Miner was exiting the water truck. Stepped on rock on the floor which rolled. This slightly tore a ligament in ankle.
Thayerville Mine: 195 MSHA citations Metal/Non-Metal
Thayerville Mine has $43K in proposed MSHA penalties and $151 outstanding across 4 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Thayerville Mine.
- Fatalities
- 0
- Total incidents
- 9
- Years on record
- 2000–2016
- Latest incident
- Jun 2016
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.Thayerville Mine has $43K in proposed MSHA penalties and $151 outstanding across 4 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 12 · 100%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| YORK 2024-0018 | Settlement | Paez | 2024 | $4K → $2K |
| YORK 2011-203M | Settlement | Koutras | 2013 | $887 → $625 |
| YORK 2009-203M | Settlement | Feldman | 2013 | $760 → $439 |
| YORK 2009-240M | Settlement | 2010 | $438 → $400 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2026-03-04
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Diesel particulate (total carbon)6310 over
- Total Carbon,calculated from elemental carbon.221 over
- Quartz, respirable, >1% Qtz48
- Respirable dust, <.1mg25
Show the individual readings (100)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2016-09-20 | EC @ 160 | 160 | 160 | 1.00 | Front-end Loader Operator |
| 2016-09-20 | TC @ 160 | 203 | 160 | 1.27 | Front-end Loader Operator |
| 2016-09-20 | TC from EC @ 160 | 186 | 160 | 1.16 | Front-end Loader Operator |
| 2016-08-10 | TC @ 160 | 468 | 160 | 2.93 | Front-end Loader Operator |
| 2016-08-10 | EC @ 160 | 260 | 160 | 1.63 | Scaling (mechanical) |
| 2016-08-10 | TC @ 160 | 458 | 160 | 2.86 | Drill Operator, Rotary Air |
| 2016-08-10 | TC @ 160 | 355 | 160 | 2.22 | Truck Driver |
| 2016-08-10 | EC @ 160 | 310 | 160 | 1.94 | Truck Driver |
| 2016-08-10 | EC @ 160 | 373 | 160 | 2.33 | Drill Operator, Rotary Air |
| 2016-08-10 | EC @ 160 | 397 | 160 | 2.48 | Front-end Loader Operator |
| 2016-08-10 | TC @ 160 | 303 | 160 | 1.89 | Scaling (mechanical) |
| 2013-11-07 | TC from EC @ 160 | 177 | 160 | 1.11 | Drill Operator, Jumbo Perc. |
| 2013-11-07 | TC @ 160 | 205 | 160 | 1.28 | Drill Operator, Jumbo Perc. |
| 2013-09-18 | EC @ 160 | 324 | 160 | 2.03 | Drill Operator, Jumbo Perc. |
| 2013-09-18 | EC @ 160 | 200 | 160 | 1.25 | Blaster, Powder Gang |
| 2013-09-18 | TC @ 160 | 239 | 160 | 1.49 | Blaster, Powder Gang |
| 2013-09-18 | TC @ 160 | 282 | 160 | 1.76 | Scaling (mechanical) |
| 2013-09-18 | TC @ 160 | 461 | 160 | 2.88 | Drill Operator, Jumbo Perc. |
| 2013-09-18 | EC @ 160 | 242 | 160 | 1.51 | Scaling (mechanical) |
| 2008-06-18 | TC @ 160 | 265 | 160 | 1.66 | Front-end Loader Operator |
| 2005-04-06 | Total Carbon,calculated from elemental carbon. | 432.55 | 400 | 1.08 | Drill Operator, Jumbo Perc. |
| 2026-03-04 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2026-03-04 | Respirable dust, <.1mg | 0 | Drill Operator, Rotary | ||
| 2026-03-04 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2026-03-04 | Quartz, respirable, >1% Qtz | 0.18 | 0.83 | 0.22 | Utility Man |
| 2025-10-29 | Quartz, respirable, >1% Qtz | 1.14 | 1.72 | 0.66 | Front-end Loader Operator |
