← Peru mining record · All Peru sanctions
APUMAYO S.A.C.
Peru mining record: safety sanctions, environmental fines and fatal accidents
RUC (tax ID) 20547735014· On record from Oct 24, 2012 to Apr 29, 2022
ⓘ
A resolution (resolución) is OSINERGMIN's formal written decision closing one sanction case: an order from the regulator, not a court judgment. A single resolution can fine several infractions at once, and it can be appealed to TASTEM, the agency's own appeals tribunal.ⓘ
S/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026).ⓘ
The UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles.No sanction resolution names this company in the 2020-2026 SAIP delivery.
| Year | Resolution
ⓘA resolution (resolución) is OSINERGMIN's formal written decision closing one sanction case: an order from the regulator, not a court judgment. A single resolution can fine several infractions at once, and it can be appealed to TASTEM, the agency's own appeals tribunal. |
Sanctioned party as written | Type | TASTEM ruling |
|---|---|---|---|---|
| Aug 18, 2016 | 2367-2016-OS-GSM | APUMAYO S.A.C. |
The regulator's own list, frozen in December 2019. It publishes no fine amount: the resolution PDF is the record. A row naming a titleholder and a contractor together is shown as written.
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Actividades, componentes y/o equipos no declarados
El administrado incumplió con su instrumento de gestión ambiental, al haber realizado lo siguiente: (i) la implementación de la Poza de sedimentación Nº 2 en botadero Apumayo; los Tanques de reactivos en poza de sedimentación Nº 1 del depósito de desmonte Apumayo; los Tanques de reactivos en poza de sedimentación Nº 1 del sistema de tratamiento wetland Apumayo; las instalaciones de la zona de evacuación de lodos; el Tajo Tika y el Depósito de top soil Tika; (ii) la modificación del Depósito de Desmonte Huamanloma Sur y; (iii) la ejecución del relleno de material propio Apumayo Sur; sin contar con certificación ambiental previa
corrective measure ordered
|
105.04 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El administrado dispuso material orgánico top soil en una zona no aprobada en su instrumento de gestión ambiental
|
1.54 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Reportes de emergencia
El administrado implementó la poza de subdrenaje del Sistema Wetland Apumayo en una ubicación distinta a la aprobada en su instrumento de gestión ambiental.
corrective measure ordered
|
16.06 |
|
Incumplimientos formales
El administrado no realizó las coordinaciones para la designación o elección de monitores ambientales, la capacitación a los respectivos monitores y los talleres o charlas de presentación de resultados de los monitoreos participativos correspondientes al noveno y décimo segundo mes del año 2017, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
0.55 |
|
Residuos Sólidos
El administrado no realizó las coordinaciones para la designación o elección de monitores ambientales, la capacitación a los respectivos monitores y los talleres o charlas de presentación de resultados de los monitoreos participativos correspondientes al tercer y sexto mes del año 2017, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Adopción de medidas de previsión y control ambiental
El administrado no habría adoptado las medidas de prevención y control a fin de evitar o impedir que el afloramiento (PF-01), ubicado en coordenadas UTM (WGS 84) E: 616 836, N: 8 345 006, en la parte baja del talud del botadero de desmonte Apumayo, descargue en la quebrada Auqueato.
corrective measure ordered
|
75.55 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El administrado no implementó la cobertura tipo III de material morrénico y/o material propio de la zona en el Botadero de Desmonte 1 Apumayo, ubicado en coordenadas UTM Datum WGS84 Zona 18 8345235 N, 616383 E, incumpliendo con lo establecido en su instrumento de gestión ambiental.
|
17.40 |
|
Actividades, componentes y/o equipos no declarados
El administrado no implementó lo siguiente: (i) poza de captación; (ii) poza de remoción de Fe+2 a Fe+3; (iii) poza de remoción de Al+2 a Al+3; y, (iv) caja de ingreso y canales de conducción cubiertos con caliza en la planta de tratamiento de aguas ácidas – Huamanloma, ubicado en coordenadas UTM WGS 84 Zona 18 8348021 N, 614144 E, incumpliendo lo establecido en su instrumento de gestión ambiental.
