The employee was hammering oversize rock at the entrance of stope at 12N/T13-L1 when an oversized rock came down and rolled onto the ROPES pinning EE in the cab.
WINGDALE MINE: 662 MSHA citations Metal/Non-Metal
WINGDALE MINE has $204K in proposed MSHA penalties and $302 outstanding across 19 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at WINGDALE MINE.
- Fatalities
- 0
- Total incidents
- 36
- Years on record
- 1995–2021
- Latest incident
- Dec 2021
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.WINGDALE MINE has $204K in proposed MSHA penalties and $302 outstanding across 19 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 61 · 81%
- Stood as issued 6 · 8%
- Vacated or withdrawn 6 · 8%
- Still open 2 · 3%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| YORK 2008-39M | Settlement | Feldman | 2009 | $29K → $18K |
| YORK 2008-172M | Settlement | Feldman | 2009 | $18K → $13K |
| YORK 2022-0041 | Settlement | Lewis | 2022 | $16K → $4K |
| YORK 2008-118M | Withdrawal | Lesnick | 2008 | $12K → $0 |
| YORK 2012-11M | Settlement | Paez | 2012 | $6K → $2K |
| YORK 2012-246M | Settlement | McCarthy | 2013 | $5K → $4K |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2026-04-08
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Diesel particulate (total carbon)5212 over
- Quartz, respirable, >1% Qtz5111 over
- Total Carbon,calculated from elemental carbon.192 over
- Total Carbon,TC192 over
Show the individual readings (100)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2020-10-06 | Quartz, respirable, >1% Qtz | 0.48 | 0.48 | 1.00 | Laborer, Bullgang |
| 2017-11-14 | TC @ 160 | 174 | 160 | 1.09 | Blaster, Powder Gang |
| 2017-11-14 | Quartz, respirable, >1% Qtz | 1.17 | 0.62 | 1.89 | Crusher Oper/Worker |
| 2016-11-02 | TC @ 160 | 341 | 160 | 2.13 | Crusher Oper/Worker |
| 2012-06-20 | Quartz, respirable, >1% Qtz | 0.96 | 0.51 | 1.88 | Utility Man |
| 2012-05-15 | Quartz, respirable, >1% Qtz | 1.55 | 1.02 | 1.52 | Utility Man |
| 2010-11-03 | TC from EC @ 160 | 210 | 160 | 1.31 | Blaster, Powder Gang |
| 2010-11-03 | TC @ 160 | 207 | 160 | 1.29 | Blaster, Powder Gang |
| 2010-11-03 | TC @ 160 | 202 | 160 | 1.26 | Surveyor |
| 2010-11-03 | TC from EC @ 160 | 197 | 160 | 1.23 | Surveyor |
| 2010-09-15 | TC @ 160 | 261 | 160 | 1.63 | Blaster, Powder Gang |
| 2010-09-15 | TC from EC @ 160 | 218 | 160 | 1.36 | Blaster, Powder Gang |
| 2010-01-20 | TC @ 160 | 394 | 160 | 2.46 | Blaster, Powder Gang |
| 2010-01-20 | EC @ 160 | 285 | 160 | 1.78 | Blaster, Powder Gang |
| 2009-09-24 | TC @ 160 | 252 | 160 | 1.58 | Blaster, Powder Gang |
| 2009-09-24 | EC @ 160 | 193 | 160 | 1.21 | Blaster, Powder Gang |
| 2009-05-06 | EC @ 160 | 206 | 160 | 1.29 | Blaster, Powder Gang |
| 2009-05-06 | TC @ 160 | 260 | 160 | 1.63 | Blaster, Powder Gang |
| 2009-05-06 | TC @ 160 | 316 | 160 | 1.98 | Drill Operator, Jumbo Perc. |
| 2009-05-06 | TC from EC @ 160 | 188 | 160 | 1.18 | Drill Operator, Jumbo Perc. |
| 2008-09-17 | TC from EC @ 160 | 207 | 160 | 1.29 | Blaster, Powder Gang |
| 2008-09-17 | TC @ 160 | 202 | 160 | 1.26 | Blaster, Powder Gang |
| 2008-07-15 | EC @ 160 | 213 | 160 | 1.33 | Utility Man |
| 2008-07-15 | EC @ 160 | 238 | 160 | 1.49 | Blaster, Powder Gang |
| 2008-07-15 | TC @ 160 | 283 | 160 | 1.77 | Utility Man |
| 2008-07-15 | TC @ 160 | 303 | 160 | 1.89 | Blaster, Powder Gang |
| 2007-11-29 | Quartz, respirable, >1% Qtz | 0.91 | 0.61 | 1.49 | Utility Man |