| 2025-10-29 | Quartz, respirable, >1% Qtz | 0.54 | 1.21 | 0.45 | Roof Bolter, Rock |
| 2025-10-29 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2025-10-29 | Respirable dust, <.1mg | 0 | Jackhammer Operator | ||
| 2025-09-03 | TC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2025-09-03 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2025-09-03 | EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2025-09-03 | ORGANIC CARBON | 0 | Truck Driver | ||
| 2025-09-03 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2025-09-03 | TC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2025-09-03 | EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2025-09-03 | EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2025-09-03 | ORGANIC CARBON | 0 | Roof Bolter, Mounted | ||
| 2025-09-03 | TC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2025-09-03 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2025-09-03 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Jumbo Perc. |
| 2025-09-03 | ORGANIC CARBON | 0 | Drill Operator, Jumbo Perc. | ||
| 2025-09-03 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2025-09-03 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2025-09-03 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Mounted |
| 2025-05-05 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2025-05-05 | Quartz, respirable, >1% Qtz | 0.29 | 1.15 | 0.25 | Scaling (mechanical) |
| 2025-05-05 | Quartz, respirable, >1% Qtz | 0.19 | 1.11 | 0.17 | Drill Operator, Rotary Air |
| 2025-05-05 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2025-05-05 | Respirable dust, <.1mg | 0 | Utility Man | ||
| 2024-10-29 | Quartz, respirable, >1% Qtz | 0.29 | Utility Man | ||
| 2024-10-29 | Respirable dust, <.1mg | 0 | Roof Bolter, Rock | ||
| 2024-10-29 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2024-10-29 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2024-10-29 | Quartz, respirable, >1% Qtz | 0.21 | Front-end Loader Operator | ||
| 2024-08-07 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-08-07 | ORGANIC CARBON | 0 | Truck Driver | ||
| 2024-08-07 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-08-07 | TC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2024-08-07 | ORGANIC CARBON | 0 | Drill Operator, Rotary | ||
| 2024-08-07 | EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2024-08-07 | ORGANIC CARBON | 0 | Scaling (mechanical) | ||
| 2024-08-07 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Rotary |
| 2024-08-07 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2024-08-07 | EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2024-08-07 | TC @ 160 | 31 | 160 | 0.19 | Truck Driver |
| 2024-08-07 | EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2024-08-07 | TC @ 160 | 32 | 160 | 0.20 | Scaling (mechanical) |
| 2024-08-07 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-08-07 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2024-08-07 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2023-12-04 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2023-12-04 | Quartz, respirable, >1% Qtz | 0.15 | Truck Driver | ||
