| 2015-07-22 | EC @ 160 | 394 | 160 | 2.46 | Roof Bolter, Rock |
| 2014-08-21 | TC @ 160 | 184 | 160 | 1.15 | Blaster, Powder Gang |
| 2014-08-21 | EC @ 160 | 162 | 160 | 1.01 | Blaster, Powder Gang |
| 2012-08-15 | TC @ 160 | 176 | 160 | 1.10 | Blaster, Powder Gang |
| 2010-11-17 | TC @ 160 | 171 | 160 | 1.07 | Truck Driver |
| 2010-11-17 | TC @ 160 | 162 | 160 | 1.01 | Drill Operator, Rotary Air |
| 2010-06-09 | TC @ 160 | 258 | 160 | 1.61 | Scaling (mechanical) |
| 2010-06-09 | EC @ 160 | 171 | 160 | 1.07 | Scaling (mechanical) |
| 2010-06-09 | TC from EC @ 160 | 198 | 160 | 1.24 | Scaling (mechanical) |
| 2008-09-24 | TC @ 160 | 226 | 160 | 1.41 | Truck Driver |
| 2008-04-23 | TCarbon @ 350 | 446.34 | 350 | 1.28 | Scaling (mechanical) |
| 2006-07-19 | Diesel Particulate Material | 347.61 | 308 | 1.13 | Roof Bolter, Rock |
| 2006-05-04 | Diesel Particulate Material | 424.27 | 308 | 1.38 | Roof Bolter, Rock |
| 2002-11-26 | Total Carbon,calculated from elemental carbon. | 432.17 | 400 | 1.08 | Blaster, Powder Gang |
| 2002-11-26 | Total Carbon,TC | 573.44 | 400 | 1.43 | Roof Bolter, Mounted |
| 2002-11-26 | Total Carbon,TC | 423.09 | 400 | 1.06 | Blaster, Powder Gang |
| 2002-11-26 | Total Carbon,calculated from elemental carbon. | 588.31 | 400 | 1.47 | Roof Bolter, Mounted |
| 2002-11-26 | Total Carbon,calculated from elemental carbon. | 421.41 | 400 | 1.05 | Blaster, Powder Gang |
| 2026-08-10 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2026-08-10 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2026-08-10 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2026-08-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2025-08-05 | ORGANIC CARBON | 0 | Scaling (mechanical) | ||
| 2025-08-05 | TC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2025-08-05 | EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2025-08-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2025-01-15 | Respirable dust, <.1mg | 0 | Scaling (mechanical) | ||
| 2024-08-27 | TC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2024-08-27 | ORGANIC CARBON | 0 | Drill Operator, Rotary | ||
| 2024-08-27 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2024-08-27 | EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2023-07-26 | EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2023-07-26 | TC @ 160 | 37 | 160 | 0.23 | Blaster, Powder Gang |
| 2023-07-26 | ORGANIC CARBON | 0 | Blaster, Powder Gang | ||
| 2023-07-26 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2022-08-31 | EC @ 160 | 44 | 160 | 0.28 | Roof Bolter, Rock |
| 2022-08-31 | TC @ 160 | 128 | 160 | 0.80 | Roof Bolter, Rock |
| 2022-08-31 | ORGANIC CARBON | 82 | Blaster, Powder Gang | ||
| 2022-08-31 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2022-08-31 | ORGANIC CARBON | 84 | Roof Bolter, Rock | ||
