Mining Incidents

The Crusher: 131 MSHA citations Metal/Non-Metal

Avail Valley Construction-ID, LLC · Surface
Controlled by AVCO Holdings LLC
Driggs, Teton County, ID  ·  Intermittent
MSHA Mine ID: 1001983

The Crusher has $44K in proposed MSHA penalties and $0 outstanding across 6 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at The Crusher.

Fatalities
0
Total incidents
0
Years on record
Latest incident
Compliance record
MSHA citations since 2000
131
citations
35
significant & substantial
$44,077
proposed penalties
$38,835
paid to date
88% of proposed penalties paid to date, a $5,242 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
47
inspections on record
702
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 702 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

The Crusher has $44K in proposed MSHA penalties and $0 outstanding across 6 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$44K
proposed penalties
$39K
current assessed
$39K
paid to date
$0
outstanding
131 assessments are final orders; 6 contested dockets.
Of $21K in penalties contested before the Commission, $16K was upheld in final decisions.
As of the most recent assessment on 2026-01-26.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
26.7%
significant & substantial
16.0%
high negligence or reckless
26.7%
reasonably likely or greater
67.2%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 3.1% low, 80.9% moderate, 16.0% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
13 citations taken to the federal commission · 10% of citations on record
  • Settled 13 · 100%
100%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 4 decided S&S contests · industry: 79%
25%
Penalty reduction in decided contests
$17K proposed, $13K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2020-07-29.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
WEST 2009-309M Settlement Lesnick 2009 $17K → $12K
WEST 2004-62M Settlement Lesnick 2004 $2K → $2K
WEST20020482M Settlement Barbour 2002 $2K → $1K
WEST 2018-0561 Settlement Manning 2019 $404 → $404
WEST 2020-0367 Settlement Miller 2020 $123 → $123
WEST 2014-0749 Settlement Lesnick 2015 $100 → $100
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2025-07-02
0%
of limit-tested samples over the exposure limit
15
samples
7
limit-tested
Most sampled contaminants
  • Quartz, respirable, >1% Qtz8
  • Respirable dust, <.1mg7
Show the individual readings (15)
Date Contaminant Concentration Limit Conc / limit Occupation
2025-07-02 Respirable dust, <.1mg 0 Cleanup Man
2025-07-02 Quartz, respirable, >1% Qtz 0.35 0.74 0.47 Crusher Oper/Worker
2025-07-02 Respirable dust, <.1mg 0 Supervisor, Co. Official
2025-03-18 Quartz, respirable, >1% Qtz 0.13 Laborer, Bullgang
2025-03-18 Respirable dust, <.1mg 0 Crusher Oper/Worker
2025-03-18 Respirable dust, <.1mg 0 Front-end Loader Operator
2014-09-04 Quartz, respirable, >1% Qtz 0.21 0.61 0.34 Crusher Oper/Worker
2014-09-04 Quartz, respirable, >1% Qtz 0.32 1.23 0.26 Front-end Loader Operator
2012-05-23 Respirable dust, <.1mg 0 Front-end Loader Operator
2012-05-23 Respirable dust, <.1mg 0 Front-end Loader Operator
2003-06-04 Quartz, respirable, >1% Qtz 0.87 0.97 0.90 Laborer, Bullgang
2003-06-04 Quartz, respirable, >1% Qtz 0.24 0.84 0.29 Front-end Loader Operator
2002-06-19 Respirable dust, <.1mg 0 Front-end Loader Operator
2002-06-19 Quartz, respirable, >1% Qtz 0.25 0.59 0.42 Laborer, Bullgang
2002-06-19 Quartz, respirable, >1% Qtz 0.12 1.04 0.12 Bulldozer Operator
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Alta Construction 2000 to 2006
  2. Owen-PC Construction 2006 to 2014
  3. Avail Valley Construction-ID, LLC 2014 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2026 3
2025 4
2024 3
2023 5
2022 4
2021 6
2020 4
2019 3
2018 2
2017 2
2016 4
2015 4
2014 3
2013 4
2012 3
2011 2
2010 2
2009 3
2008 5
2007 5
2006 4
2005 3
2004 3
2003 3
2002 3
2001 2
2000 2
Source: MSHA quarterly employment and production, updated weekly.

