Superintendent locked out and tagged out the crusher run belt to remove a blockage of material which had stopped the belt. The belt was cut on and off more than once during the process and the v-belts were replaced on the motor. The superintendent failed to disengage the starter switch during the last LOTO and their thumb was smashed in the v-belt.
MARTIN MARIETTA - RICH PATCH QUARRY: 46 MSHA citations Metal/Non-Metal
MARTIN MARIETTA - RICH PATCH QUARRY has $7K in proposed MSHA penalties and $55 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at MARTIN MARIETTA - RICH PATCH QUARRY.
- Fatalities
- 0
- Total incidents
- 10
- Years on record
- 1997–2018
- Latest incident
- Oct 2018
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.MARTIN MARIETTA - RICH PATCH QUARRY has $7K in proposed MSHA penalties and $55 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 1 · 100%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| VA 2010-287M | Settlement | Koutras | 2010 | $108 → $100 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2026-07-28
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Respirable dust, <.1mg23
- Quartz, respirable, >1% Qtz6
- Nuisance dust, respirable, <1% Qtz2
Show the individual readings (31)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2026-07-28 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2026-07-28 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2026-07-28 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2025-07-16 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2025-07-16 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2025-07-16 | Quartz, respirable, >1% Qtz | 0.19 | Utility Man | ||
| 2025-07-16 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2023-08-22 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2023-08-22 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2023-08-22 | Nuisance dust, respirable, <1% Qtz | 0.18 | 10 | 0.02 | Utility Man |
| 2022-05-23 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2022-05-23 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2022-05-23 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2022-05-23 | Nuisance dust, respirable, <1% Qtz | 0.19 | 10 | 0.02 | Lab Technician |
| 2019-05-29 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2019-05-29 | Respirable dust, <.1mg | 0 | Dry Screen Plant Operator | ||
| 2019-05-29 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2015-12-17 | Respirable dust, <.1mg | 0 | Mechanic | ||
| 2015-12-17 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2015-12-17 | Respirable dust, <.1mg | 0 | Mechanic | ||
| 2010-06-30 | Quartz, respirable, >1% Qtz | 0.43 | 1.87 | 0.23 | Front-end Loader Operator |
| 2010-06-30 | Quartz, respirable, >1% Qtz | 0.64 | 2.07 | 0.31 | Crusher Oper/Worker |
| 2004-12-02 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2003-10-22 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2003-10-22 | Respirable dust, <.1mg | 0 | Scale Man | ||
| 2003-10-22 | Quartz, respirable, >1% Qtz | 0.15 | 1.47 | 0.10 | Front-end Loader Operator |
| 2003-10-22 | Quartz, respirable, >1% Qtz | 0.26 | 1.49 | 0.17 | Crusher Oper/Worker |
