EE was using a metal cutting blade on a hand grinder. Blade caught & kicked back. EE lost control of the grinder & attempted to "catch" it. EE sustained an abrasion on right chest, a cut on the left chest and a cut on the left outer forearm. The laceration on left outer forearm was through the skin and in to the muscle tissue, requiring stitches. EE was wearing gloves and PPE.
White Creek Mine Metal/Non-Metal
White Creek Mine has $2K in proposed MSHA penalties and $0 outstanding across 0 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at White Creek Mine.
- Fatalities
- 0
- Total incidents
- 2
- Years on record
- 2013–2017
- Latest incident
- Aug 2017
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.White Creek Mine has $2K in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q2 | 2,306 | 0 | 0 | 0.0 |
| 2024 Q3 | 6,455 | 0 | 0 | 0.0 |
| 2023 Q4 | 0 | 0 | 0 | |
| 2023 Q3 | 5,257 | 0 | 0 | 0.0 |
| 2023 Q2 | 2,178 | 0 | 0 | 0.0 |
| 2023 Q1 | 0 | 0 | 0 | |
| 2022 Q4 | 0 | 0 | 0 | |
| 2022 Q3 | 7,359 | 0 | 0 | 0.0 |
Show 22 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2022 Q2 | 2,750 | 0 | 0 | 0.0 |
| 2021 Q4 | 0 | 0 | 0 | |
| 2021 Q3 | 2,890 | 0 | 0 | 0.0 |
| 2021 Q2 | 2,979 | 0 | 0 | 0.0 |
| 2021 Q1 | 0 | 0 | 0 | |
| 2020 Q4 | 0 | 0 | 0 | |
| 2020 Q3 | 6,886 | 4 | 1 | 580.9 |
| 2020 Q2 | 3,278 | 0 | 0 | 0.0 |
| 2017 Q3 | 12,155 | 0 | 0 | 0.0 |
| 2017 Q2 | 3,718 | 0 | 0 | 0.0 |
| 2016 Q4 | 0 | 0 | 0 | |
| 2016 Q3 | 13,230 | 2 | 1 | 151.2 |
| 2016 Q2 | 3,600 | 0 | 0 | 0.0 |
| 2016 Q1 | 0 | 0 | 0 | |
| 2015 Q4 | 0 | 0 | 0 | |
| 2015 Q3 | 2,930 | 6 | 1 | 2047.8 |
| 2015 Q2 | 3,157 | 0 | 0 | 0.0 |
| 2015 Q1 | 0 | 0 | 0 | |
| 2014 Q4 | 2,328 | 0 | 0 | 0.0 |
| 2014 Q3 | 25,356 | 2 | 1 | 78.9 |
| 2014 Q2 | 8,500 | 0 | 0 | 0.0 |
| 2014 Q1 | 0 | 0 | 0 |
Reportable incidents
2 on file2017 · 1 incident
2013 · 1 incident
40ton Volvo dump truck was waiting for an excavator to pass. Excavator cab was cocked to the side and slammed into the front left corner of the truck. Would have been avoided if the cab was sitting square with the tracks. The corner was sheared apart in a 6 inch tear and hydraulic fluid spilled about 2 or 3 gallons. The tear was able to be welded shut.
The full compliance file on White Creek Mine
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.