| 2023-12-04 | Quartz, respirable, >1% Qtz | 0.13 | Front-end Loader Operator | ||
| 2023-12-04 | Quartz, respirable, >1% Qtz | 0.31 | 1.41 | 0.22 | Drill Operator, Jumbo Perc. |
| 2023-12-04 | Quartz, respirable, >1% Qtz | 0.21 | Roof Bolter, Rock | ||
| 2023-08-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Scaling (mechanical) |
| 2023-08-15 | EC @ 160 | 64 | 160 | 0.40 | Scaling (mechanical) |
| 2023-08-15 | ORGANIC CARBON | 0 | Drill Operator, Churn | ||
| 2023-08-15 | TC @ 160 | 91 | 160 | 0.57 | Scaling (mechanical) |
| 2023-08-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2023-08-15 | EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Churn |
| 2023-08-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Drill Operator, Churn |
| 2023-08-15 | TC @ 160 | 0 | 160 | 0.00 | Drill Operator, Churn |
| 2023-08-15 | EC @ 160 | 65 | 160 | 0.41 | Truck Driver |
| 2023-08-15 | ORGANIC CARBON | 0 | Scaling (mechanical) | ||
| 2023-08-15 | TC @ 160 | 133 | 160 | 0.83 | Roof Bolter, Rock |
| 2023-08-15 | TC @ 160 | 84 | 160 | 0.53 | Truck Driver |
| 2023-08-15 | ORGANIC CARBON | 38 | Roof Bolter, Rock | ||
| 2023-08-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Roof Bolter, Rock |
| 2023-08-15 | ORGANIC CARBON | 0 | Truck Driver | ||
| 2023-08-15 | EC @ 160 | 95 | 160 | 0.59 | Roof Bolter, Rock |
| 2022-12-27 | Quartz, respirable, >1% Qtz | 0.22 | Truck Driver | ||
| 2022-12-27 | Quartz, respirable, >1% Qtz | 0.27 | 0.65 | 0.42 | Truck Driver |
| 2022-12-27 | Respirable dust, <.1mg | 0 | Scaling (mechanical) | ||
| 2022-12-27 | Quartz, respirable, >1% Qtz | 0.15 | Front-end Loader Operator | ||
| 2022-12-27 | Quartz, respirable, >1% Qtz | 0.14 | Truck Driver | ||
| 2022-08-10 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2022-08-10 | Nuisance dust, respirable, <1% Qtz | 0.17 | 10 | 0.02 | Front-end Loader Operator |
| 2022-08-10 | Respirable dust, <.1mg | 0 | Truck Driver |
Area samples (mill and shop air)
Last sampled: 2026-03-04Show the individual readings (19)
| Date | Contaminant | Concentration | Limit | Conc / limit | Area sampled |
|---|---|---|---|---|---|
| 2026-03-04 | Respirable dust, <.1mg | 0 | UG ACTIVE MINING | ||
| 2025-09-03 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2025-09-03 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2024-08-07 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2024-08-07 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2023-08-15 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2023-08-15 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-06-21 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-06-21 | TC from EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-05-27 | Unlisted Particulate, respirable, <1% Qtz | 0.12 | UG ACTIVE MINING | ||
| 2016-09-20 | TC @ 160 | 137 | UG TRAVEL/HAULAGE A | ||
| 2016-09-20 | EC @ 160 | 118 | UG TRAVEL/HAULAGE A | ||
| 2016-09-20 | TC from EC @ 160 | 0 | UG TRAVEL/HAULAGE A | ||
| 2013-11-07 | TC from EC @ 160 | 0 | UG TRAVEL/HAULAGE A | ||
| 2013-11-07 | TC @ 160 | 122 | UG TRAVEL/HAULAGE A | ||
| 2013-11-07 | EC @ 160 | 105 | UG TRAVEL/HAULAGE A | ||
