Mining Incidents

MARSTON PIT: 76 MSHA citations Metal/Non-Metal

R.L. BRADSHER CONTRACTING INC. · Surface
55, Scotland County, NC  ·  Active
MSHA Mine ID: 3102052

MARSTON PIT has $11K in proposed MSHA penalties and $0 outstanding across 6 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at MARSTON PIT.

Fatalities
0
Total incidents
0
Years on record
Latest incident
Compliance record
MSHA citations since 2000
76
citations
21
significant & substantial
$10,981
proposed penalties
$10,981
paid to date
100% of proposed penalties paid to date, a $0 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
78
inspections on record
724
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 724 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

MARSTON PIT has $11K in proposed MSHA penalties and $0 outstanding across 6 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$11K
proposed penalties
$11K
current assessed
$11K
paid to date
$0
outstanding
76 assessments are final orders; 6 contested dockets.
Of $4K in penalties contested before the Commission, $4K was upheld in final decisions.
As of the most recent assessment on 2024-10-30.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
27.6%
significant & substantial
13.2%
high negligence or reckless
27.6%
reasonably likely or greater
63.2%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 3.9% low, 82.9% moderate, 13.2% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
7 citations taken to the federal commission · 9% of citations on record
  • Settled 4 · 57%
  • Stood as issued 2 · 29%
  • Vacated or withdrawn 1 · 14%
75%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 4 decided S&S contests · industry: 79%
26%
Penalty reduction in decided contests
$5K proposed, $3K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2013-08-07.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
SE 2012-604M Settlement Feldman 2014 $2K → $2K
SE 2008-337M Dismissal Lesnick 2010 $973 → $973
SE 2009-179M Settlement 2010 $243 → $243
SE 20000084M Settlement Barbour 2000 $173 → $173
SE 2008-338M Settlement Lesnick 2009 $100 → $100
SE 2011-511M Settlement Melick 2011 $100 → $100
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2024-09-25
0%
of limit-tested samples over the exposure limit
14
samples
1
limit-tested
Most sampled contaminants
  • Respirable dust, <.1mg13
  • Quartz, respirable, >1% Qtz1
Show the individual readings (14)
Date Contaminant Concentration Limit Conc / limit Occupation
2024-09-25 Respirable dust, <.1mg 0 Front-end Loader Operator
2024-09-25 Respirable dust, <.1mg 0 Utility Man
2024-09-25 Respirable dust, <.1mg 0 Front-end Loader Operator
2023-09-27 Respirable dust, <.1mg 0 Front-end Loader Operator
2023-09-27 Respirable dust, <.1mg 0 Backhoe Operator
2022-03-10 Respirable dust, <.1mg 0 Front-end Loader Operator
2022-03-10 Respirable dust, <.1mg 0 Utility Man
2019-01-15 Respirable dust, <.1mg 0 Front-end Loader Operator
2018-06-06 Respirable dust, <.1mg 0 Supervisor, Co. Official
2013-05-21 Respirable dust, <.1mg 0 Front-end Loader Operator
2011-02-17 Respirable dust, <.1mg 0 Front-end Loader Operator
2010-05-27 Respirable dust, <.1mg 0 Front-end Loader Operator
2005-04-13 Quartz, respirable, >1% Qtz 0.17 1.12 0.15 Washer Operator
2001-12-13 Respirable dust, <.1mg 0 Supervisor, Co. Official
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. J Morgan Enterprises 1990 to 2019
  2. R.L. BRADSHER CONTRACTING INC. 2019 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2026 4
2025 4
2024 3
2023 3
2022 2
2021 2
2020 2
2019 2
2018 2
2017 2
2016 2
2015 2
2014 2
2013 2
2012 2
2011 2
2010 2
2009 2
2008 2
2007 2
2006 3
2005 3
2004 3
2003 2
2002 2
2001 3
2000 3
Source: MSHA quarterly employment and production, updated weekly.

