Hauler driver of semi-dump unit dumping limestone onto ground at processing plant. Semi-dump unit rolled onto its side.
Petersburg Mine: 368 MSHA citations Metal/Non-Metal
Petersburg Mine has $132K in proposed MSHA penalties and $200 outstanding across 3 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Petersburg Mine.
- Fatalities
- 0
- Total incidents
- 8
- Years on record
- 2000–2017
- Latest incident
- Nov 2017
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.Petersburg Mine has $132K in proposed MSHA penalties and $200 outstanding across 3 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 17 · 89%
- Vacated or withdrawn 2 · 11%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| LAKE 2011-994 | Settlement | Paez | 2012 | $4K → $2K |
| LAKE 2016-0378 | Settlement | Lesnick | 2016 | $2K → $2K |
| LAKE 2014-0371 | Withdrawal | Andrews | 2014 | $150 → $0 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2018-12-06, 7 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- TC as EC @ 3501914 over
- TCarbon @ 3501914 over
- Diesel particulate (total carbon)275 over
- Diesel Particulate Material33 over
Show the individual readings (100)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2008-11-25 | TC @ 160 | 161 | 160 | 1.01 | Scaling (mechanical) |
| 2008-10-15 | TC as EC @ 350 | 504.67 | 350 | 1.44 | Cleanup Man |
| 2008-10-15 | TC @ 160 | 320 | 160 | 2.00 | Scaling (mechanical) |
| 2008-10-15 | TCarbon @ 350 | 492.65 | 350 | 1.41 | Cleanup Man |
| 2008-10-15 | EC @ 160 | 252 | 160 | 1.58 | Scaling (mechanical) |
| 2008-08-27 | TC as EC @ 350 | 351 | 350 | 1.00 | Blaster, Powder Gang |
| 2008-08-27 | TC as EC @ 350 | 479 | 350 | 1.37 | Cleanup Man |
| 2008-08-27 | EC @ 160 | 250 | 160 | 1.56 | Scaling (mechanical) |
| 2008-08-27 | TC @ 160 | 334 | 160 | 2.09 | Scaling (mechanical) |
| 2008-08-27 | TCarbon @ 350 | 355 | 350 | 1.01 | Blaster, Powder Gang |
| 2008-08-27 | TCarbon @ 350 | 489 | 350 | 1.40 | Cleanup Man |
| 2008-08-06 | TCarbon @ 350 | 460.13 | 350 | 1.31 | Blaster, Powder Gang |
| 2008-08-06 | TCarbon @ 350 | 403.97 | 350 | 1.15 | Cleanup Man |
| 2008-08-06 | TC as EC @ 350 | 393.23 | 350 | 1.12 | Blaster, Powder Gang |
| 2008-08-06 | TC @ 160 | 356 | 160 | 2.23 | Scaling (mechanical) |
| 2008-08-06 | TC as EC @ 350 | 415.01 | 350 | 1.19 | Cleanup Man |
| 2008-08-06 | EC @ 160 | 267 | 160 | 1.67 | Scaling (mechanical) |
| 2008-06-18 | TCarbon @ 350 | 516.29 | 350 | 1.48 | Cleanup Man |
| 2008-06-18 | TC as EC @ 350 | 516.2 | 350 | 1.47 | Cleanup Man |
| 2008-06-18 | TCarbon @ 350 | 706.46 | 350 | 2.02 | Blaster, Powder Gang |
| 2008-06-18 | TCarbon @ 350 | 746.85 | 350 | 2.13 | Blaster, Powder Gang |
| 2008-06-18 | EC @ 160 | 725 | 160 | 4.53 | Scaling (mechanical) |
