Tech was flushing a cooling system on a loader. When draining the coolant EE removed the lower radiator hose and splashed EE's right lower arm and right neck with hot coolant. This caused second degree burns to EE's right arm.
Sedalia Quarry Metal/Non-Metal
Sedalia Quarry has $33K in proposed MSHA penalties and $0 outstanding across 5 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Sedalia Quarry.
- Fatalities
- 0
- Total incidents
- 9
- Years on record
- 1997–2020
- Latest incident
- May 2020
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Sedalia Quarry has $33K in proposed MSHA penalties and $0 outstanding across 5 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 2,911 | 0 | 0 | 0.0 |
| 2025 Q3 | 3,672 | 0 | 0 | 0.0 |
| 2025 Q2 | 2,655 | 0 | 0 | 0.0 |
| 2025 Q1 | 2,911 | 0 | 0 | 0.0 |
| 2024 Q4 | 1,924 | 0 | 0 | 0.0 |
| 2024 Q3 | 2,112 | 1 | 0 | 473.5 |
| 2024 Q2 | 2,100 | 0 | 0 | 0.0 |
| 2024 Q1 | 2,338 | 0 | 0 | 0.0 |
Show 96 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 2,308 | 0 | 0 | 0.0 |
| 2023 Q3 | 2,787 | 0 | 0 | 0.0 |
| 2023 Q2 | 2,598 | 0 | 0 | 0.0 |
| 2023 Q1 | 3,276 | 0 | 0 | 0.0 |
| 2022 Q4 | 3,182 | 0 | 0 | 0.0 |
| 2022 Q3 | 3,996 | 0 | 0 | 0.0 |
| 2022 Q2 | 4,105 | 1 | 1 | 243.6 |
| 2022 Q1 | 3,150 | 0 | 0 | 0.0 |
| 2021 Q4 | 2,177 | 2 | 0 | 918.7 |
| 2021 Q3 | 3,653 | 1 | 1 | 273.7 |
| 2021 Q2 | 4,487 | 0 | 0 | 0.0 |
| 2021 Q1 | 4,299 | 1 | 0 | 232.6 |
| 2020 Q4 | 4,509 | 0 | 0 | 0.0 |
| 2020 Q3 | 4,422 | 1 | 0 | 226.1 |
| 2020 Q2 | 4,719 | 0 | 0 | 0.0 |
| 2020 Q1 | 4,864 | 3 | 0 | 616.8 |
| 2019 Q4 | 4,072 | 0 | 0 | 0.0 |
| 2019 Q3 | 4,385 | 0 | 0 | 0.0 |
| 2019 Q2 | 4,087 | 4 | 1 | 978.7 |
| 2019 Q1 | 3,156 | 0 | 0 | 0.0 |
| 2018 Q4 | 3,726 | 0 | 0 | 0.0 |
| 2018 Q3 | 4,834 | 3 | 2 | 620.6 |
| 2018 Q2 | 5,223 | 0 | 0 | 0.0 |
| 2018 Q1 | 4,389 | 0 | 0 | 0.0 |
| 2017 Q4 | 4,132 | 4 | 3 | 968.1 |
| 2017 Q3 | 4,279 | 3 | 0 | 701.1 |
| 2017 Q2 | 4,205 | 0 | 0 | 0.0 |
| 2017 Q1 | 3,930 | 0 | 0 | 0.0 |
| 2016 Q4 | 4,275 | 1 | 0 | 233.9 |
| 2016 Q3 | 4,584 | 2 | 1 | 436.3 |
| 2016 Q2 | 5,202 | 0 | 0 | 0.0 |
| 2016 Q1 | 6,434 | 1 | 0 | 155.4 |
| 2015 Q4 | 5,272 | 0 | 0 | 0.0 |
| 2015 Q3 | 6,330 | 0 | 0 | 0.0 |
| 2015 Q2 | 6,173 | 1 | 0 | 162.0 |
| 2015 Q1 | 4,869 | 0 | 0 | 0.0 |
| 2014 Q4 | 4,942 | 0 | 0 | 0.0 |
| 2014 Q3 | 5,560 | 1 | 0 | 179.9 |
| 2014 Q2 | 5,678 | 0 | 0 | 0.0 |
| 2014 Q1 | 3,264 | 0 | 0 | 0.0 |
| 2013 Q4 | 2,636 | 0 | 0 | 0.0 |
| 2013 Q3 | 6,593 | 0 | 0 | 0.0 |
| 2013 Q2 | 6,487 | 2 | 1 | 308.3 |
| 2013 Q1 | 4,932 | 3 | 2 | 608.3 |
| 2012 Q4 | 1,576 | 0 | 0 | 0.0 |
| 2012 Q3 | 5,102 | 3 | 1 | 588.0 |
| 2012 Q2 | 5,415 | 0 | 0 | 0.0 |
| 2012 Q1 | 7,027 | 2 | 0 | 284.6 |
| 2011 Q4 | 7,011 | 0 | 0 | 0.0 |
| 2011 Q3 | 8,345 | 0 | 0 | 0.0 |
| 2011 Q2 | 7,978 | 6 | 2 | 752.1 |
| 2011 Q1 | 7,964 | 0 | 0 | 0.0 |
| 2010 Q4 | 8,483 | 7 | 2 | 825.2 |
| 2010 Q3 | 13,512 | 14 | 6 | 1036.1 |
| 2010 Q2 | 8,889 | 0 | 0 | 0.0 |
| 2010 Q1 | 6,516 | 7 | 5 | 1074.3 |
| 2009 Q4 | 6,655 | 0 | 0 | 0.0 |
| 2009 Q3 | 8,494 | 3 | 0 | 353.2 |
| 2009 Q2 | 6,744 | 0 | 0 | 0.0 |
| 2009 Q1 | 6,326 | 0 | 0 | 0.0 |