| 2022-08-31 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2022-08-31 | TC @ 160 | 136 | 160 | 0.85 | Blaster, Powder Gang |
| 2022-08-31 | EC @ 160 | 54 | 160 | 0.34 | Blaster, Powder Gang |
| 2022-08-31 | Quartz, respirable, >1% Qtz | 0.72 | Drill Operator, Rotary Air | ||
| 2022-08-31 | Unlisted Particulate, respirable, <1% Qtz | 0.32 | Blaster, Powder Gang | ||
| 2021-04-27 | ORGANIC CARBON | 0 | Blaster, Powder Gang | ||
| 2021-04-27 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2021-04-27 | EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2021-04-27 | TC @ 160 | 35 | 160 | 0.22 | Blaster, Powder Gang |
| 2021-04-27 | ORGANIC CARBON | 0 | Blaster, Powder Gang | ||
| 2021-04-27 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2021-04-27 | TC @ 160 | 34 | 160 | 0.21 | Blaster, Powder Gang |
| 2021-04-27 | EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2020-09-10 | EC @ 160 | 61 | 160 | 0.38 | Roof Bolter, Rock |
| 2020-09-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2020-09-10 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2020-09-10 | TC @ 160 | 98 | 160 | 0.61 | Blaster, Powder Gang |
| 2020-09-10 | EC @ 160 | 70 | 160 | 0.44 | Blaster, Powder Gang |
| 2019-05-02 | TC @ 160 | 80 | 160 | 0.50 | Roof Bolter, Rock |
| 2019-05-02 | EC @ 160 | 46 | 160 | 0.29 | Roof Bolter, Rock |
| 2019-05-02 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary Air |
| 2019-05-02 | EC @ 160 | 41 | 160 | 0.26 | Drill Operator, Rotary Air |
| 2019-05-02 | TC @ 160 | 60 | 160 | 0.38 | Drill Operator, Rotary Air |
| 2019-05-02 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2018-07-17 | EC @ 160 | 141 | 160 | 0.88 | Blaster, Powder Gang |
| 2018-07-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2018-06-05 | EC @ 160 | 22 | 160 | 0.14 | Scaling (mechanical) |
| 2018-06-05 | EC @ 160 | 40 | 160 | 0.25 | Roof Bolter, Rock |
| 2018-06-05 | TC @ 160 | 43 | 160 | 0.27 | Scaling (mechanical) |
| 2018-06-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2018-06-05 | TC @ 160 | 53 | 160 | 0.33 | Roof Bolter, Rock |
| 2018-06-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2017-09-28 | TC @ 160 | 156 | 160 | 0.98 | Roof Bolter, Rock |
| 2017-09-28 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2017-09-28 | EC @ 160 | 56 | 160 | 0.35 | Drill Operator, Jumbo Perc. |
| 2017-09-28 | TC @ 160 | 86 | 160 | 0.54 | Drill Operator, Jumbo Perc. |
| 2017-09-28 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2017-09-28 | EC @ 160 | 96 | 160 | 0.60 | Roof Bolter, Rock |
| 2015-11-24 | TC @ 160 | 71 | 160 | 0.44 | Blaster, Powder Gang |
| 2015-11-24 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2015-11-24 | EC @ 160 | 56 | 160 | 0.35 | Blaster, Powder Gang |
| 2015-11-24 | TC @ 160 | 76 | 160 | 0.48 | Drill Operator, Jumbo Perc. |
