SCHRECKENGOST MINE has $16K in proposed MSHA penalties and $0 outstanding across 2 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at SCHRECKENGOST MINE.
Fatalities
0
Total incidents
1
Years on record
2015
Latest incident
Feb 2015
Compliance record
MSHA citations since 2008
71
citations
27
significant & substantial
$16,331
proposed penalties
$10,767
paid to date
66% of proposed penalties paid to date, a $5,564 gap.
citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
71 citations across 1,279 inspection hours.
Source: MSHA inspections data, updated weekly.
SCHRECKENGOST MINE has $16K in proposed MSHA penalties and $0 outstanding across 2 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$16K
proposed penalties
$11K
current assessed
$11K
paid to date
$0
outstanding
69 assessments are final orders; 2 contested dockets.
Of $7K in penalties contested before the Commission, $1K was upheld in final decisions.
As of the most recent assessment on 2019-09-24.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
6citations taken to the federal commission · 8% of citations on record
Settled
4 · 67%
Stood as issued
2 · 33%
67%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 3 decided S&S contests · industry: 79%
80%
Penalty reduction in decided contests
$7K proposed, $1K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2010-12-13.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
MSHA sampling at SCHRECKENGOST MINE shows 100% of 96 respirable coal dust samples met the 1.5 mg/m3 standard.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2023-06-01, 3 years ago
100%
within 1.5 mg/m3
96
samples
0.42
dust max (mg/m3)
0
over MSHA ECV
ⓘThe excessive concentration value (ECV) is MSHA's own per-sample enforcement threshold, which builds in measurement uncertainty; a sample over its ECV can trigger a citation. The count covers only samples MSHA assigned an ECV.
90 samples taken by MSHA inspectors, 6 by the operator.
Noise
ⓘThe share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Health sampling trend
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Respirable coal dust by year
ⓘRespirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
ⓘCoal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.
Year
Employees
Coal produced (tons)
2026
2
2025
2
2024
2
2023
2
2022
2
2021
3
2020
3
2019
3
2018
3
2017
3
2016
4
2015
7
2014
7
5,415
2013
6
23,014
2012
6
9,277
2011
4
12,919
2010
4
23,516
2009
4
25,896
2008
2
2,609
Source: MSHA quarterly employment and production, updated weekly.
SCHRECKENGOST MINE sits in Armstrong County, Pennsylvania, where the Census mining category is 2.2% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Armstrong County, Pennsylvania · Population 65,069
2.2%
Mining share of county employment
$64,295
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
DEP insp drove his DEP vehicle out onto the bread work between 2 seed ponds, which is against MSHA regulations. DEP inspector had been warned against doing as he'd done this previously, there was 8' & drifting snow and ee told him to stop, leave his vehicle was unsafe. DEP inspector then got in his vehicle turning around and floored it, hitting ee with vehicle left Targe property.