| 2008 Q4 | 6,300 | 5 | 0 | 793.7 |
| 2008 Q3 | 6,180 | 2 | 0 | 323.6 |
| 2008 Q2 | 5,721 | 0 | 0 | 0.0 |
| 2008 Q1 | 5,795 | 0 | 0 | 0.0 |
| 2007 Q4 | 5,639 | 1 | 0 | 177.3 |
| 2007 Q3 | 6,342 | 0 | 0 | 0.0 |
| 2007 Q2 | 6,139 | 1 | 0 | 162.9 |
| 2007 Q1 | 6,246 | 0 | 0 | 0.0 |
| 2006 Q4 | 6,178 | 2 | 0 | 323.7 |
| 2006 Q3 | 6,937 | 3 | 1 | 432.5 |
| 2006 Q2 | 6,606 | 0 | 0 | 0.0 |
| 2006 Q1 | 6,640 | 0 | 0 | 0.0 |
| 2005 Q4 | 6,042 | 12 | 3 | 1986.1 |
| 2005 Q3 | 8,153 | 3 | 1 | 368.0 |
| 2005 Q2 | 7,509 | 0 | 0 | 0.0 |
| 2005 Q1 | 7,084 | 4 | 2 | 564.7 |
| 2004 Q4 | 6,469 | 0 | 0 | 0.0 |
| 2004 Q3 | 7,222 | 0 | 0 | 0.0 |
| 2004 Q2 | 6,659 | 3 | 0 | 450.5 |
| 2004 Q1 | 5,082 | 0 | 0 | 0.0 |
| 2003 Q4 | 7,022 | 1 | 0 | 142.4 |
| 2003 Q3 | 3,329 | 0 | 0 | 0.0 |
| 2003 Q2 | 3,849 | 0 | 0 | 0.0 |
| 2003 Q1 | 3,570 | 1 | 0 | 280.1 |
| 2002 Q4 | 7,555 | 0 | 0 | 0.0 |
| 2002 Q3 | 6,542 | 3 | 0 | 458.6 |
| 2002 Q2 | 7,825 | 0 | 0 | 0.0 |
| 2002 Q1 | 5,179 | 0 | 0 | 0.0 |
| 2001 Q4 | 5,982 | 0 | 0 | 0.0 |
| 2001 Q3 | 5,807 | 2 | 0 | 344.4 |
| 2001 Q2 | 6,944 | 0 | 0 | 0.0 |
| 2001 Q1 | 6,309 | 0 | 0 | 0.0 |
| 2000 Q4 | 5,751 | 0 | 0 | 0.0 |
| 2000 Q3 | 6,848 | 0 | 0 | 0.0 |
| 2000 Q2 | 5,530 | 0 | 0 | 0.0 |
| 2000 Q1 | 5,985 | 3 | 2 | 501.3 |
Reportable incidents
9 on file2020 · 1 incident
2017 · 1 incident
***6/14/17 - FIRST DATE OF MEDICAL TREATMENT*** Had a 50-pound bag on shoulder & a loading pole in the other hand, went to turn around, foot slipped on uneven ground, left foot went forward & fell backwards to the ground - hurt low back
2016 · 2 incidents
miner was done operating the drill and when EE stepped down from the machine EE stepped on a thin piece of metal that pierced EE's left foot
Employee struck thumb on right hand with hammer while removing a speed reducer on a lime belt.
2009 · 1 incident
Employee was removing snow from tail pulley of non-moving conveyor. Upon completion he dragged his hand across telescoping take up receiving cut near his thumb. He then reported the injury. After discussion we decided that another employee should accompany him to the hospital to have it looked at. He received 7 stitches and was released to return to work the next day.
2004 · 1 incident
TRESPASSER DROVE INTO THE SECURED POSTED QUARRY. ACCORDING TO MO HIGHWAY PATROL, SHE WAS TRAVELING TOO FAST, LOST CONTROL ON A GRAVEL LANE, STRUCK SEVERAL LARGE ROCKS AND OVER TURNED SEVERAL TIMES. A NO TRESPASSING CHARGE WAS FILED ON HER. COMPANY WAS NOTIFIED AT 7:00 PM.
2000 · 1 incident
EE WAS UNLOADING AN EXPLOSIVE. TRAILER BENT DOWN TO PICK UP A BAG OF ANFO. FELT LOWER BACK STRAIN & HURT.
1998 · 1 incident
EE WAS OPERATING AN FMC LINKBELT WITH HYDRAULIC ROCK BREAKER WITH FRONT WINDOW OPEN. PIECE OF ROCK [APPROX 1" SQUARE] STRUCK EE ABOVE RIGHT EYE ABOUT 2". EE RECEIVED ABOUT A 1.5" CUT & 6 STITC HES.
1997 · 1 incident
EMPLOYEE WAS STANDING ON BUCKET GREASING D-8 CAT. BUCKET BROKE AND EMPLOYEE FELL BACK LANDING ON HIS RIGHT SHOULDER. EMPLOYEE STATES HE HAS BRUISED SHOULDER.
The full compliance file on Sedalia Quarry
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.