The Crusher sits in Teton County, Idaho, where the Census mining category is 0.1% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Teton County, Idaho · Population 12,101
0.1%
Mining share of county employment
$90,740
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2026 Q2 299 0 0 0.0
2026 Q1 1 1 0 1000000.0
2025 Q4 998 0 0 0.0
2025 Q3 713 3 0 4207.6
2025 Q2 379 0 0 0.0
2025 Q1 545 5 2 9174.3
2024 Q4 1,545 0 0 0.0
2024 Q3 1,346 2 1 1485.9
Show 92 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2024 Q2 1,158 1 0 863.6
2024 Q1 1,492 0 0 0.0
2023 Q4 3,018 0 0 0.0
2023 Q3 1,897 3 0 1581.4
2023 Q2 2,677 0 0 0.0
2023 Q1 1,193 3 0 2514.7
2022 Q4 1,130 0 0 0.0
2022 Q3 1,191 1 0 839.6
2022 Q2 1,775 0 0 0.0
2022 Q1 2,271 12 6 5284.0
2021 Q4 2,797 0 0 0.0
2021 Q3 4,546 5 1 1099.9
2021 Q2 4,611 0 0 0.0
2021 Q1 2,492 1 0 401.3
2020 Q4 2,516 0 0 0.0
2020 Q3 2,799 0 0 0.0
2020 Q2 1,932 5 3 2588.0
2020 Q1 843 0 0 0.0
2019 Q4 1,401 0 0 0.0
2019 Q3 2,150 2 0 930.2
2019 Q2 1,441 0 0 0.0
2019 Q1 0 0 0
2018 Q4 0 0 0
2018 Q3 460 2 1 4347.8
2018 Q2 887 0 0 0.0
2018 Q1 0 0 0
2017 Q4 0 0 0
2017 Q3 774 2 0 2584.0
2017 Q2 822 0 0 0.0
2017 Q1 0 0 0
2016 Q4 336 0 0 0.0
2016 Q3 1,969 0 0 0.0
2016 Q2 1,520 0 0 0.0
2016 Q1 459 0 0 0.0
2015 Q4 1,708 2 0 1171.0
2015 Q3 1,541 0 0 0.0
2015 Q2 1,318 0 0 0.0
2015 Q1 320 0 0 0.0
2014 Q4 1,304 0 0 0.0
2014 Q3 1,728 2 0 1157.4
2014 Q2 549 0 0 0.0
2014 Q1 0 2 0
2013 Q4 649 0 0 0.0
2013 Q3 2,655 0 0 0.0
2013 Q2 1,466 2 0 1364.3
2012 Q4 103 0 0 0.0
2012 Q3 1,848 0 0 0.0
2012 Q2 1,498 0 0 0.0
2011 Q2 517 0 0 0.0
2011 Q1 0 0 0
2010 Q4 516 0 0 0.0
2010 Q3 678 0 0 0.0
2010 Q2 204 0 0 0.0
2010 Q1 0 0 0
2009 Q4 683 0 0 0.0
2009 Q3 1,175 6 1 5106.4
2009 Q2 0 0 0
2009 Q1 0 0 0
2008 Q4 1,990 12 5 6030.2
2008 Q3 2,036 0 0 0.0
2008 Q2 3,334 0 0 0.0
2008 Q1 468 0 0 0.0
2007 Q4 2,224 11 0 4946.0
2007 Q3 3,036 0 0 0.0
2007 Q2 3,630 0 0 0.0
2007 Q1 270 0 0 0.0
2006 Q4 1,608 0 0 0.0
2006 Q3 1,807 2 0 1106.8
2006 Q2 1,272 0 0 0.0
2006 Q1 153 0 0 0.0
2005 Q4 1,044 0 0 0.0
2005 Q3 1,256 0 0 0.0
2005 Q2 1,165 3 0 2575.1
2005 Q1 123 0 0 0.0
2004 Q4 963 0 0 0.0
2004 Q3 1,296 7 0 5401.2
2004 Q2 966 0 0 0.0
2004 Q1 0 0 0
2003 Q4 643 0 0 0.0
2003 Q3 3,170 0 0 0.0
2003 Q2 586 3 1 5119.5
2003 Q1 0 0 0
2002 Q4 1,750 0 0 0.0
2002 Q3 603 0 0 0.0
2002 Q2 882 6 4 6802.7
2002 Q1 0 0 0
2001 Q4 717 0 0 0.0
2001 Q3 1,219 23 10 18867.9
2001 Q2 240 0 0 0.0
2001 Q1 0 0 0
2000 Q4 560 0 0 0.0
2000 Q3 1,040 2 0 1923.1

No reportable incidents on file.

MSHA has no recorded reportable accidents for this mine in the current dataset. New reports appear here within a week of being filed.