Employee was assisting to remove cutting edge bolts from a loader bucket that was properly blocked & locked out. Employee failed to use PPE. Since injury we have retrained employee as well as gave additional task training. Employee got EE's finger cut which required five stitches. No long term impairment.
Plant #67: 11 MSHA citations Metal/Non-Metal
Controlled by
Mathy Construction Company
Black River Falls,
La Crosse County,
WI
·
Intermittent
MSHA Mine ID: 4703304
Plant #67 has $1K in proposed MSHA penalties and $0 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Plant #67.
- Fatalities
- 0
- Total incidents
- 2
- Years on record
- 2005–2021
- Latest incident
- Jul 2021
Compliance record
MSHA citations since 2005
11
citations
0
significant & substantial
$1,096
proposed penalties
$1,096
paid to date
100% of proposed penalties paid to date, a $0 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2002
32
inspections on record
247
inspection hours
n/a
citations per 100 inspection hours
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Rate withheld: 247 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Plant #67 has $1K in proposed MSHA penalties and $0 outstanding across 1 contested dockets.
Penalty disposition
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.$1K
proposed penalties
$1K
current assessed
$1K
paid to date
$0
outstanding
11 assessments are final orders; 1 contested dockets.
Of $133 in penalties contested before the Commission, $133 was upheld in final decisions.
As of the most recent assessment on 2023-04-04.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.0.0%
significant & substantial
0.0%
high negligence or reckless
0.0%
reasonably likely or greater
63.6%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 63.6% low, 36.4% moderate, 0.0% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
1
citations taken to the federal commission · 9% of citations on record
- Settled 1 · 100%
0%
Penalty reduction in decided contests
$133 proposed, $133 after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2022-10-19.
Contested penalties
ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| LAKE 2023-0022 | Settlement | Paez | 2023 | $133 → $133 |
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2023-06-07, 3 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.3
samples
0
limit-tested
Most sampled contaminants
- Respirable dust, <.1mg3
Show the individual readings (3)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2023-06-07 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2019-08-28 | Respirable dust, <.1mg | 0 | Washer Operator | ||
| 2002-07-16 | Respirable dust, <.1mg | 0 | Dry Screen Plant Operator |
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
- Milestone Materials Div of Mathy Construction Co 2002 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
| Year | Employees |
|---|---|
| 2026 | 3 |
| 2025 | 2 |
| 2024 | 2 |
| 2023 | 2 |
| 2022 | 2 |
| 2021 | 1 |
| 2020 | 1 |
| 2019 | 1 |
| 2018 | 1 |
| 2017 | 3 |
| 2016 | 1 |
| 2015 | 1 |
| 2014 | 2 |
| 2013 | 1 |
| 2012 | 1 |
| 2011 | 1 |
| 2010 | 1 |
| 2009 | 2 |
| 2008 | 1 |
| 2007 | 1 |
| 2006 | 1 |
| 2005 | 2 |
| 2004 | 1 |
| 2003 | 1 |
| 2002 | 1 |
Source: MSHA quarterly employment and production, updated weekly.
Plant #67 sits in La Crosse County, Wisconsin, where the Census mining category is 0.0% of county employment.
Local economic context
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.La Crosse County, Wisconsin · Population 120,262
0.0%
Mining share of county employment
$70,704
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.Citations per million employee-hours, as reported to MSHA
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 2,674 | 0 | 0 | 0.0 |