MARSTON PIT sits in Scotland County, North Carolina, where the Census mining category is 0.0% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Scotland County, North Carolina · Population 34,353
0.0%
Mining share of county employment
$43,500
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2026 Q2 1,914 0 0 0.0
2026 Q1 1,746 0 0 0.0
2025 Q4 1,665 0 0 0.0
2025 Q3 1,842 0 0 0.0
2025 Q2 1,892 0 0 0.0
2025 Q1 1,618 0 0 0.0
2024 Q4 1,488 1 0 672.0
2024 Q3 1,144 0 0 0.0
Show 98 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2024 Q2 1,320 2 0 1515.2
2024 Q1 1,132 0 0 0.0
2023 Q4 1,263 0 0 0.0
2023 Q3 1,340 0 0 0.0
2023 Q2 1,371 1 0 729.4
2023 Q1 905 0 0 0.0
2022 Q4 785 3 0 3821.7
2022 Q3 1,072 0 0 0.0
2022 Q2 1,008 0 0 0.0
2022 Q1 1,042 2 1 1919.4
2021 Q4 858 0 0 0.0
2021 Q3 1,035 0 0 0.0
2021 Q2 1,249 0 0 0.0
2021 Q1 1,034 0 0 0.0
2020 Q4 837 0 0 0.0
2020 Q3 840 0 0 0.0
2020 Q2 526 1 0 1901.1
2020 Q1 634 3 1 4731.9
2019 Q4 326 0 0 0.0
2019 Q3 1,040 0 0 0.0
2019 Q2 1,040 0 0 0.0
2019 Q1 1,040 1 0 961.5
2018 Q4 1,040 0 0 0.0
2018 Q3 1,040 0 0 0.0
2018 Q2 1,040 1 1 961.5
2018 Q1 888 0 0 0.0
2017 Q4 816 1 0 1225.5
2017 Q3 1,080 0 0 0.0
2017 Q2 1,080 0 0 0.0
2017 Q1 1,080 0 0 0.0
2016 Q4 760 0 0 0.0
2016 Q3 1,040 0 0 0.0
2016 Q2 1,040 0 0 0.0
2016 Q1 720 0 0 0.0
2015 Q4 920 1 0 1087.0
2015 Q3 1,040 0 0 0.0
2015 Q2 1,040 1 0 961.5
2015 Q1 640 0 0 0.0
2014 Q4 920 1 0 1087.0
2014 Q3 1,040 1 0 961.5
2014 Q2 1,040 0 0 0.0
2014 Q1 1,040 0 0 0.0
2013 Q4 920 1 0 1087.0
2013 Q3 1,040 0 0 0.0
2013 Q2 1,040 0 0 0.0
2013 Q1 640 2 0 3125.0
2012 Q4 520 0 0 0.0
2012 Q3 1,040 0 0 0.0
2012 Q2 1,040 1 1 961.5
2012 Q1 1,040 0 0 0.0
2011 Q4 800 8 3 10000.0
2011 Q3 760 0 0 0.0
2011 Q2 760 0 0 0.0
2011 Q1 760 2 0 2631.6
2010 Q4 672 0 0 0.0
2010 Q3 808 0 0 0.0
2010 Q2 960 0 0 0.0
2010 Q1 736 1 0 1358.7
2009 Q4 568 0 0 0.0
2009 Q3 752 0 0 0.0
2009 Q2 1,040 0 0 0.0
2009 Q1 1,040 0 0 0.0
2008 Q4 1,040 1 1 961.5
2008 Q3 1,040 0 0 0.0
2008 Q2 1,040 0 0 0.0
2008 Q1 1,040 1 0 961.5
2007 Q4 1,040 3 1 2884.6
2007 Q3 1,040 0 0 0.0
2007 Q2 1,016 0 0 0.0
2007 Q1 1,390 2 1 1438.8
2006 Q4 1,587 0 0 0.0
2006 Q3 1,525 1 1 655.7
2006 Q2 2,075 0 0 0.0
2006 Q1 1,570 0 0 0.0
2005 Q4 1,475 15 2 10169.5
2005 Q3 1,529 0 0 0.0
2005 Q2 1,510 0 0 0.0
2005 Q1 1,315 0 0 0.0
2004 Q4 1,424 0 0 0.0
2004 Q3 1,190 0 0 0.0
2004 Q2 1,375 0 0 0.0
2004 Q1 650 0 0 0.0
2003 Q4 650 1 0 1538.5
2003 Q3 650 0 0 0.0
2003 Q2 650 0 0 0.0
2003 Q1 650 1 1 1538.5
2002 Q4 650 0 0 0.0
2002 Q3 690 0 0 0.0
2002 Q2 650 0 0 0.0
2002 Q1 610 0 0 0.0
2001 Q4 730 0 0 0.0
2001 Q3 1,150 0 0 0.0
2001 Q2 1,234 0 0 0.0
2001 Q1 1,221 2 1 1638.0
2000 Q4 1,169 6 2 5132.6
2000 Q3 1,204 0 0 0.0
2000 Q2 1,094 5 1 4570.4
2000 Q1 994 0 0 0.0

No reportable incidents on file.

MSHA has no recorded reportable accidents for this mine in the current dataset. New reports appear here within a week of being filed.