| 2008-06-18 | EC @ 160 | 0.11 | UG GENERAL | ||
| 2008-06-18 | TC @ 160 | 0.12 | UG GENERAL | ||
| 2008-06-18 | TC from EC @ 160 | 0 | UG GENERAL |
Thayerville Mine recorded 0.00 reportable injury cases per 100 full-time workers in 2025.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2025 * | 0.00 | 0.00 | 0.000 |
| 2024 * | 0.00 | 0.00 | 0.000 |
| 2022 * | 0.00 | 0.00 | 0.000 |
| 2021 * | 0.00 | 0.00 | 0.000 |
| 2020 * | 0.00 | 0.00 | 0.000 |
| 2019 * | 0.00 | 0.00 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
| 2017 * | 0.00 | 0.00 | 0.000 |
- Maryland Minerals Inc 1995 to present
| Year | Employees |
|---|---|
| 2026 | 19 |
| 2025 | 16 |
| 2024 | 17 |
| 2023 | 17 |
| 2022 | 15 |
| 2021 | 16 |
| 2020 | 14 |
| 2019 | 15 |
| 2018 | 17 |
| 2017 | 17 |
| 2016 | 18 |
| 2015 | 16 |
| 2014 | 15 |
| 2013 | 14 |
| 2012 | 13 |
| 2011 | 14 |
| 2010 | 13 |
| 2009 | 15 |
| 2008 | 14 |
| 2007 | 15 |
| 2006 | 15 |
| 2005 | 16 |
| 2004 | 15 |
| 2003 | 15 |
| 2002 | 15 |
| 2001 | 16 |
| 2000 | 17 |
Thayerville Mine sits in Garrett County, Maryland, where the Census mining category is 1.5% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 9,182 | 1 | 0 | 108.9 |
| 2026 Q1 | 8,453 | 0 | 0 | 0.0 |
| 2025 Q4 | 10,049 | 1 | 0 | 99.5 |
| 2025 Q3 | 7,991 | 0 | 0 | 0.0 |
| 2025 Q2 | 9,335 | 0 | 0 | 0.0 |
| 2025 Q1 | 6,644 | 3 | 1 | 451.5 |
| 2024 Q4 | 7,645 | 1 | 0 | 130.8 |
| 2024 Q3 | 8,318 | 0 | 0 | 0.0 |
Show 97 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 11,462 | 2 | 0 | 174.5 |
| 2024 Q1 | 8,451 | 0 | 0 | 0.0 |
| 2023 Q4 | 10,640 | 0 | 0 | 0.0 |
| 2023 Q3 | 8,406 | 3 | 1 | 356.9 |
| 2023 Q2 | 8,353 | 0 | 0 | 0.0 |
| 2022 Q4 | 7,567 | 2 | 0 | 264.3 |
| 2022 Q3 | 9,197 | 0 | 0 | 0.0 |
| 2022 Q2 | 10,674 | 0 | 0 | 0.0 |
| 2022 Q1 | 8,251 | 1 | 0 | 121.2 |
| 2021 Q4 | 9,530 | 0 | 0 | 0.0 |
| 2021 Q3 | 10,479 | 0 | 0 | 0.0 |
| 2021 Q2 | 10,073 | 0 | 0 | 0.0 |
| 2021 Q1 | 5,681 | 1 | 0 | 176.0 |
| 2020 Q4 | 8,798 | 0 | 0 | 0.0 |
| 2020 Q3 | 9,704 | 0 | 0 | 0.0 |
| 2020 Q2 | 5,710 | 0 | 0 | 0.0 |
| 2020 Q1 | 8,002 | 0 | 0 | 0.0 |
| 2019 Q4 | 8,458 | 1 | 0 | 118.2 |
| 2019 Q3 | 8,853 | 1 | 0 | 113.0 |
| 2019 Q2 | 7,607 | 1 | 0 | 131.5 |
| 2019 Q1 | 9,153 | 1 | 0 | 109.3 |
| 2018 Q4 | 8,212 | 3 | 0 | 365.3 |
| 2018 Q3 | 8,709 | 2 | 0 | 229.6 |
| 2018 Q2 | 8,344 | 0 | 0 | 0.0 |
| 2018 Q1 | 7,487 | 5 | 0 | 667.8 |
| 2017 Q4 | 8,440 | 3 | 0 | 355.5 |
| 2017 Q3 | 10,121 | 18 | 8 | 1778.5 |
| 2017 Q2 | 8,935 | 4 | 1 | 447.7 |
| 2017 Q1 | 7,487 | 0 | 0 | 0.0 |
| 2016 Q4 | 8,611 | 1 | 1 | 116.1 |
| 2016 Q3 | 10,837 | 10 | 7 | 922.8 |
| 2016 Q2 | 8,354 | 1 | 0 | 119.7 |
| 2016 Q1 | 7,335 | 1 | 0 | 136.3 |
| 2015 Q4 | 9,836 | 1 | 0 | 101.7 |
| 2015 Q3 | 9,119 | 0 | 0 | 0.0 |
| 2015 Q2 | 9,469 | 9 | 2 | 950.5 |
| 2015 Q1 | 5,925 | 0 | 0 | 0.0 |
| 2014 Q4 | 8,728 | 4 | 1 | 458.3 |
| 2014 Q3 | 7,835 | 3 | 1 | 382.9 |
| 2014 Q2 | 9,729 | 1 | 1 | 102.8 |
| 2014 Q1 | 5,455 | 0 | 0 | 0.0 |
| 2013 Q4 | 8,741 | 4 | 0 | 457.6 |
| 2013 Q3 | 6,055 | 0 | 0 | 0.0 |
| 2013 Q2 | 8,233 | 1 | 0 | 121.5 |
| 2013 Q1 | 4,913 | 2 | 1 | 407.1 |
| 2012 Q4 | 5,959 | 0 | 0 | 0.0 |
| 2012 Q3 | 6,060 | 0 | 0 | 0.0 |
| 2012 Q2 | 8,082 | 2 | 2 | 247.5 |
