EMP INJ WHEN EMP PLACED TRACK BAR INSIDE OF BACK HOE. BAR HIT BOOM SWING CONTROL EMP CAUGHT BETWEEN BOOM AND THE OUT RIGGER
Village Creek Sand Pit: 1 recorded fatality Metal/Non-Metal
Village Creek Sand Pit has $20K in proposed MSHA penalties and $2K outstanding across 3 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Village Creek Sand Pit.
- Fatalities
- 1
- Total incidents
- 4
- Years on record
- 1983–1990
- Latest incident
- May 1990
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Village Creek Sand Pit has $20K in proposed MSHA penalties and $2K outstanding across 3 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 8 · 89%
- Stood as issued 1 · 11%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| CENT 2007-104M | Settlement | Hodgdon | 2008 | $11K → $600 |
| CENT 2007-89M | Settlement | Hodgdon | 2008 | $5K → $600 |
| CENT 2005-15M | Default | Lesnick | 2005 | $750 → $750 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2005-05-11, 21 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Respirable dust, <.1mg3
- Unlisted Particulate, respirable, <1% Qtz1
Show the individual readings (4)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2005-05-11 | Respirable dust, <.1mg | 0 | Dredge/Barge Operator | ||
| 2005-05-11 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2005-05-11 | Respirable dust, <.1mg | 0 | Laborer, Bullgang | ||
| 2003-03-12 | Unlisted Particulate, respirable, <1% Qtz | 0.18 | Front-end Loader Operator |
- Barry & Barry Sand Company Inc 1950 to 2004
- Village Creek Sand Inc 2004 to present
| Year | Employees |
|---|---|
| 2007 | 2 |
| 2006 | 8 |
| 2005 | 5 |
| 2004 | 6 |
| 2003 | 4 |
| 2002 | 4 |
| 2001 | 7 |
| 2000 | 8 |
Village Creek Sand Pit sits in Hardin County, Texas, where the Census mining category is 2.3% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2007 Q1 | 176 | 0 | 0 | 0.0 |
| 2006 Q4 | 1,567 | 0 | 0 | 0.0 |
| 2006 Q3 | 2,120 | 11 | 5 | 5188.7 |
| 2006 Q2 | 2,690 | 0 | 0 | 0.0 |
| 2006 Q1 | 1,794 | 0 | 0 | 0.0 |
| 2005 Q4 | 1,692 | 0 | 0 | 0.0 |
| 2005 Q3 | 2,038 | 0 | 0 | 0.0 |
| 2005 Q2 | 2,339 | 1 | 0 | 427.5 |
Show 19 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2005 Q1 | 1,740 | 0 | 0 | 0.0 |
| 2004 Q4 | 2,711 | 0 | 0 | 0.0 |
| 2004 Q3 | 3,170 | 0 | 0 | 0.0 |
| 2004 Q2 | 2,088 | 5 | 4 | 2394.6 |
| 2004 Q1 | 2,132 | 1 | 1 | 469.0 |
| 2003 Q4 | 2,509 | 3 | 0 | 1195.7 |
| 2003 Q3 | 2,454 | 0 | 0 | 0.0 |
| 2003 Q2 | 1,833 | 0 | 0 | 0.0 |
| 2003 Q1 | 2,077 | 2 | 1 | 962.9 |
| 2002 Q4 | 1,920 | 0 | 0 | 0.0 |
| 2002 Q3 | 480 | 0 | 0 | 0.0 |
| 2002 Q1 | 2,400 | 0 | 0 | 0.0 |
| 2001 Q4 | 2,400 | 2 | 1 | 833.3 |
| 2001 Q2 | 4,160 | 0 | 0 | 0.0 |
| 2001 Q1 | 3,350 | 0 | 0 | 0.0 |
| 2000 Q4 | 3,706 | 0 | 0 | 0.0 |
| 2000 Q3 | 3,679 | 0 | 0 | 0.0 |
| 2000 Q2 | 3,921 | 3 | 2 | 765.1 |
| 2000 Q1 | 2,000 | 0 | 0 | 0.0 |
Fatalities at this mine
1 recordedReportable incidents
3 on file (excluding fatalities above)1988 · 1 incident
I.NAME WAS LIFT3NG A BATTERY CHARGER OVER THE OPERATORS SEAT OF A CRANE WHEN HE PULLED A MUSCLE IN HIS BACK
1987 · 1 incident
OPERATOR WAS EN7ERING THE CAB OF HIS CRANE HE PLACED ONE FOOT ON A LOWER ELEMENT OF THE TRACK AND STEPPED UP HIS FOOT SLIPPED OFF OF ITS SUPPORT CAUSING HIS KNEE TO CONTACT THE EDGE OF MACHIN E 3
1983 · 1 incident
WHILE STEPPING TO BOARD STEP ON DRAGLINE, LOSS OF BALANCE, JUMPED TO GROUND, STRAINED LOWER SECTION OF BACK.