Mining Incidents

D & F Deep Mine: 23 MSHA citations operator

MSHA operator ID: 0119570

D & F Deep Mine has no reportable incidents on file with MSHA. MSHA has proposed $347K in penalties since 2011, with $106K outstanding.

Watch this operator

Email me when a new MSHA incident is filed at any D & F Deep Mine mine.

Fatalities
0
Total incidents
0
Mines on record
0
Years on record
—
Compliance record
MSHA citations since 2011
23
citations
11
significant & substantial
$347,100
proposed penalties
$42,712
paid to date
12% of proposed penalties paid to date, a $304,388 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2011
11
inspections on record
821
inspection hours
n/a
citations per 100 inspection hours
ⓘ This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 821 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Penalty disposition
ⓘ Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$347K
proposed penalties
$149K
current assessed
$43K
paid to date
$106K
outstanding
21 assessments are final orders; 4 contested dockets.
Of $346K in penalties contested before the Commission, $148K was upheld in final decisions.
As of the most recent assessment on 2013-01-16.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘ Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
52.4%
significant & substantial
23.8%
high negligence or reckless
52.4%
reasonably likely or greater
42.9%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 19.0% low, 57.1% moderate, 0.0% high, 23.8% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
Health sampling
ⓘ A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Respirable coal dust
ⓘ Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.

Last sampled: 2013-01-29, 13 years ago
100%
within 1.5 mg/m3
67
samples
0.62
dust max (mg/m3)
32 samples taken by MSHA inspectors, 35 by the operator.
Most-sampled occupations
  • HAND LOADERS41
  • LABORER12
  • HOIST ENGINEER/OPERATOR6

Noise
ⓘ The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.

Last sampled: 2012-02-09, 14 years ago
0%
over PEL
3
samples
Most-sampled occupations
  • HOIST ENGINEER/OPERATOR1
  • LABORER1
  • SECTION FOREMAN1
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly.
When citations were contested
ⓘ Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
9 citations taken to the federal commission · 39% of citations on record
  • Settled 9 · 100%
100%
S&S designation survived the contest
ⓘ Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 9 decided S&S contests · industry: 79%
57%
Penalty reduction in decided contests
$346K proposed, $148K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2013-04-04. Vacated and withdrawn citations are removed from the file this view attributes through, so that outcome is slightly undercounted here.
Contested penalties
ⓘ A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this operator contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
PENN 2013-198 Settlement Harner 2015 $181K → $140K
PENN 2013-199 Settlement Harner 2015 $158K → $6K
PENN 2013-26 Settlement Harner 2015 $6K → $1K
PENN 2013-27 Settlement Harner 2015 $1K → $600
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.

No reportable incidents on file.

MSHA has no recorded reportable accidents associated with this operator.

For insurers, brokers, and safety consultants

Where D & F Deep Mine stands on silica, penalties, and injury rate

MSHA's standard limits respirable silica to 50 micrograms per cubic metre, but MSHA publishes dust and quartz as separate files and never the silica figure itself. We derive it per sample, score it against the limit, and set the operator's injury rate against a benchmark built from the full MSHA operator record. With the 26-year penalty trail, contest posture, and fatality history. Delivered as a PDF with the underlying data as CSV.

The federal record itself stays free on this site. What costs money, and why.

See a sample report
Need a different cut of the data? Ask us