| 2007-11-29 | Quartz, respirable, >1% Qtz | 0.48 | 0.43 | 1.12 | Crusher Oper/Worker |
| 2007-07-10 | Quartz, respirable, >1% Qtz | 2.24 | 0.63 | 3.56 | Belt Cleaner |
| 2007-07-10 | Quartz, respirable, >1% Qtz | 1.29 | 0.51 | 2.53 | Crusher Oper/Worker |
| 2005-06-29 | Total Carbon,TC | 404.86 | 400 | 1.01 | Blaster, Powder Gang |
| 2005-06-29 | Total Carbon,calculated from elemental carbon. | 433.32 | 400 | 1.08 | Blaster, Powder Gang |
| 2005-06-29 | Total Carbon,calculated from elemental carbon. | 447.54 | 400 | 1.12 | Drill Operator, Jumbo Perc. |
| 2005-06-29 | Total Carbon,TC | 411.46 | 400 | 1.03 | Drill Operator, Jumbo Perc. |
| 2002-12-04 | Quartz, respirable, >1% Qtz | 0.77 | 0.77 | 1.00 | Drill Operator, Jumbo Perc. |
| 2002-07-09 | Quartz, respirable, >1% Qtz | 1.15 | 1.04 | 1.11 | Scaling (mechanical) |
| 2002-03-20 | Quartz, respirable, >1% Qtz | 1.06 | 0.76 | 1.39 | Front-end Loader Operator |
| 2026-04-08 | ORGANIC CARBON | 0 | Crusher Oper/Worker | ||
| 2026-04-08 | EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2026-04-08 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2026-04-08 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2026-04-08 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2026-04-08 | TC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2026-04-08 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2026-04-08 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-10-09 | ORGANIC CARBON | 0 | Laborer, Bullgang | ||
| 2024-10-09 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2024-10-09 | ORGANIC CARBON | 0 | Crusher Oper/Worker | ||
| 2024-10-09 | TC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2024-10-09 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2024-10-09 | TC from EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2024-10-09 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-10-09 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-10-09 | EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2024-10-09 | TC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2024-10-09 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2024-10-09 | EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2023-11-15 | Respirable dust, <.1mg | 0 | Truck Driver | ||
| 2023-11-15 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2023-11-15 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2023-11-15 | Respirable dust, <.1mg | 0 | Shovel Operator | ||
| 2023-11-14 | TC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2023-11-14 | ORGANIC CARBON | 0 | Crusher Oper/Worker | ||
| 2023-11-14 | EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2023-11-14 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2023-11-14 | TC from EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2023-11-14 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2023-11-14 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2023-11-14 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2023-11-14 | TC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2023-11-14 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2023-11-14 | EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2023-11-14 | ORGANIC CARBON | 0 | Laborer, Bullgang | ||
| 2023-04-17 | Unlisted Particulate, total, <1% Qtz | 0.25 | Cleanup Man | ||