| 2015-11-24 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2015-11-24 | EC @ 160 | 58 | 160 | 0.36 | Drill Operator, Jumbo Perc. |
| 2015-11-24 | EC @ 160 | 68 | 160 | 0.43 | Roof Bolter, Mounted |
| 2015-11-24 | TC @ 160 | 90 | 160 | 0.56 | Roof Bolter, Mounted |
| 2015-11-24 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2015-09-17 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2015-09-17 | EC @ 160 | 83 | 160 | 0.52 | Roof Bolter, Mounted |
| 2015-09-17 | TC @ 160 | 104 | 160 | 0.65 | Roof Bolter, Mounted |
Area samples (mill and shop air)
Last sampled: 2026-08-10Show the individual readings (25)
| Date | Contaminant | Concentration | Limit | Conc / limit | Area sampled |
|---|---|---|---|---|---|
| 2026-08-10 | TC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2026-08-10 | EC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2025-08-05 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2025-08-05 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2024-08-27 | EC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2024-08-27 | TC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2023-07-26 | TC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2023-07-26 | EC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2022-08-31 | TC @ 160 | 0 | UG GENERAL | ||
| 2022-08-31 | EC @ 160 | 0 | UG GENERAL | ||
| 2021-04-27 | TC from EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-04-27 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-04-27 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2018-06-05 | TC @ 160 | 409 | UG TRAVEL/HAULAGE | ||
| 2018-06-05 | EC @ 160 | 337 | UG TRAVEL/HAULAGE | ||
| 2018-06-05 | TC from EC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2015-07-22 | TC from EC @ 160 | 0 | UG GENERAL AREA SAMP | ||
| 2015-07-22 | TC @ 160 | 555 | UG GENERAL AREA SAMP | ||
| 2015-07-22 | EC @ 160 | 457 | UG GENERAL AREA SAMP | ||
| 2010-06-09 | EC @ 160 | 344 | UG Active -Exhaust | ||
| 2010-06-09 | TC @ 160 | 400 | UG Active -Exhaust | ||
| 2010-06-09 | TC from EC @ 160 | 0 | UG Active -Exhaust | ||
| 2008-09-24 | TC from EC @ 160 | 0 | MAIN EXHAUST | ||
| 2008-09-24 | EC @ 160 | 233 | MAIN EXHAUST | ||
| 2008-09-24 | TC @ 160 | 296 | MAIN EXHAUST |
North Indianapolis Underground Quarry recorded 0.00 reportable injury cases per 100 full-time workers in 2025.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2025 * | 0.00 | 0.00 | 0.000 |
| 2024 * | 0.00 | 0.00 | 0.000 |
| 2023 * | 0.00 | 0.00 | 0.000 |
| 2022 * | 0.00 | 0.00 | 0.000 |
| 2021 * | 0.00 | 0.00 | 0.000 |
| 2020 * | 0.00 | 0.00 | 0.000 |
| 2019 * | 4.76 | 4.76 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
- American Aggregates Corp 1986 to 1987
- American Aggregates Corp 1987 to 1989
- American Aggregates Corp 1989 to 1990
- American Aggregates Corp 1990 to 1997
- Martin Marietta Aggregates 1997 to 2005
- Martin Marietta Materials, Inc. 2002 to 2003