| 2026 Q1 | 1 | 0 | 0 | 0.0 |
| 2025 Q4 | 1,558 | 0 | 0 | 0.0 |
| 2025 Q3 | 2,188 | 0 | 0 | 0.0 |
| 2025 Q2 | 2,171 | 0 | 0 | 0.0 |
| 2025 Q1 | 189 | 0 | 0 | 0.0 |
| 2024 Q4 | 1,904 | 0 | 0 | 0.0 |
| 2024 Q3 | 1,435 | 0 | 0 | 0.0 |
Show 88 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 1,912 | 0 | 0 | 0.0 |
| 2024 Q1 | 241 | 0 | 0 | 0.0 |
| 2023 Q4 | 1,777 | 0 | 0 | 0.0 |
| 2023 Q3 | 1,757 | 0 | 0 | 0.0 |
| 2023 Q2 | 1,449 | 1 | 0 | 690.1 |
| 2023 Q1 | 327 | 0 | 0 | 0.0 |
| 2022 Q4 | 617 | 0 | 0 | 0.0 |
| 2022 Q3 | 1,372 | 1 | 0 | 728.9 |
| 2022 Q2 | 2,955 | 0 | 0 | 0.0 |
| 2022 Q1 | 1 | 0 | 0 | 0.0 |
| 2021 Q4 | 1 | 0 | 0 | 0.0 |
| 2021 Q3 | 1,147 | 0 | 0 | 0.0 |
| 2021 Q2 | 564 | 0 | 0 | 0.0 |
| 2021 Q1 | 1 | 0 | 0 | 0.0 |
| 2020 Q4 | 1 | 0 | 0 | 0.0 |
| 2020 Q3 | 432 | 0 | 0 | 0.0 |
| 2020 Q2 | 735 | 0 | 0 | 0.0 |
| 2020 Q1 | 1 | 0 | 0 | 0.0 |
| 2019 Q4 | 630 | 0 | 0 | 0.0 |
| 2019 Q3 | 717 | 0 | 0 | 0.0 |
| 2019 Q2 | 1 | 0 | 0 | 0.0 |
| 2019 Q1 | 1 | 0 | 0 | 0.0 |
| 2018 Q4 | 1 | 0 | 0 | 0.0 |
| 2018 Q3 | 0 | 0 | 0 | |
| 2018 Q2 | 1 | 0 | 0 | 0.0 |
| 2018 Q1 | 1 | 0 | 0 | 0.0 |
| 2017 Q4 | 1,546 | 0 | 0 | 0.0 |
| 2017 Q3 | 2,943 | 0 | 0 | 0.0 |
| 2017 Q2 | 3,352 | 0 | 0 | 0.0 |
| 2017 Q1 | 1 | 0 | 0 | 0.0 |
| 2016 Q4 | 1 | 0 | 0 | 0.0 |
| 2016 Q3 | 1 | 0 | 0 | 0.0 |
| 2016 Q2 | 1 | 0 | 0 | 0.0 |
| 2016 Q1 | 1 | 0 | 0 | 0.0 |
| 2015 Q4 | 1 | 0 | 0 | 0.0 |
| 2015 Q3 | 1 | 0 | 0 | 0.0 |
| 2015 Q2 | 1 | 0 | 0 | 0.0 |
| 2015 Q1 | 1 | 0 | 0 | 0.0 |
| 2014 Q4 | 1,305 | 0 | 0 | 0.0 |
| 2014 Q3 | 1,394 | 3 | 0 | 2152.1 |
| 2014 Q2 | 1 | 0 | 0 | 0.0 |
| 2014 Q1 | 1 | 0 | 0 | 0.0 |
| 2013 Q4 | 1 | 0 | 0 | 0.0 |
| 2013 Q3 | 292 | 0 | 0 | 0.0 |
| 2013 Q2 | 427 | 0 | 0 | 0.0 |
| 2013 Q1 | 1 | 0 | 0 | 0.0 |
| 2012 Q4 | 481 | 0 | 0 | 0.0 |
| 2012 Q3 | 114 | 0 | 0 | 0.0 |
| 2012 Q2 | 100 | 0 | 0 | 0.0 |
| 2012 Q1 | 549 | 0 | 0 | 0.0 |
| 2011 Q4 | 434 | 0 | 0 | 0.0 |
| 2011 Q3 | 744 | 1 | 0 | 1344.1 |
| 2011 Q2 | 478 | 0 | 0 | 0.0 |
| 2011 Q1 | 117 | 0 | 0 | 0.0 |
| 2010 Q4 | 32 | 0 | 0 | 0.0 |
| 2010 Q3 | 819 | 1 | 0 | 1221.0 |
| 2010 Q2 | 1,155 | 0 | 0 | 0.0 |
| 2010 Q1 | 5 | 0 | 0 | 0.0 |
| 2009 Q4 | 460 | 0 | 0 | 0.0 |
| 2009 Q3 | 1,216 | 1 | 0 | 822.4 |
| 2009 Q2 | 1,253 | 0 | 0 | 0.0 |
| 2009 Q1 | 1 | 0 | 0 | 0.0 |
| 2008 Q4 | 312 | 0 | 0 | 0.0 |
| 2008 Q3 | 49 | 0 | 0 | 0.0 |
| 2008 Q2 | 10 | 0 | 0 | 0.0 |
| 2008 Q1 | 1 | 0 | 0 | 0.0 |
| 2007 Q4 | 173 | 0 | 0 | 0.0 |
| 2007 Q3 | 812 | 1 | 0 | 1231.5 |
| 2007 Q2 | 827 | 0 | 0 | 0.0 |
| 2007 Q1 | 1 | 0 | 0 | 0.0 |
| 2006 Q4 | 944 | 0 | 0 | 0.0 |
| 2006 Q3 | 1,068 | 0 | 0 | 0.0 |
| 2006 Q2 | 857 | 0 | 0 | 0.0 |
| 2006 Q1 | 879 | 0 | 0 | 0.0 |
| 2005 Q4 | 1,093 | 0 | 0 | 0.0 |
| 2005 Q3 | 1,191 | 0 | 0 | 0.0 |
| 2005 Q2 | 909 | 2 | 0 | 2200.2 |
| 2005 Q1 | 1 | 0 | 0 | 0.0 |
| 2004 Q4 | 557 | 0 | 0 | 0.0 |
| 2004 Q3 | 773 | 0 | 0 | 0.0 |
| 2004 Q2 | 1,250 | 0 | 0 | 0.0 |
| 2004 Q1 | 1 | 0 | 0 | 0.0 |
| 2003 Q4 | 127 | 0 | 0 | 0.0 |
| 2003 Q3 | 470 | 0 | 0 | 0.0 |
| 2003 Q2 | 2,009 | 0 | 0 | 0.0 |
| 2003 Q1 | 0 | 0 | 0 | |
| 2002 Q4 | 353 | 0 | 0 | 0.0 |
| 2002 Q3 | 622 | 0 | 0 | 0.0 |
No fatalities recorded at this mine.
Reportable incidents
2 on file2021 · 1 incident
July 26, 2021
WI · Metal/Non-Metal
laborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitman
HANDLING OF MATERIALS
Milestone Materials Div of Mathy Construction Co · Struck by... (Not Elsewhere Classified)
2005 · 1 incident
May 17, 2005
WI · Metal/Non-Metal
laborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitman
POWERED HAULAGE
Milestone Materials Div of Mathy Construction Co · Struck against a moving object
Employee drove a loader in 3rd gear into the sand wall to scoop up a bucket full of material for the plant and felt a sharp pain in her back.