| 2022-11-15 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2022-11-15 | TC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2022-11-15 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2022-11-15 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2022-11-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2022-11-15 | ORGANIC CARBON | 0 | Laborer, Bullgang | ||
| 2022-11-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2022-11-15 | EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2022-11-15 | EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2022-11-15 | TC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2022-11-15 | TC from EC @ 160 | 0 | 160 | 0.00 | Laborer, Bullgang |
| 2022-11-15 | ORGANIC CARBON | 0 | Crusher Oper/Worker | ||
| 2021-11-03 | Quartz, respirable, >1% Qtz | 0.3 | 0.65 | 0.46 | Utility Man |
| 2021-11-02 | TC @ 160 | 42 | 160 | 0.26 | Front-end Loader Operator |
| 2021-11-02 | ORGANIC CARBON | 0 | Front-end Loader Operator | ||
| 2021-11-02 | EC @ 160 | 35 | 160 | 0.22 | Front-end Loader Operator |
| 2021-11-02 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2021-11-02 | TC from EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2021-11-02 | TC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2021-11-02 | ORGANIC CARBON | 0 | Truck Driver | ||
| 2021-11-02 | EC @ 160 | 0 | 160 | 0.00 | Truck Driver |
| 2021-04-06 | TC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2021-04-06 | TC from EC @ 160 | 0 | 160 | 0.00 | Crusher Oper/Worker |
| 2021-04-06 | EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
| 2021-04-06 | EC @ 160 | 45 | 160 | 0.28 | Crusher Oper/Worker |
| 2021-04-06 | TC from EC @ 160 | 0 | 160 | 0.00 | Front-end Loader Operator |
Area samples (mill and shop air)
Last sampled: 2026-04-08Show the individual readings (27)
| Date | Contaminant | Concentration | Limit | Conc / limit | Area sampled |
|---|---|---|---|---|---|
| 2026-04-08 | EC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2026-04-08 | TC @ 160 | 0 | UG TRAVEL/HAULAGE | ||
| 2024-10-09 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2024-10-09 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2023-11-14 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2023-11-14 | TC @ 160 | 0 | UG ACTIVE MINING | ||
| 2022-11-15 | EC @ 160 | 0 | UG ORE PROCESSING | ||
| 2022-11-15 | TC @ 160 | 0 | UG ORE PROCESSING | ||
| 2021-11-02 | EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2021-11-02 | TC from EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2016-11-02 | TC from EC @ 160 | 0 | UG ACTIVE MINING AR | ||
| 2016-11-02 | EC @ 160 | 220 | UG ACTIVE MINING AR | ||
| 2016-11-02 | TC @ 160 | 296 | UG ACTIVE MINING AR | ||
| 2010-11-03 | TC @ 160 | 111 | UG ACTIVE MINING AR | ||
| 2010-11-03 | TC from EC @ 160 | 0 | UG ACTIVE MINING AR | ||
| 2010-11-03 | EC @ 160 | 77 | UG ACTIVE MINING AR | ||
| 2010-09-15 | TC @ 160 | 220 | UG Active Mining | ||
| 2010-09-15 | EC @ 160 | 162 | UG Active Mining | ||
| 2010-09-15 | TC from EC @ 160 | 0 | UG Active Mining | ||
| 2009-05-06 | TC from EC @ 160 | 0 | UNDERGROUND GENERAL | ||
| 2009-05-06 | TC @ 160 | 185 | UNDERGROUND GENERAL | ||
| 2009-05-06 | EC @ 160 | 150 | UNDERGROUND GENERAL | ||
| 2008-09-17 | EC @ 160 | 317 | UG ACTIVE MINING | ||
| 2008-09-17 | TC @ 160 | 418 | UG ACTIVE MINING | ||
| 2008-09-17 | TC from EC @ 160 | 0 | UG ACTIVE MINING | ||
| 2007-11-29 | Quartz, respirable, >1% Qtz | 0.72 | UG SHOP | ||
| 2003-02-26 | Quartz, respirable, >1% Qtz | 0.43 | UG SHOP |