| 2008-06-18 | TC as EC @ 350 | 787.74 | 350 | 2.25 | Blaster, Powder Gang |
| 2008-06-18 | TC as EC @ 350 | 726.26 | 350 | 2.08 | Blaster, Powder Gang |
| 2008-06-18 | TC @ 160 | 844 | 160 | 5.28 | Scaling (mechanical) |
| 2008-04-23 | TC as EC @ 350 | 708.33 | 350 | 2.02 | Blaster, Powder Gang |
| 2008-04-23 | TC as EC @ 350 | 728.82 | 350 | 2.08 | Blaster, Powder Gang |
| 2008-04-23 | TCarbon @ 350 | 801.04 | 350 | 2.29 | Blaster, Powder Gang |
| 2008-04-23 | TC as EC @ 350 | 929.92 | 350 | 2.66 | Cleanup Man |
| 2008-04-23 | TCarbon @ 350 | 738.97 | 350 | 2.11 | Roof Bolter, Rock |
| 2008-04-23 | TC as EC @ 350 | 676.31 | 350 | 1.93 | Roof Bolter, Rock |
| 2008-04-23 | TCarbon @ 350 | 620.74 | 350 | 1.77 | Drill Operator, Jumbo Perc. |
| 2008-04-23 | TCarbon @ 350 | 1029.63 | 350 | 2.94 | Cleanup Man |
| 2008-04-23 | TC as EC @ 350 | 543.09 | 350 | 1.55 | Drill Operator, Jumbo Perc. |
| 2008-04-23 | TCarbon @ 350 | 804 | 350 | 2.30 | Blaster, Powder Gang |
| 2007-01-30 | TCarbon @ 350 | 639.26 | 350 | 1.83 | Blaster, Powder Gang |
| 2007-01-30 | TC as EC @ 350 | 575.88 | 350 | 1.65 | Blaster, Powder Gang |
| 2006-10-25 | Diesel Particulate Material | 533.44 | 308 | 1.73 | Blaster, Powder Gang |
| 2006-07-12 | Diesel Particulate Material | 707.54 | 308 | 2.30 | Blaster, Powder Gang |
| 2006-05-24 | Diesel Particulate Material | 423.97 | 308 | 1.38 | Blaster, Powder Gang |
| 2005-03-02 | Total Carbon,calculated from elemental carbon. | 434.48 | 400 | 1.09 | Blaster, Powder Gang |
| 2004-12-16 | Total Carbon,TC | 590.49 | 400 | 1.48 | Blaster, Powder Gang |
| 2004-12-16 | Total Carbon,calculated from elemental carbon. | 519.01 | 400 | 1.30 | Blaster, Powder Gang |
| 2002-06-19 | Quartz, respirable, >1% Qtz | 2.28 | 1.58 | 1.44 | Front-end Loader Operator |
| 2018-12-06 | Respirable dust, <.1mg | 0 | Bulldozer Operator | ||
| 2018-12-06 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2018-12-06 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2018-12-06 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2016-01-10 | Quartz, respirable, >1% Qtz | 0.38 | 2.04 | 0.19 | Front-end Loader Operator |
| 2016-01-10 | Quartz, respirable, >1% Qtz | 0.16 | 1.41 | 0.11 | Front-end Loader Operator |
| 2015-11-09 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2015-11-09 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2015-11-09 | EC @ 160 | 111 | 160 | 0.69 | Blaster, Powder Gang |
| 2015-11-09 | TC @ 160 | 90 | 160 | 0.56 | Roof Bolter, Mounted |
| 2015-11-09 | TC @ 160 | 138 | 160 | 0.86 | Blaster, Powder Gang |
| 2015-11-09 | EC @ 160 | 60 | 160 | 0.38 | Roof Bolter, Mounted |
| 2015-08-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2015-08-04 | EC @ 160 | 19 | 160 | 0.12 | Scaling (mechanical) |