| 2012 Q1 | 3,883 | 4 | 0 | 1030.1 |
| 2011 Q4 | 6,694 | 0 | 0 | 0.0 |
| 2011 Q3 | 6,098 | 4 | 2 | 656.0 |
| 2011 Q2 | 8,140 | 0 | 0 | 0.0 |
| 2011 Q1 | 4,203 | 6 | 0 | 1427.6 |
| 2010 Q4 | 6,626 | 1 | 0 | 150.9 |
| 2010 Q3 | 7,642 | 0 | 0 | 0.0 |
| 2010 Q2 | 6,696 | 12 | 6 | 1792.1 |
| 2010 Q1 | 3,272 | 3 | 1 | 916.9 |
| 2009 Q4 | 6,174 | 7 | 3 | 1133.8 |
| 2009 Q3 | 7,384 | 5 | 0 | 677.1 |
| 2009 Q2 | 7,086 | 5 | 1 | 705.6 |
| 2009 Q1 | 5,884 | 3 | 0 | 509.9 |
| 2008 Q4 | 6,178 | 0 | 0 | 0.0 |
| 2008 Q3 | 7,780 | 1 | 0 | 128.5 |
| 2008 Q2 | 6,630 | 0 | 0 | 0.0 |
| 2008 Q1 | 5,160 | 0 | 0 | 0.0 |
| 2007 Q4 | 5,837 | 2 | 1 | 342.6 |
| 2007 Q3 | 8,699 | 0 | 0 | 0.0 |
| 2007 Q2 | 7,340 | 0 | 0 | 0.0 |
| 2007 Q1 | 4,277 | 2 | 1 | 467.6 |
| 2006 Q4 | 8,049 | 2 | 0 | 248.5 |
| 2006 Q3 | 9,713 | 2 | 0 | 205.9 |
| 2006 Q2 | 8,215 | 0 | 0 | 0.0 |
| 2006 Q1 | 6,289 | 3 | 0 | 477.0 |
| 2005 Q4 | 7,620 | 0 | 0 | 0.0 |
| 2005 Q3 | 9,746 | 1 | 0 | 102.6 |
| 2005 Q2 | 8,030 | 1 | 0 | 124.5 |
| 2005 Q1 | 7,176 | 1 | 0 | 139.4 |
| 2004 Q4 | 8,128 | 2 | 0 | 246.1 |
| 2004 Q3 | 9,796 | 0 | 0 | 0.0 |
| 2004 Q2 | 8,982 | 1 | 0 | 111.3 |
| 2004 Q1 | 5,629 | 1 | 0 | 177.7 |
| 2003 Q4 | 8,836 | 2 | 1 | 226.3 |
| 2003 Q3 | 8,887 | 1 | 0 | 112.5 |
| 2003 Q2 | 8,838 | 1 | 0 | 113.1 |
| 2003 Q1 | 5,503 | 0 | 0 | 0.0 |
| 2002 Q4 | 9,014 | 1 | 0 | 110.9 |
| 2002 Q3 | 8,855 | 0 | 0 | 0.0 |
| 2002 Q2 | 10,195 | 1 | 0 | 98.1 |
| 2002 Q1 | 4,767 | 1 | 0 | 209.8 |
| 2001 Q4 | 10,752 | 1 | 0 | 93.0 |
| 2001 Q3 | 9,893 | 2 | 0 | 202.2 |
| 2001 Q2 | 10,978 | 2 | 0 | 182.2 |
| 2001 Q1 | 6,291 | 4 | 0 | 635.8 |
| 2000 Q4 | 11,110 | 1 | 1 | 90.0 |
| 2000 Q3 | 9,392 | 2 | 1 | 212.9 |
| 2000 Q2 | 11,804 | 5 | 3 | 423.6 |
| 2000 Q1 | 8,020 | 3 | 1 | 374.1 |
Reportable incidents
9 on file2016 · 1 incident
2013 · 2 incidents
Miner was cleaning a tramp magnet. He pulled a piece of steel down and it pulled the piece of steel back up pinching the tip of his index finger.
The miner was installing a rubber screen. It was too long so he decided to trim off the excess with a utility knife. It slid and caused a laceration to his left forearm approximately 2 1/2" in length.
2010 · 1 incident
EE was using a bar to turn a ratchet wrench, pulling toward himself. The bar slipped and hit the EE on the right side of his head.
2007 · 2 incidents
Employee strained his chest muscles while performing maintenance on the underground drill.
EE was working on a loader that had its cab & transmission removed. He was where the transmission had been, cleaning the area. He raised an access panel on the hood to give himself more room. His hard hat fell off. He stood to replace it, the wind blew the access panel shut striking him in the head before he could replace his hard hat. He required 4 stitches, 1 day off work.
2006 · 1 incident
Bumped head on roof of mine while filling drill holes with explosives
2004 · 1 incident
EMPLOYEE WAS DRIVING A MINE HAUL TRUCK. HE MADE A WRONG TURN IN THE MINE, AND WHEN HE DISCOVERED THE WRONG TURN HE BRAKED WHICH THEN CAUSED THE TRUCK TO SLIDE IN THE MUD SLAMMING INTO THE MINE WALL.
2000 · 1 incident
COMPUTER AND WRITING WORK LEADING TO CARPAL TUNNEL SYNDROME.