| 2003-04-09 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2003-04-09 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2003-04-09 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2003-04-09 | Quartz, respirable, >1% Qtz | 0.16 | 1.28 | 0.13 | Crusher Oper/Worker |
MARTIN MARIETTA - RICH PATCH QUARRY recorded 9.74 reportable injury cases per 100 full-time workers in 2000.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.- Vulcan Constr. Materials, L.P. 1997 to 2002
- Boxley Materials Company 2002 to 2026
- Martin Marietta Materials, Inc. 2026 to present
| Year | Employees |
|---|---|
| 2026 | 6 |
| 2025 | 5 |
| 2024 | 6 |
| 2023 | 6 |
| 2022 | 5 |
| 2021 | 6 |
| 2020 | 6 |
| 2019 | 7 |
| 2018 | 7 |
| 2017 | 7 |
| 2016 | 6 |
| 2015 | 6 |
| 2014 | 6 |
| 2013 | 6 |
| 2012 | 6 |
| 2011 | 6 |
| 2010 | 7 |
| 2009 | 7 |
| 2008 | 9 |
| 2007 | 8 |
| 2006 | 6 |
| 2005 | 5 |
| 2004 | 5 |
| 2003 | 8 |
| 2002 | 8 |
| 2001 | 7 |
| 2000 | 9 |
MARTIN MARIETTA - RICH PATCH QUARRY sits in Alleghany County, Virginia, where the Census mining category is 0.2% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 2,332 | 0 | 0 | 0.0 |
| 2026 Q1 | 667 | 0 | 0 | 0.0 |
| 2025 Q4 | 2,698 | 0 | 0 | 0.0 |
| 2025 Q3 | 3,018 | 0 | 0 | 0.0 |
| 2025 Q2 | 3,351 | 0 | 0 | 0.0 |
| 2025 Q1 | 1,982 | 0 | 0 | 0.0 |
| 2024 Q4 | 3,015 | 0 | 0 | 0.0 |
| 2024 Q3 | 2,703 | 0 | 0 | 0.0 |
Show 98 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 2,722 | 0 | 0 | 0.0 |
| 2024 Q1 | 2,455 | 0 | 0 | 0.0 |
| 2023 Q4 | 2,985 | 0 | 0 | 0.0 |
| 2023 Q3 | 3,053 | 0 | 0 | 0.0 |
| 2023 Q2 | 3,016 | 1 | 0 | 331.6 |
| 2023 Q1 | 2,359 | 0 | 0 | 0.0 |
| 2022 Q4 | 2,487 | 0 | 0 | 0.0 |
| 2022 Q3 | 2,843 | 0 | 0 | 0.0 |
| 2022 Q2 | 3,071 | 1 | 0 | 325.6 |
| 2022 Q1 | 2,127 | 0 | 0 | 0.0 |
| 2021 Q4 | 3,285 | 0 | 0 | 0.0 |
| 2021 Q3 | 3,160 | 0 | 0 | 0.0 |
| 2021 Q2 | 3,005 | 0 | 0 | 0.0 |
| 2021 Q1 | 3,209 | 0 | 0 | 0.0 |
| 2020 Q4 | 3,522 | 0 | 0 | 0.0 |
| 2020 Q3 | 3,587 | 0 | 0 | 0.0 |
| 2020 Q2 | 3,513 | 0 | 0 | 0.0 |
| 2020 Q1 | 1,966 | 0 | 0 | 0.0 |
| 2019 Q4 | 2,821 | 1 | 0 | 354.5 |
| 2019 Q3 | 3,147 | 0 | 0 | 0.0 |
| 2019 Q2 | 3,167 | 0 | 0 | 0.0 |
| 2019 Q1 | 3,689 | 1 | 1 | 271.1 |
| 2018 Q4 | 4,019 | 0 | 0 | 0.0 |
| 2018 Q3 | 4,456 | 0 | 0 | 0.0 |
| 2018 Q2 | 4,057 | 0 | 0 | 0.0 |
| 2018 Q1 | 3,826 | 0 | 0 | 0.0 |
| 2017 Q4 | 3,588 | 0 | 0 | 0.0 |
| 2017 Q3 | 3,954 | 0 | 0 | 0.0 |
| 2017 Q2 | 4,016 | 0 | 0 | 0.0 |
| 2017 Q1 | 3,911 | 3 | 0 | 767.1 |
| 2016 Q4 | 2,937 | 0 | 0 | 0.0 |
| 2016 Q3 | 3,639 | 1 | 0 | 274.8 |
| 2016 Q2 | 3,738 | 0 | 0 | 0.0 |
| 2016 Q1 | 3,184 | 0 | 0 | 0.0 |
| 2015 Q4 | 3,201 | 1 | 0 | 312.4 |
| 2015 Q3 | 3,156 | 1 | 0 | 316.9 |
| 2015 Q2 | 3,129 | 0 | 0 | 0.0 |
| 2015 Q1 | 2,535 | 0 | 0 | 0.0 |
| 2014 Q4 | 2,992 | 0 | 0 | 0.0 |
| 2014 Q3 | 3,660 | 1 | 0 | 273.2 |
| 2014 Q2 | 1,158 | 0 | 0 | 0.0 |
| 2014 Q1 | 3,179 | 2 | 0 | 629.1 |
| 2013 Q4 | 2,697 | 0 | 0 | 0.0 |
| 2013 Q3 | 3,054 | 2 | 2 | 654.9 |
| 2013 Q2 | 3,257 | 0 | 0 | 0.0 |
| 2013 Q1 | 3,338 | 0 | 0 | 0.0 |
| 2012 Q4 | 2,421 | 0 | 0 | 0.0 |
| 2012 Q3 | 3,012 | 0 | 0 | 0.0 |
| 2012 Q2 | 3,189 | 1 | 0 | 313.6 |
| 2012 Q1 | 2,818 | 0 | 0 | 0.0 |
| 2011 Q4 | 2,891 | 1 | 0 | 345.9 |
| 2011 Q3 | 3,139 | 2 | 0 | 637.1 |
| 2011 Q2 | 3,061 | 0 | 0 | 0.0 |
| 2011 Q1 | 1,622 | 0 | 0 | 0.0 |
| 2010 Q4 | 3,129 | 1 | 0 | 319.6 |