| 2015-08-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Blaster, Powder Gang |
| 2015-08-04 | TC @ 160 | 25 | 160 | 0.16 | Utility Man |
| 2015-08-04 | EC @ 160 | 21 | 160 | 0.13 | Utility Man |
| 2015-08-04 | TC @ 160 | 62 | 160 | 0.39 | Scaling (mechanical) |
| 2015-08-04 | EC @ 160 | 28 | 160 | 0.18 | Roof Bolter, Mounted |
| 2015-08-04 | TC @ 160 | 40 | 160 | 0.25 | Roof Bolter, Mounted |
| 2015-08-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Utility Man |
| 2015-08-04 | EC @ 160 | 83 | 160 | 0.52 | Blaster, Powder Gang |
| 2015-08-04 | TC @ 160 | 115 | 160 | 0.72 | Blaster, Powder Gang |
| 2015-08-04 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2014-02-05 | TC @ 160 | 5 | 160 | 0.03 | Mechanic |
| 2014-02-05 | EC @ 160 | 2 | 160 | 0.01 | Mechanic |
| 2014-02-05 | TC @ 160 | 4 | 160 | 0.03 | Supervisor, Co. Official |
| 2014-02-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Mechanic |
| 2014-02-05 | TC from EC @ 160 | 0 | 160 | 0.00 | Supervisor, Co. Official |
| 2014-02-05 | EC @ 160 | 2 | 160 | 0.01 | Supervisor, Co. Official |
| 2013-04-24 | Respirable dust, <.1mg | 0 | Drill Operator, Rotary Air | ||
| 2013-04-24 | Respirable dust, <.1mg | 0 | Drill Helper | ||
| 2013-01-15 | Lead fumes | 0 | 450 | 0.00 | Welder, etc. |
| 2013-01-15 | Copper fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2013-01-15 | Molybdenum fumes | 0 | 10 | 0.00 | Welder, etc. |
| 2013-01-15 | Magnesium oxide fumes | 0.12 | 20 | 0.01 | Welder, etc. |
| 2013-01-15 | Cobalt fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2013-01-15 | Iron oxide fumes | 0.06 | 10 | 0.01 | Welder, etc. |
| 2013-01-15 | Nickel fumes | 0 | 1 | 0.00 | Welder, etc. |
| 2013-01-15 | Copper fumes | 0 | 300 | 0.00 | Welder, etc. |
| 2013-01-15 | Manganese fumes | 0.1 | 5 | 0.02 | Welder, etc. |
| 2013-01-15 | Magnesium oxide fumes | 0.1 | 20 | 0.01 | Welder, etc. |
| 2013-01-15 | Nickel fumes | 0 | 3 | 0.00 | Welder, etc. |
| 2013-01-15 | Manganese fumes | 0.11 | 5 | 0.02 | Welder, etc. |
| 2013-01-15 | Iron oxide fumes | 0.7 | 20 | 0.04 | Welder, etc. |
| 2013-01-15 | Chromium, insoluble | 0 | 1 | 0.00 | Welder, etc. |
| 2013-01-15 | Lead fumes | 0 | 150 | 0.00 | Welder, etc. |
| 2013-01-15 | Vanadium fumes | 0 | 50 | 0.00 | Welder, etc. |
| 2013-01-15 | Beryllium fumes | 0 | 6 | 0.00 | Welder, etc. |
| 2013-01-15 | Cadmium oxide fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2013-01-15 | Arsenic fumes | 0 | 1500 | 0.00 | Welder, etc. |
| 2013-01-15 | Lead fumes | 0 | 450 | 0.00 | Welder, etc. |
| 2013-01-15 | Chromium, insoluble | 0 | 3 | 0.00 | Welder, etc. |
| 2013-01-15 | Molybdenum fumes | 0 | 20 | 0.00 | Welder, etc. |