- Martin Marietta Materials Inc 2005 to present
| Year | Employees |
|---|---|
| 2026 | 25 |
| 2025 | 24 |
| 2024 | 22 |
| 2023 | 19 |
| 2022 | 22 |
| 2021 | 23 |
| 2020 | 22 |
| 2019 | 23 |
| 2018 | 18 |
| 2017 | 17 |
| 2016 | 15 |
| 2015 | 15 |
| 2014 | 13 |
| 2013 | 15 |
| 2012 | 15 |
| 2011 | 16 |
| 2010 | 17 |
| 2009 | 18 |
| 2008 | 17 |
| 2007 | 21 |
| 2006 | 15 |
| 2005 | 16 |
| 2004 | 15 |
| 2003 | 14 |
| 2002 | 16 |
| 2001 | 18 |
| 2000 | 18 |
North Indianapolis Underground Quarry sits in Hamilton County, Indiana, where the Census mining category is 0.0% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 14,232 | 1 | 0 | 70.3 |
| 2026 Q1 | 10,316 | 2 | 0 | 193.9 |
| 2025 Q4 | 11,686 | 0 | 0 | 0.0 |
| 2025 Q3 | 11,018 | 2 | 2 | 181.5 |
| 2025 Q2 | 14,085 | 1 | 1 | 71.0 |
| 2025 Q1 | 11,311 | 2 | 1 | 176.8 |
| 2024 Q4 | 12,409 | 12 | 5 | 967.0 |
| 2024 Q3 | 13,242 | 4 | 3 | 302.1 |
Show 98 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 14,152 | 3 | 2 | 212.0 |
| 2024 Q1 | 9,731 | 2 | 2 | 205.5 |
| 2023 Q4 | 13,390 | 2 | 1 | 149.4 |
| 2023 Q3 | 12,663 | 4 | 3 | 315.9 |
| 2023 Q2 | 12,147 | 2 | 2 | 164.6 |
| 2023 Q1 | 9,650 | 4 | 3 | 414.5 |
| 2022 Q4 | 12,070 | 5 | 3 | 414.3 |
| 2022 Q3 | 15,797 | 7 | 3 | 443.1 |
| 2022 Q2 | 15,492 | 0 | 0 | 0.0 |
| 2022 Q1 | 10,234 | 3 | 1 | 293.1 |
| 2021 Q4 | 13,616 | 6 | 4 | 440.7 |
| 2021 Q3 | 12,974 | 3 | 0 | 231.2 |
| 2021 Q2 | 12,461 | 3 | 1 | 240.8 |
| 2021 Q1 | 9,121 | 2 | 0 | 219.3 |
| 2020 Q4 | 13,231 | 1 | 0 | 75.6 |
| 2020 Q3 | 14,583 | 2 | 0 | 137.1 |
| 2020 Q2 | 15,090 | 3 | 1 | 198.8 |
| 2020 Q1 | 7,900 | 5 | 2 | 632.9 |
| 2019 Q4 | 11,873 | 3 | 1 | 252.7 |
| 2019 Q3 | 11,611 | 1 | 0 | 86.1 |
| 2019 Q2 | 11,425 | 1 | 0 | 87.5 |
| 2019 Q1 | 7,115 | 2 | 1 | 281.1 |
| 2018 Q4 | 11,026 | 3 | 1 | 272.1 |
| 2018 Q3 | 11,086 | 1 | 0 | 90.2 |
| 2018 Q2 | 11,086 | 2 | 0 | 180.4 |
| 2018 Q1 | 8,450 | 2 | 1 | 236.7 |
| 2017 Q4 | 13,037 | 2 | 1 | 153.4 |
| 2017 Q3 | 11,710 | 2 | 0 | 170.8 |
| 2017 Q2 | 10,448 | 0 | 0 | 0.0 |
| 2017 Q1 | 8,801 | 0 | 0 | 0.0 |
| 2016 Q4 | 10,758 | 1 | 0 | 93.0 |
| 2016 Q3 | 10,580 | 9 | 3 | 850.7 |
| 2016 Q2 | 9,005 | 3 | 0 | 333.1 |
| 2016 Q1 | 7,812 | 1 | 0 | 128.0 |
| 2015 Q4 | 9,521 | 5 | 1 | 525.2 |
| 2015 Q3 | 8,368 | 4 | 2 | 478.0 |
| 2015 Q2 | 15,002 | 2 | 0 | 133.3 |
| 2015 Q1 | 5,400 | 1 | 0 | 185.2 |
| 2014 Q4 | 9,144 | 1 | 1 | 109.4 |
| 2014 Q3 | 7,975 | 1 | 0 | 125.4 |
| 2014 Q2 | 7,940 | 2 | 1 | 251.9 |
| 2014 Q1 | 2,303 | 0 | 0 | 0.0 |
| 2013 Q4 | 8,467 | 0 | 0 | 0.0 |
| 2013 Q3 | 8,596 | 0 | 0 | 0.0 |
| 2013 Q2 | 7,566 | 1 | 0 | 132.2 |
| 2013 Q1 | 3,008 | 0 | 0 | 0.0 |
| 2012 Q4 | 7,728 | 0 | 0 | 0.0 |
| 2012 Q3 | 8,806 | 2 | 0 | 227.1 |
| 2012 Q2 | 9,489 | 0 | 0 | 0.0 |
| 2012 Q1 | 4,059 | 0 | 0 | 0.0 |
| 2011 Q4 | 8,190 | 4 | 1 | 488.4 |
| 2011 Q3 | 9,684 | 0 | 0 | 0.0 |
| 2011 Q2 | 8,655 | 4 | 0 | 462.2 |