*Se archiva en el extremo referido a la falta de implementación de la caja de ingreso y canales de conducción cubiertos con caliza en la planta de tratamiento de aguas ácidas Huamanloma
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Excesos de Límites Máximos Permisibles y/o ECAS
El administrado excedió los Límites Máximos Permisibles en el efluente proveniente de la salida de la Planta Wetland Apumayo, el cual es vertido a través del punto de control EF-APU-02 hacia la quebrada Auqueato, respecto a los parámetros pH, Sólidos Totales Suspendidos, Cadmio Total, Cobre Total, Zinc Total y Hierro Disuelto.
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El administrado no implementó las cunetas de drenaje de agua pluvial en los accesos de las plataformas de perforación con sondajes ejecutados SARC-001, SARC-002, SARC-003, SARC-005, SARC-006, SARC-017, SARC-018, SARC-022, SARC-024, SARC-033, SARC-034, SARC-043, así como en los accesos de las plataformas ubicadas en las coordenadas PSAD 56: 8336586N y 614956E, 8336486N y 614849E, 8336605N y 614861E, 8336498N y 614569E, 8336566N y 614651E, 8336988N y 614740E, 8336809N y 616261E, y 8336672N y 615636E, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
|
|
Compromisos y/o normas ambientales simples
El administrado no implementó los canales de coronación en las plataformas de perforación con sondajes ejecutados SARC-001, SARC-002, SARC-003, SARC-005, SARC-006, SARC-017, SARC-018, SARC-022, SARC-024, SARC-033, SARC-034, SARC-043, y en las plataformas ubicadas en coordenadas PSAD 56: 8336586N y 614956E, 8336486N y 614849E, 8336605N y 614861E, 8336498N y 614569E, 8336566N y 614651E, 8336988N y 614740E, 8336809N y 616261E y, 8336672N y 615636E, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
Apumayo no implementó un área de seguridad en la plataforma de perforación correspondiente al sondaje ANC-02 , incumpliendo lo establecido en su instrumento de gestión ambiental .
|
|
|
Compromisos y/o normas ambientales simples
Apumayo no implementó cunetas y canales de coronación en tres (03) plataformas de perforación y en los accesos del proyecto de exploración minera “Sancos”, incumpliendo lo establecido en su instrumento de gestión ambiental
|
|
|
No contar con equipos o sistemas de tratamientos comprometidos en su IGA
Apumayo modificó la ubicación de tres (03) plataformas de perforación en más de cincuenta (50) metros de la ubicación establecida en su instrumento de gestión ambiental
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Manejo de efluentes
El efluente ubicado en la Poza de Subdrenaje del Botadero de Desmonte N° 1 no cuenta con un punto de control aprobado
|
|
|
Excesos de Límites Máximos Permisibles y/o ECAS
El titular minero habría superado los límites máximos permisibles en los parámetros sólidos totales en suspensión y arsénico total en el efluente identificado como ESP-1.
|
From OEFA's environmental infractions register (RUIAS), mining subsector, snapshot cut April 30, 2024. Fines are in UIT, Peru's yearly-revalued tax unit, as OEFA states them; a case can carry several infraction lines and a corrective measure instead of a fine.
| Date of death | Mining unit | Accident type (as classified) | Place | Category |
|---|---|---|---|---|
| Oct 24, 2012 | APURIMAC 41 | CAÍDAS DE PERSONAS | CHAVIÑA, LUCANAS, AYACUCHO | Gran y Mediana Minería |
One row per death from the Ministry of Energy and Mines' open-data list, naming the titleholder and mining unit. The file has no 2019 rows and only 11 for 2017-2018, an upstream gap; deaths after June 2021 are not in it.