| 2010 Q3 | 3,407 | 0 | 0 | 0.0 |
| 2010 Q2 | 2,883 | 0 | 0 | 0.0 |
| 2010 Q1 | 2,181 | 1 | 1 | 458.5 |
| 2009 Q4 | 2,148 | 0 | 0 | 0.0 |
| 2009 Q3 | 2,723 | 0 | 0 | 0.0 |
| 2009 Q2 | 2,999 | 0 | 0 | 0.0 |
| 2009 Q1 | 3,032 | 0 | 0 | 0.0 |
| 2008 Q4 | 3,476 | 0 | 0 | 0.0 |
| 2008 Q3 | 3,895 | 0 | 0 | 0.0 |
| 2008 Q2 | 4,052 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,766 | 1 | 0 | 265.5 |
| 2007 Q4 | 3,478 | 0 | 0 | 0.0 |
| 2007 Q3 | 3,820 | 0 | 0 | 0.0 |
| 2007 Q2 | 4,291 | 0 | 0 | 0.0 |
| 2007 Q1 | 3,484 | 1 | 0 | 287.0 |
| 2006 Q4 | 4,083 | 0 | 0 | 0.0 |
| 2006 Q3 | 3,109 | 1 | 0 | 321.6 |
| 2006 Q2 | 3,427 | 0 | 0 | 0.0 |
| 2006 Q1 | 4,273 | 1 | 0 | 234.0 |
| 2005 Q4 | 2,696 | 0 | 0 | 0.0 |
| 2005 Q3 | 3,582 | 0 | 0 | 0.0 |
| 2005 Q2 | 3,710 | 0 | 0 | 0.0 |
| 2005 Q1 | 2,600 | 0 | 0 | 0.0 |
| 2004 Q4 | 3,608 | 0 | 0 | 0.0 |
| 2004 Q3 | 2,530 | 0 | 0 | 0.0 |
| 2004 Q2 | 2,656 | 0 | 0 | 0.0 |
| 2004 Q1 | 1,981 | 0 | 0 | 0.0 |
| 2003 Q4 | 3,271 | 1 | 0 | 305.7 |
| 2003 Q3 | 3,019 | 0 | 0 | 0.0 |
| 2003 Q2 | 3,847 | 1 | 0 | 259.9 |
| 2003 Q1 | 1,875 | 0 | 0 | 0.0 |
| 2002 Q4 | 3,224 | 0 | 0 | 0.0 |
| 2002 Q3 | 3,520 | 2 | 1 | 568.2 |
| 2002 Q2 | 2,062 | 0 | 0 | 0.0 |
| 2002 Q1 | 4,636 | 0 | 0 | 0.0 |
| 2001 Q4 | 2,908 | 4 | 0 | 1375.5 |
| 2001 Q3 | 3,459 | 1 | 0 | 289.1 |
| 2001 Q2 | 5,218 | 0 | 0 | 0.0 |
| 2001 Q1 | 1,606 | 2 | 2 | 1245.3 |
| 2000 Q4 | 4,442 | 0 | 0 | 0.0 |
| 2000 Q3 | 6,050 | 2 | 1 | 330.6 |
| 2000 Q2 | 6,149 | 2 | 1 | 325.3 |
| 2000 Q1 | 3,886 | 0 | 0 | 0.0 |
Reportable incidents
10 on file2018 · 1 incident
2017 · 1 incident
Miner was helping to change the attachment on the excavator from a hammer to a bucket. As the miner tried to loosen the nut with a wrench, EE propped foot on the attachment for leverage. When the nut broke loose, the miner fell to the ground, landing on EE's elbow. The miner suffered a dislocated elbow.
2016 · 1 incident
Taping a blast hole, reached down to grab EE's tape measure, felt a pop in EE's back.
2003 · 1 incident
THE YARD LOADER OPERATOR WAS LOADING A HAUL TRUCK IN STOCKPILE AREA. WHILE LOADING, A CONTRACTOR PULLED HIS TRUCK BEHIND LOADER. LOADER OPERATOR BACKED AWAY FROM HAUL TRUCK TO GO FOR ANOTHER B UCKET W/O SEEING THE CONTRACTOR. WHEN HE DID SEE THE CONTRACTOR IN HIS MIRROR, HE SLAMMED ON HIS BRAKES TO AVOID HITTING THE CONTRACT TRUCK. HE STRAINED & PULLED HIS BACK MUSCLE FROM THE STOP
2002 · 1 incident
EE WAS GETTING OFF OF LINKBELT ROCKBREAKER WHEN FOOT CAUGHT IN TRACK.
2000 · 1 incident
WHILE DISMOUNTING THE LADDER ON THE WTER TRUCK EMPLOYEE'S FOOT SLIPPED ON THE RUNG CAUSING HIM TO LOOSE HIS GRIP AND FALL TO THE GROUND LEVEL.
1999 · 1 incident
EMPLOYEE WAS MANUALLY TRYING TO DISLODGE ROCK WHEN BARS SLIPPED AND MASHED FINGER.
1998 · 2 incidents
USING UTILITY KNIFE TO CUT BELTING, SLIPPED AND CUT KNEE AREA. 3 STITCHES.
CHECKING ELECTRICAL STARTERS WITH MULTIMETER.
1997 · 1 incident
WHILE PERFORMING REPAIR TO ADJUST CONNECTING PIN FOR BUCKET ON KOMATSU 300, THE PIN WAS REMOVED AND ASSISTING EMPLOYEE. THE OTHER EMPLOYEE WAS AUNABLE TO HOLD HEAVY HINGE CONNECTION WHICH ROLL ED AND STRUCK\PINCHED THE INJURED EMPLOYEE'S RIGHT FOOT AND ANKLE CAUSING SEVERE ABRASIONS\CONTUSIONS REQUIRING ER VISIT FOR STITCHES.