| 2011 Q1 | 3,527 | 0 | 0 | 0.0 |
| 2010 Q4 | 9,969 | 3 | 1 | 300.9 |
| 2010 Q3 | 10,284 | 0 | 0 | 0.0 |
| 2010 Q2 | 10,411 | 4 | 2 | 384.2 |
| 2010 Q1 | 5,338 | 1 | 0 | 187.3 |
| 2009 Q4 | 11,641 | 4 | 0 | 343.6 |
| 2009 Q3 | 9,539 | 0 | 0 | 0.0 |
| 2009 Q2 | 10,571 | 2 | 0 | 189.2 |
| 2009 Q1 | 3,610 | 2 | 0 | 554.0 |
| 2008 Q4 | 10,308 | 0 | 0 | 0.0 |
| 2008 Q3 | 10,284 | 0 | 0 | 0.0 |
| 2008 Q2 | 10,772 | 0 | 0 | 0.0 |
| 2008 Q1 | 5,108 | 2 | 0 | 391.5 |
| 2007 Q4 | 18,004 | 1 | 0 | 55.5 |
| 2007 Q3 | 12,235 | 3 | 0 | 245.2 |
| 2007 Q2 | 13,643 | 1 | 0 | 73.3 |
| 2007 Q1 | 10,775 | 0 | 0 | 0.0 |
| 2006 Q4 | 10,180 | 0 | 0 | 0.0 |
| 2006 Q3 | 10,003 | 0 | 0 | 0.0 |
| 2006 Q2 | 10,026 | 2 | 1 | 199.5 |
| 2006 Q1 | 9,195 | 2 | 0 | 217.5 |
| 2005 Q4 | 10,534 | 1 | 0 | 94.9 |
| 2005 Q3 | 10,923 | 1 | 0 | 91.5 |
| 2005 Q2 | 10,545 | 0 | 0 | 0.0 |
| 2005 Q1 | 9,650 | 0 | 0 | 0.0 |
| 2004 Q4 | 10,841 | 0 | 0 | 0.0 |
| 2004 Q3 | 9,209 | 1 | 0 | 108.6 |
| 2004 Q2 | 9,304 | 0 | 0 | 0.0 |
| 2004 Q1 | 8,813 | 3 | 1 | 340.4 |
| 2003 Q4 | 8,689 | 2 | 0 | 230.2 |
| 2003 Q3 | 8,095 | 0 | 0 | 0.0 |
| 2003 Q2 | 8,650 | 1 | 1 | 115.6 |
| 2003 Q1 | 6,127 | 0 | 0 | 0.0 |
| 2002 Q4 | 8,418 | 0 | 0 | 0.0 |
| 2002 Q3 | 8,375 | 2 | 0 | 238.8 |
| 2002 Q2 | 11,235 | 0 | 0 | 0.0 |
| 2002 Q1 | 8,642 | 0 | 0 | 0.0 |
| 2001 Q4 | 12,456 | 2 | 0 | 160.6 |
| 2001 Q3 | 11,819 | 0 | 0 | 0.0 |
| 2001 Q2 | 11,687 | 0 | 0 | 0.0 |
| 2001 Q1 | 9,384 | 2 | 0 | 213.1 |
| 2000 Q4 | 11,346 | 0 | 0 | 0.0 |
| 2000 Q3 | 12,423 | 0 | 0 | 0.0 |
| 2000 Q2 | 12,491 | 1 | 1 | 80.1 |
| 2000 Q1 | 8,884 | 0 | 0 | 0.0 |
Reportable incidents
47 on file2024 · 1 incident
2019 · 1 incident
Rock bounced off of a pillar during blasting and contacted the employee
2005 · 5 incidents
Employee was operating his loader in the mine when he moved suddenly and hit his head on the heater control knobs.
While closing magazine door on powder monkey, he was holding one door closed with left hand and slammed the second door with right hand. When the door slammed shut, it shut on his finger.
Employee was travelling through the mine on his roof bolter when he hit a hole that resulted in a neck strain
Employees were performing the shift inspection and found a roof fall that had fallen out above the anchorage zone!
Employee was operating a Haul Truck when he hit a bump and his head struck the padded ceiling of the LHD.
2004 · 5 incidents
Employee was using a pry bar to assist in getting a wheel on the hub lugs when he strained his shoulder.
Employee was sitting at desk completing paperwork when he felt something in his eye.
Employee was carrying bolts to his basket when they shifted twisting his shoulder
Employee was evading a small rock falling from the back and twisted his lower back
While climbing down from his loader, the employee swung around and pulled his shoulder!
