EE WAS INSTALLING 1/2 INCH PIPE UNDER THE THERMOPORCESS MACHINE. AFTER INSTALLING PIPE, HE BEGAN TO RISE AND FELT A SHARP PAIN IN HIS LOWER RIGHT BACK REGION.
Georgetown Plant Upper Supply Pond: 9 MSHA citations Coal
Georgetown Plant Upper Supply Pond has $983 in proposed MSHA penalties and $0 outstanding across 0 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Georgetown Plant Upper Supply Pond.
- Fatalities
- 0
- Total incidents
- 13
- Years on record
- 1983–1998
- Latest incident
- Jun 1998
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Georgetown Plant Upper Supply Pond has $983 in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.MSHA sampling at Georgetown Plant Upper Supply Pond shows 100% of 2 respirable coal dust samples met the 1.5 mg/m3 standard.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Respirable coal dust
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2016-06-08, 10 years ago
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.ⓘ
The excessive concentration value (ECV) is MSHA's own per-sample enforcement threshold, which builds in measurement uncertainty; a sample over its ECV can trigger a citation. The count covers only samples MSHA assigned an ECV.- ELECTRICIAN1
- MECHANIC1
- Consolidation Coal Company 1950 to 2013
- CONSOL Mining Company LLC 2013 to 2020
- Oasis TAG Holdings LLC 2020 to present
| Year | Employees |
|---|---|
| 2026 | 1 |
| 2025 | 1 |
| 2020 | 0 |
| 2019 | 0 |
| 2018 | 0 |
| 2017 | 0 |
| 2016 | 0 |
| 2015 | 0 |
| 2014 | 0 |
| 2013 | 0 |
| 2000 | 0 |
Georgetown Plant Upper Supply Pond sits in Harrison County, Ohio, where the Census mining category is 3.6% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 6 | 0 | 0 | 0.0 |
| 2025 Q4 | 6 | 0 | 0 | 0.0 |
| 2025 Q3 | 6 | 0 | 0 | 0.0 |
| 2025 Q2 | 7 | 2 | 0 | 285714.3 |
| 2025 Q1 | 6 | 1 | 0 | 166666.7 |
| 2020 Q3 | 0 | 0 | 0 | |
| 2020 Q2 | 0 | 0 | 0 | |
| 2020 Q1 | 0 | 0 | 0 |
Show 28 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2019 Q4 | 0 | 0 | 0 | |
| 2019 Q3 | 0 | 0 | 0 | |
| 2019 Q2 | 0 | 0 | 0 | |
| 2019 Q1 | 0 | 0 | 0 | |
| 2018 Q4 | 0 | 0 | 0 | |
| 2018 Q3 | 0 | 0 | 0 | |
| 2018 Q2 | 0 | 0 | 0 | |
| 2018 Q1 | 0 | 0 | 0 | |
| 2017 Q4 | 0 | 0 | 0 | |
| 2017 Q3 | 0 | 0 | 0 | |
| 2017 Q1 | 0 | 0 | 0 | |
| 2016 Q4 | 0 | 0 | 0 | |
| 2016 Q3 | 0 | 0 | 0 | |
| 2016 Q2 | 0 | 0 | 0 | |
| 2016 Q1 | 0 | 0 | 0 | |
| 2015 Q4 | 0 | 0 | 0 | |
| 2015 Q3 | 0 | 0 | 0 | |
| 2015 Q2 | 0 | 0 | 0 | |
| 2015 Q1 | 0 | 0 | 0 | |
| 2014 Q4 | 0 | 0 | 0 | |
| 2014 Q3 | 0 | 0 | 0 | |
| 2014 Q2 | 0 | 0 | 0 | |
| 2014 Q1 | 0 | 0 | 0 | |
| 2013 Q4 | 0 | 0 | 0 | |
| 2013 Q3 | 0 | 0 | 0 | |
| 2013 Q2 | 0 | 0 | 0 | |
| 2000 Q2 | 0 | 0 | 0 | |
| 2000 Q1 | 0 | 0 | 0 |
Reportable incidents
13 on file1998 · 1 incident
1989 · 1 incident
REPAIRING CHAIN HOIST ON ROLLING STEEL CURTAIN DOOR AND HAND GOT CAUGHT SEVERING THE ENDS OF TWO FINGERS.