| 2013-01-15 | Cobalt fumes | 0 | 300 | 0.00 | Welder, etc. |
| 2013-01-15 | Molybdenum fumes | 0 | 20 | 0.00 | Welder, etc. |
Petersburg Mine recorded 0.00 reportable injury cases per 100 full-time workers in 2019.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2019 * | 0.00 | 0.00 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
| 2017 * | 0.00 | 0.00 | 0.000 |
| 2016 * | 0.00 | 0.00 | 0.000 |
| 2015 * | 0.00 | 0.00 | 0.000 |
| 2014 * | 0.00 | 0.00 | 0.000 |
| 2013 * | 0.00 | 0.00 | 0.000 |
| 2012 * | 0.00 | 0.00 | 0.000 |
- East Fairfield Coal Co. - Limestone Division 2000 to present
| Year | Employees |
|---|---|
| 2019 | 21 |
| 2018 | 35 |
| 2017 | 33 |
| 2016 | 33 |
| 2015 | 31 |
| 2014 | 27 |
| 2013 | 27 |
| 2012 | 30 |
| 2011 | 19 |
| 2010 | 4 |
| 2009 | 3 |
| 2008 | 12 |
| 2007 | 16 |
| 2006 | 17 |
| 2005 | 15 |
| 2004 | 12 |
| 2003 | 12 |
| 2002 | 11 |
| 2001 | 7 |
| 2000 | 4 |
Petersburg Mine sits in Mahoning County, Ohio, where the Census mining category is 0.1% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2019 Q4 | 3,473 | 0 | 0 | 0.0 |
| 2019 Q3 | 11,029 | 0 | 0 | 0.0 |
| 2019 Q2 | 18,667 | 3 | 1 | 160.7 |
| 2019 Q1 | 16,712 | 0 | 0 | 0.0 |
| 2018 Q4 | 22,962 | 10 | 2 | 435.5 |
| 2018 Q3 | 18,668 | 7 | 0 | 375.0 |
| 2018 Q2 | 22,350 | 19 | 7 | 850.1 |
| 2018 Q1 | 17,790 | 0 | 0 | 0.0 |
Show 71 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2017 Q4 | 22,398 | 0 | 0 | 0.0 |
| 2017 Q3 | 19,559 | 0 | 0 | 0.0 |
| 2017 Q2 | 22,172 | 0 | 0 | 0.0 |
| 2017 Q1 | 11,348 | 4 | 0 | 352.5 |
| 2016 Q4 | 13,257 | 0 | 0 | 0.0 |
| 2016 Q3 | 20,773 | 1 | 1 | 48.1 |
| 2016 Q2 | 23,484 | 10 | 4 | 425.8 |
| 2016 Q1 | 17,753 | 9 | 3 | 507.0 |
| 2015 Q4 | 20,937 | 6 | 1 | 286.6 |
| 2015 Q3 | 18,082 | 9 | 3 | 497.7 |
| 2015 Q2 | 16,402 | 6 | 2 | 365.8 |
| 2015 Q1 | 19,983 | 2 | 0 | 100.1 |
| 2014 Q4 | 19,983 | 2 | 1 | 100.1 |
| 2014 Q3 | 17,614 | 11 | 3 | 624.5 |
| 2014 Q2 | 16,999 | 5 | 1 | 294.1 |
| 2014 Q1 | 16,151 | 4 | 1 | 247.7 |
| 2013 Q4 | 16,019 | 3 | 1 | 187.3 |
| 2013 Q3 | 22,571 | 1 | 0 | 44.3 |
| 2013 Q2 | 17,146 | 3 | 0 | 175.0 |
| 2013 Q1 | 16,304 | 2 | 1 | 122.7 |
| 2012 Q4 | 16,431 | 4 | 2 | 243.4 |
| 2012 Q3 | 20,680 | 10 | 3 | 483.6 |
| 2012 Q2 | 17,313 | 8 | 0 | 462.1 |
| 2012 Q1 | 17,251 | 28 | 11 | 1623.1 |
| 2011 Q4 | 14,109 | 23 | 4 | 1630.2 |
| 2011 Q3 | 16,030 | 6 | 1 | 374.3 |
| 2011 Q2 | 12,625 | 64 | 15 | 5069.3 |
| 2011 Q1 | 722 | 1 | 0 | 1385.0 |
| 2010 Q4 | 992 | 8 | 1 | 8064.5 |
| 2010 Q3 | 1,196 | 1 | 0 | 836.1 |
| 2010 Q2 | 3,024 | 3 | 2 | 992.1 |
| 2010 Q1 | 3,273 | 2 | 2 | 611.1 |
| 2009 Q4 | 1,218 | 6 | 1 | 4926.1 |
| 2009 Q3 | 335 | 2 | 0 | 5970.1 |
| 2009 Q2 | 1,489 | 0 | 0 | 0.0 |
| 2009 Q1 | 627 | 0 | 0 | 0.0 |