2003 · 1 incident
EMPLOYEE DROVE HAUL TRUCK OVER A BENCH WHICH RESULTED IN A LACERATION TO HIS LEG.
2002 · 1 incident
EMPLOYEE WAS WORKING ON ENGINE WHEN THE HOOD CAME DOWN AND FORCED HIS FACE INTO THE ENGINE CAUSING A LACERATION TO HIS FOREHEAD.
2001 · 2 incidents
EE WAS MOUNTING HIS EQUIPMENT WHEN HE SLIPPED AND FELL ON THE CATWALK BRUISING HIS TAILBONE.
EE WAS ADJACENT TO THE FACE INSPECTING HIS WORK WHEN A SMALL ROCK FELL FROM THE BACK, BOUNCING OFF OF THE FACE AND INTO THE OPEN DOOR OF THE SCALER, STIRKING HIM ON THE HAND.
2000 · 1 incident
OPERATING GRADALL SCALER STARTTED COMPLAINING OF SORENESS IN LOWER BACK. DR ISSUED RESTRICETEDWORK ACTIVITY
1999 · 6 incidents
EE WAS CLIMBING UP THE LADDER TO OPERATORS CAB WHEN HE PULLED A MUSCLE IN HIS SHOULDER; NO ACCIDENTS OCCURRED.
EMPLOYEE WAS USING HANDSCALING BAR WHEN HE STRAINED HIS RIGHT UPPER BACK AND SHOULDER.
EE WAS IN A BUCKET TRUCK BASKET HAND SCALING W/ANOTHER EE WHEN HE TOOK A REST AND WAS WATCHING THE OTHER EE S WORK WHEN A ROCK FALL FROM THE BACK CRUSHING HIS HAND AGAINST THE BASKET RAILING.
EE WAS WADING THROUGH WATER UNDERGROUND WHILE CARRYING A PIN THAT FELL OFF OF THE EQUIPMENT HE WAS DRIVING WHEN HE TRIPPED OVER A ROCK UNDER THE WATER AND FELL ON HIS RIGHT ELBOW AND SHOULDER.
EE WAS EXCITING THE PLANT & STEPPED ON A SLICK FLOOR PLATE, FELL & INJ HIS BACK
EE WAS HANDING TOOLS TO OTHER EE'S SPLICING A BELT WHEN HE TWISTED AWKARDLY & HURT HIS BACK
1998 · 6 incidents
ROOF BOLT FELL, MASHING LEFT THUMB AGAINST BOLT DRIVER.
EMPLOYEE MASHED FINGER WHILE MANUALLY LOADING A DRILL HAMMER ON A PALLET.
SOFTBALL SIZED ROCK FELL FROM BACK AND STRUCK HIM ON THE LEFT SHOULDER WHILE ASSISTING POWDERMAN CHECKING MISFIRE. INITIAL INJURIES WERE DETERMINED TO BE FIRST AID. IMPINGEMENT OF SHOULDER OCC URRED OVER TIME RESULTING IN NEED FOR SURGERY.
EE STEPPED ON ROCK & TWISTED/STRAINED KNEE WHILELOADING A SHOT AT THE UNDERGROUND FACE
EE STEPPED FROM CAB OF DRILL AND TWISTED ANKLE/LEG WHEN HE STEPPED ON A ROCK.
EE WAS BEING TRANSPORTED FROM MINE FOR AN EVACUATION FIRE DRILL THE PICK UP TRUCK HIT A BUMP AND HE WAS BOUNCED AND HIT HIS TAIL BONE.
1997 · 3 incidents
EE SLIPPED, FELL & CAUGHT HIMSELF WHILE FUELING A LOADER. INITIAL INJURY FIRST AID. EE CONTINUED WITH PROBLEMS. MEDICAL TREATMENT & LOST TIME.
WAS WALKNG BACK TO ROOF BOLTER STEPPED ON A ROCK AND TWISTED RT. ANKLE.
EMPLOYEE WAS STEPPING DOWN WHEN HE FELL STRIKING HEAD AND BACK.
