RUC (tax ID) 20100539439· On record from Oct 24, 2008 to May 26, 2022
ⓘ
A resolution (resolución) is OSINERGMIN's formal written decision closing one sanction case: an order from the regulator, not a court judgment. A single resolution can fine several infractions at once, and it can be appealed to TASTEM, the agency's own appeals tribunal.ⓘ
S/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026).ⓘ
The UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles.No sanction resolution names this company in the 2020-2026 SAIP delivery.
Not on OSINERGMIN's published 2001-2019 sanctions list.
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Actividades, componentes y/o equipos no declarados
El administrado no construyó el canal y la poza de monitoreo para colectar y tratar las aguas de contacto proveniente del depósito de desmonte Oyama, incumpliendo lo establecido en su instrumento de gestión ambiental
|
29.60 |
|
Excesos de Límites Máximos Permisibles y/o ECAS
El administrado excedió los Límites Máximos Permisibles (LMP) en el punto de muestreo identificado como ESP-3, respecto a los parámetros zinc (Zn) total y hierro (Fe) disuelto
|
3.62 |
|
Manejo de efluentes
El administrado no derivó los efluentes de la bocamina Oyama mediante un canal de mampostería a los dos (2) pozas en serie (poza de sedimentación y poza de monitoreo) para su tratamiento antes de su descarga a la quebrada Chacchayoc, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
3.07 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Adopción de medidas de previsión y control ambiental
El titular minero no adoptó las medidas de prevención y control para evitar e impedir la acumulación de sedimentos en la zona de descarga del punto de control S-02, a la salida de la poza de sedimentación del sistema de tratamiento de agua de mina proveniente de la Bocamina Nivel 105.
corrective measure ordered
|
142.09 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Residuos Sólidos
Vinchos no almacenó los residuos peligrosos en forma separada del resto de los residuos, y el área de almacenamiento central no cumple con las condiciones previstas en la normativa vigente (piso impermeabilizado y señalización que indique la peligrosidad de los residuos).
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Eficacia de la fiscalización
Presunto incumplimiento de la Recomendación N° 1 de la Supervisión Especial 2012: “Se recomienda evaluar mediante un estudio Hidrogeológico el comportamiento de los niveles de agua del subsuelo y el impacto generado en los afloramientos de agua actualmente afectados; asimismo, informar sobre las medidas implementadas en relación a la recuperación de las áreas afectadas”.
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Actividades, componentes y/o equipos no declarados
El titular minero implementó tres (3) pozas sobre el suelo para la sedimentación del agua de mina proveniente de la bocamina Oyama y del drenaje del depósito de desmonte Oyama, que no se encontrarían contempladas en su instrumento de gestión ambiental.
corrective measure ordered
|
147.38 |
|
Actividades, componentes y/o equipos no declarados
El titular minero implementó pozas de sedimentación ubicadas en la microcuenca Mancancoto que no estarían tratando únicamente el agua proveniente de la bocamina del nivel 105, conforme a lo establecido en su instrumento de gestión ambiental.
corrective measure ordered
|
49.12 |
|
Excesos de Límites Máximos Permisibles y/o ECAS
El titular minero excedió los LMP en el punto de monitoreo ESP-8, respecto del parámetro Fe Disuelto.
corrective measure ordered
|
27.50 |
From OEFA's environmental infractions register (RUIAS), mining subsector, snapshot cut April 30, 2024. Fines are in UIT, Peru's yearly-revalued tax unit, as OEFA states them; a case can carry several infraction lines and a corrective measure instead of a fine.
| Date of death | Mining unit | Accident type (as classified) | Place | Category |
|---|---|---|---|---|
| Oct 24, 2008 | VINCHOS | CHOQUES CONTRA O ATRAPADO EN O GOLPES POR VEHÍCULO MOTORIZADO (TRÁNSITO) | PALLANCHACRA, PASCO, PASCO | Gran y Mediana Minería |
One row per death from the Ministry of Energy and Mines' open-data list, naming the titleholder and mining unit. The file has no 2019 rows and only 11 for 2017-2018, an upstream gap; deaths after June 2021 are not in it.