| 2008 Q4 | 4,744 | 2 | 1 | 421.6 |
| 2008 Q3 | 9,933 | 7 | 5 | 704.7 |
| 2008 Q2 | 8,994 | 15 | 10 | 1667.8 |
| 2008 Q1 | 9,780 | 6 | 2 | 613.5 |
| 2007 Q4 | 9,459 | 1 | 0 | 105.7 |
| 2007 Q3 | 11,413 | 4 | 0 | 350.5 |
| 2007 Q2 | 10,262 | 3 | 2 | 292.3 |
| 2007 Q1 | 8,893 | 0 | 0 | 0.0 |
| 2006 Q4 | 9,763 | 0 | 0 | 0.0 |
| 2006 Q3 | 11,683 | 2 | 0 | 171.2 |
| 2006 Q2 | 12,436 | 2 | 1 | 160.8 |
| 2006 Q1 | 7,285 | 1 | 0 | 137.3 |
| 2005 Q4 | 8,876 | 1 | 0 | 112.7 |
| 2005 Q3 | 9,921 | 3 | 0 | 302.4 |
| 2005 Q2 | 10,835 | 0 | 0 | 0.0 |
| 2005 Q1 | 7,251 | 0 | 0 | 0.0 |
| 2004 Q4 | 9,467 | 1 | 1 | 105.6 |
| 2004 Q3 | 8,272 | 0 | 0 | 0.0 |
| 2004 Q2 | 7,362 | 0 | 0 | 0.0 |
| 2004 Q1 | 5,568 | 0 | 0 | 0.0 |
| 2003 Q4 | 5,694 | 0 | 0 | 0.0 |
| 2003 Q3 | 6,604 | 0 | 0 | 0.0 |
| 2003 Q2 | 8,290 | 3 | 0 | 361.9 |
| 2003 Q1 | 7,782 | 0 | 0 | 0.0 |
| 2002 Q4 | 7,139 | 2 | 0 | 280.2 |
| 2002 Q3 | 7,714 | 0 | 0 | 0.0 |
| 2002 Q2 | 6,255 | 2 | 0 | 319.7 |
| 2002 Q1 | 5,700 | 5 | 1 | 877.2 |
| 2001 Q4 | 3,372 | 1 | 0 | 296.6 |
| 2001 Q3 | 5,546 | 3 | 0 | 540.9 |
| 2001 Q2 | 3,831 | 0 | 0 | 0.0 |
| 2001 Q1 | 4,436 | 1 | 0 | 225.4 |
| 2000 Q4 | 2,903 | 5 | 1 | 1722.4 |
| 2000 Q3 | 2,635 | 5 | 2 | 1897.5 |
| 2000 Q2 | 1,320 | 0 | 0 | 0.0 |
Reportable incidents
8 on file2017 · 2 incidents
On road tractor trailer driver was dumping the limestone from the quarry at the processing plant and the tractor trailer rolled 90 deg. on its side.
2011 · 1 incident
Employee was cleaning and lubricating brake pedal on IT24 Cat Loader when a piece of rust became lodged in his right eye.
2009 · 2 incidents
No obvious cause as to the roof fall. When roof fell it impeded our primary escapeway.
Our company mechanic was doing some repairs on our Mechanical Scaler when he turned to dismount machine and lost his footing, falling 4 feet to the mine floor. The accident resulted in an emergency room visit where he received 9 stitches in his right ring finger and an xray to arm and shoulder, then released to restricted duty for 10 days.
2008 · 1 incident
The double boom drill was drilling a crosscut from 1E13 to 2E1, when the left drill steel came in contact with some undetected explosives in a bootleg. The charge detonated and damaged the stinger cylinder, knocked the hammer off the rail and shattered the front windshield.
2003 · 1 incident
THE SLINGER TRUCK WAS STUCK ON A RAMP AND WAS BEING PULLED OUT, WHEN THE MATERIAL SLID UNDER THE RIGHT SIDE REAR WHEELS CAUSING IT TO TIP OVER AND THE OPERATOR WAS TOSSED ACROSS THE CAB. THE O PERATOR RECEIVED MEDICAL TREATMENT FOR A CONTUSION AND CONCUSSION.
2000 · 1 incident
WHEN EE LEFT FRIDAY AFTERNOON ROOF HAD NO APPARENT DAMAGE. UPON RETURNING MONDAY MORNING FOUND THAT ROOF HAD COLLAPSED.