Employee had been driving a ground rod and as he was catching his breath, he leaned on an old stacker belt assembly (the stacker assembly did not have any power source attached) and his hand moved the poly-belt attached between the motor and speed reducer resulting in his right ring finger being caught between the pulley and belt causing a fracture to the tip of his finger.
Superior Highwall Miner System 54 Coal
Superior Highwall Miner System 54 has $3K in proposed MSHA penalties and $0 outstanding across 0 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Superior Highwall Miner System 54.
- Fatalities
- 0
- Total incidents
- 2
- Years on record
- 2011–2012
- Latest incident
- Jan 2012
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Superior Highwall Miner System 54 has $3K in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.MSHA sampling at Superior Highwall Miner System 54 shows respirable coal dust averaging 0.15 mg/m3 (100% compliant) across 13 samples.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2013 Q2 | 0 | 0 | 0 | |
| 2013 Q1 | 0 | 0 | 0 | |
| 2012 Q4 | 0 | 0 | 0 | |
| 2012 Q3 | 0 | 0 | 0 | |
| 2012 Q2 | 9,224 | 1 | 1 | 108.4 |
| 2012 Q1 | 4,463 | 1 | 0 | 224.1 |
| 2011 Q4 | 21,479 | 2 | 1 | 93.1 |
| 2011 Q3 | 8,050 | 2 | 2 | 248.4 |
Reportable incidents
2 on file2012 · 1 incident
2011 · 1 incident
Employee was going to exit the cab of the end loader. As he opened the door, a gust of wind blew dust into his left eye. He was prescribed a medication.
The full compliance file on Superior Highwall Miner System 54
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.