1988 · 2 incidents
PULLING WASHDOWN HOSE TRAVELING BACKWARDS & TRIPPED OVER PALLET OF PIPE FITTINGS CAUSING PAIN TO LOWER LEFT SIDE OF BACK,LEFT HIPS,NUMBNESS LEFT LEG AND PAIN LEFT SHOULDER.HAPPENED IN BASEMENT FLOOR NORTH OF WELD SHOP.
WAS ON THE OAK PARK REAW COAL PILE;WAS DISMOUNTING 380 MICHIGAN RUBBERE TIRE DOZER(COMPANY #03-7910)WHEN HIS RIGHT FOOT SLIPPED OFF OF 2ND RUNG FROM BOTTOMCAUSING HIM TO FALL BACKWARDS TO GROU ND LANDING ON HIS BACK CAUSING INJURY TO RIGHT UPPER BACK AT RUB CAGE;RIGHT ELBOW AND ABCK OF SKULL.
1987 · 4 incidents
CHECKING 1'' X 1/4'' CHUTE TO #4 BOOM BELT,PIECE OF TIE WIRE TIED TO OVERHEAD WALKWAY.GOT CAUGHT BETWEEN RIGHT EYE AND SAFETY FGLASSES.
A MINE FIRE OCC6RRED ON THE NORTH & SOUTH SIDES OF THE OAK PARK COAL STOCK PILE EAST OF STACKER THE FIRE WAS A SPONTANEOUS COMBUSTION IGNITION-THE TIME OF THE IGNITION COULD NOT BE DETERMINED
INJ OCCURRED ON3THE SECOND FLOOR AT THE SHAKER AREA. I NAME PICKED UP HALF OF A SHAKER SCREEN TO DISPOSE OF IT IN THE JUNK BIN. AS HE THREW THE SCREEN IN THE JUNK BIN, HE RECIEVED A LACERAT TO THE PALM OF 2IS RT HAND FROM A SHARP EDGE THAT WAS ON THE SCREEN
MOVING PIECE OF3PLATE AND PINCHED HAND BETWEEN PLATE AND EDGE OF PIECE F PIPE
1986 · 2 incidents
FELL OFF OF A 14 INCH PIPE BY THE SECONDARY SHAKER AND LANDED ON THE FLOOR BELOW WHICH WAS 12 FT FROM THE PIPE TO THE FLOOR HURTING RT RIB CAGE AND RT LUNG ALSO ABRASIONS OF RT ELBOW AND CENTE R OF RT SHOULDE9 ON HIS BACK
PRESSURE RELEAS9 OCCURRED IN THERMAL DRYER SYSTEM. DAMAGE TO ONE EXPLOSION DOOR AND THE OTHER EXPLOSION DOORS ON TOP HEAD SEELS BROKEN. ONE STACK NEEDS REPAIRING.
1984 · 1 incident
LARGE ROCK SPLIT THE EDGE OF THE LINER ON THE PICKING TABLE. A LARGE ROCK WAS STUCK IN THE CRUSHER. HE REACHED FOR A STONE AND HIS LITTLE FINGER CAUGHT THE SPLIT EDGE OF THE LINER AND CAU LINER AND CAUSED A LACERATION .
1983 · 2 incidents
REMOVING OLD PUTTY FROM BROKEN WINDOW PANE LEFT HAND SLIPPED LACERATED LITTLE FINGER LEFT HAND ON GLASS REQUIRED (3) SUTURES
IGNITION OCCURED IN DUCT WORK CAUSING SMALL EXPOLOSION IN THERMAL DRYER,OF FROTH FLOTATION DRYER STRUCTURE.