1996 · 3 incidents
EE WAS SWINGING THE BOOM ACROSS THE FACE AND IT STOPPED ON ITS OWN AND SLAMED HIS BACK INO THERIALING AND BENT HI BACKKWARDS.
EE PULLED ROOF BOLTS OUT OF THE ROOF BOLT CARRIER ON THE ROOF BOLTER AND HE PULLED A MUSCLE IN HIS BACK.
EE WAS LOADING THE BOTTOM OF THE FACE WHEN HE TRIPPED ON A ROCK AND SLAMMED HIS LEFT FOOT DOWN ON A ROCK.
1995 · 1 incident
EE WAS PULLING A PLATE SCREEN AWAY FROM THE WALL. THE SCREEN SLIPPED OUT O HIS HAND AND IT PULLED HIS FINGER INTO THE WALL & SMASHED IT.
1994 · 1 incident
INJURED WAS CUTTING THE BELT ON THE STACKER. HE CLIMBED BEHIND THE BELT CLAMP THAT WAS SECURED. WHEN HE COMPLETED THE CUT, HE LOST HIS BALANCE, FELL FORWARD AND CUT HIS RIGHT BICEP WITH THE KNIFE THAT WAS IN HIS LEFT HAND.
1993 · 2 incidents
EMPLOYEE WAS HAMMERING ON A BUSHING AND A PIECE OF METAL FLEW OFF AND HIT HIS RIGHT HAND. AT THE TIME THE PAPERWORK WAS FILLED OUT, ON 8/30/93, EMPLOYEE'S HAND WAS A LITTLE SORE. ON 8/31/93, E MPLOYEE'S HAND BECAME SWOLLEN AND THEN EMPLOYEE WENT TO THE CLINIC. THE DOCTOR CUT OPEN EMPLOYEE'S HAND AND REMOVED A PIECE OF METAL.
EMPLOYEE WAS LOADING A SUPPORT FRAME AND IT FELL ON HIS SHOULDER.
1992 · 1 incident
EMPLOYEE WAS REPLACING A BENT STEEL WHEN IT SLIPPED AND FELL ON HIS FOOT.
1991 · 2 incidents
EE WAS WORKING ON 2 CONVEYOR SPEED REDUCER TAKING THE BOLTS OFF THE MOTOR TO REMOVE THE BELTS THE WRENCH SLIPPED OFF HE LOST HIS BALANCE AND FELL BACK ACROSS THE HEAD BOX WITH HIS RIGHT LEG HU NG UNDER THE BELT. HE HAD BEEN STADING IN OIL EARLIER.
EE WAS PRYING THE BOTTOM SCREEN UP ON THE 6X16 SHAKER WITH A PRYBAR AND THE PRYBAR SLIPPED AND HIT HIM IN THE LEFT EAR KNOCKING HIS HARD HAT OFF.
1990 · 1 incident
EMPLOYEE WAS PRYING ON SIDE RAIL AND IT BROKE LOOSE, HE THEN FELL WHEN HE LOST HIS BALANCE AND HIT HIS HEAD ON A CROWN BAR.
1989 · 1 incident
WHILE ASSITING AN EMPLOYEE, HE WAS HOLDING A PRY BAR UNTIL THE EMPLOYEE COULD CHAINGE INTO A BETTER POSTION, WHEN HE BEGAN TO PULL THE BAR SLIPPED AND STRUCK HIS FINGER.
1988 · 3 incidents
EMP LIFTING 50 LB BAG ONT TRUCK WHEN HE TWISTED B ACK
EMPLOYEE WAS RELOADING BOLT MAGAZINE ON THE ROOF BOLTER WHEN HE STEPPED ON A ROCK AND TWISTED HIS ANKLE.
EMP WA> USING A LIFT BACKET TO REACH A BLAST HOLE THE BASKET WA> NOT ING TGHE POPER POSITION TO REACH THE HOLE THE EMP OPENED THE GATE TO TRY TO REACH HOLE WHEN HIS FOOT SLIPPED AND HE FEL L APPROX. 15 FT. TO THE MINE FLOOR IT SHOULD BE NOTED THAT EMP WAS WARNED AGAINST THIS SAME ACT ON 7-11-88