citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 45 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Pugmill #1 has $516 in proposed MSHA penalties and $0 outstanding across 1 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$516
proposed penalties
$516
current assessed
$516
paid to date
$0
outstanding
5 assessments are final orders; 1 contested dockets.
Of $2K in penalties contested before the Commission, $0 was upheld in final decisions.
As of the most recent assessment on 2017-05-18.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
ⓘContesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
10citations taken to the federal commission
Vacated or withdrawn
10 · 100%
0%
S&S designation survived the contest
ⓘCounts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 5 decided S&S contests · industry: 79%
100%
Penalty reduction in decided contests
$2K proposed, $0 after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2016-03-29.
Contested penalties
ⓘA reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year
Employees
2017
3
2016
7
2012
4
Source: MSHA quarterly employment and production, updated weekly.
Pugmill #1 sits in Ector County, Texas, where the Census mining category is 13.3% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Ector County, Texas · Population 163,206
13.3%
Mining share of county employment
$71,031
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2017 Q3
379
0
0
0.0
2017 Q2
0
1
0
2016 Q4
2,719
0
0
0.0
2016 Q3
3,226
0
0
0.0
2016 Q2
896
0
0
0.0
2016 Q1
3,100
0
0
0.0
2012 Q3
610
0
0
0.0
2012 Q2
1,566
1
0
638.6
Show 1 earlier quartersHide earlier quarters
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2012 Q1
2,146
3
0
1397.9
No fatalities recorded at this mine.
Reportable incidents
1 on file
2012 · 1 incident
March 12, 2012TX · Metal/Non-Metalfront-end loader, scraper-loader operator, pan operator, payloader, scraper rig operatorSLIP OR FALL OF PERSON
Employee was stepping down from a front-end loader and when his foot touched the ground, he stepped and slipped on a rock, causing him to fall to his knee and injure his right ankle. Medical diagnosis: right-ankle sprain.