WINGDALE MINE recorded 0.00 reportable injury cases per 100 full-time workers in 2025.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2025 * | 0.00 | 0.00 | 0.000 |
| 2024 * | 0.00 | 0.00 | 0.000 |
| 2023 * | 0.00 | 0.00 | 0.000 |
| 2022 * | 0.00 | 0.00 | 0.000 |
| 2021 * | 3.99 | 3.99 | 0.000 |
| 2020 * | 3.62 | 3.62 | 0.000 |
| 2019 * | 0.00 | 0.00 | 0.000 |
| 2018 * | 0.00 | 0.00 | 0.000 |
- Patterson Materials Corp 1995 to 1999
- American Mine Services Inc 1999 to 2000
- Wingdale Materials LLC 2000 to present
| Year | Employees |
|---|---|
| 2026 | 22 |
| 2025 | 21 |
| 2024 | 21 |
| 2023 | 23 |
| 2022 | 22 |
| 2021 | 21 |
| 2020 | 23 |
| 2019 | 23 |
| 2018 | 25 |
| 2017 | 25 |
| 2016 | 23 |
| 2015 | 24 |
| 2014 | 25 |
| 2013 | 24 |
| 2012 | 25 |
| 2011 | 22 |
| 2010 | 25 |
| 2009 | 23 |
| 2008 | 14 |
| 2007 | 16 |
| 2006 | 14 |
| 2005 | 13 |
| 2004 | 11 |
| 2003 | 12 |
| 2002 | 12 |
| 2001 | 12 |
| 2000 | 14 |
WINGDALE MINE sits in Dutchess County, New York, where the Census mining category is 0.1% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 12,664 | 2 | 1 | 157.9 |
| 2026 Q1 | 11,148 | 5 | 1 | 448.5 |
| 2025 Q4 | 10,041 | 2 | 0 | 199.2 |
| 2025 Q3 | 13,312 | 2 | 0 | 150.2 |
| 2025 Q2 | 12,176 | 2 | 0 | 164.3 |
| 2025 Q1 | 12,833 | 2 | 0 | 155.8 |
| 2024 Q4 | 12,208 | 6 | 0 | 491.5 |
| 2024 Q3 | 13,210 | 3 | 0 | 227.1 |
Show 98 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 13,405 | 4 | 0 | 298.4 |
| 2024 Q1 | 12,551 | 4 | 0 | 318.7 |
| 2023 Q4 | 12,165 | 13 | 1 | 1068.6 |
| 2023 Q3 | 13,575 | 4 | 0 | 294.7 |
| 2023 Q2 | 13,685 | 2 | 0 | 146.1 |
| 2023 Q1 | 12,565 | 1 | 0 | 79.6 |
| 2022 Q4 | 11,926 | 1 | 0 | 83.9 |
| 2022 Q3 | 10,025 | 3 | 0 | 299.3 |
| 2022 Q2 | 14,953 | 8 | 0 | 535.0 |
| 2022 Q1 | 11,837 | 6 | 1 | 506.9 |
| 2021 Q4 | 13,522 | 9 | 3 | 665.6 |
| 2021 Q3 | 14,493 | 2 | 0 | 138.0 |
| 2021 Q2 | 13,309 | 6 | 0 | 450.8 |
| 2021 Q1 | 8,767 | 2 | 0 | 228.1 |
| 2020 Q4 | 11,567 | 9 | 0 | 778.1 |
| 2020 Q3 | 15,582 | 5 | 0 | 320.9 |
| 2020 Q2 | 16,655 | 3 | 0 | 180.1 |
| 2020 Q1 | 11,479 | 1 | 0 | 87.1 |
| 2019 Q4 | 12,352 | 5 | 0 | 404.8 |
| 2019 Q3 | 13,483 | 5 | 0 | 370.8 |
| 2019 Q2 | 14,781 | 0 | 0 | 0.0 |
| 2019 Q1 | 11,193 | 4 | 0 | 357.4 |
| 2018 Q4 | 12,445 | 7 | 1 | 562.5 |
| 2018 Q3 | 13,335 | 8 | 1 | 599.9 |
| 2018 Q2 | 15,940 | 5 | 0 | 313.7 |
| 2018 Q1 | 12,887 | 6 | 1 | 465.6 |
| 2017 Q4 | 14,765 | 8 | 1 | 541.8 |
| 2017 Q3 | 17,453 | 11 | 2 | 630.3 |
| 2017 Q2 | 16,533 | 4 | 0 | 241.9 |
| 2017 Q1 | 11,812 | 5 | 0 | 423.3 |
| 2016 Q4 | 13,401 | 21 | 3 | 1567.0 |
| 2016 Q3 | 10,923 | 11 | 0 | 1007.0 |
| 2016 Q2 | 14,680 | 26 | 3 | 1771.1 |
| 2016 Q1 | 10,700 | 3 | 1 | 280.4 |
| 2015 Q4 | 9,537 | 0 | 0 | 0.0 |
| 2015 Q3 | 16,356 | 4 | 0 | 244.6 |
| 2015 Q2 | 15,839 | 10 | 2 | 631.4 |
| 2015 Q1 | 10,343 | 4 | 1 | 386.7 |
| 2014 Q4 | 10,902 | 3 | 0 | 275.2 |
| 2014 Q3 | 15,153 | 1 | 0 | 66.0 |
| 2014 Q2 | 14,656 | 3 | 0 | 204.7 |
| 2014 Q1 | 8,733 | 7 | 0 | 801.6 |
| 2013 Q4 | 9,513 | 8 | 0 | 841.0 |
| 2013 Q3 | 13,319 | 0 | 0 | 0.0 |
| 2013 Q2 | 14,214 | 18 | 2 | 1266.4 |
| 2013 Q1 | 8,458 | 3 | 0 | 354.7 |
| 2012 Q4 | 4,346 | 0 | 0 | 0.0 |
| 2012 Q3 | 14,088 | 4 | 0 | 283.9 |
| 2012 Q2 | 15,712 | 18 | 7 | 1145.6 |
| 2012 Q1 | 13,929 | 1 | 0 | 71.8 |
| 2011 Q4 | 12,418 | 4 | 0 | 322.1 |
| 2011 Q3 | 14,535 | 15 | 3 | 1032.0 |
| 2011 Q2 | 14,976 | 7 | 1 | 467.4 |
| 2011 Q1 | 8,617 | 6 | 0 | 696.3 |
| 2010 Q4 | 12,222 | 28 | 4 | 2291.0 |
| 2010 Q3 | 16,566 | 10 | 1 | 603.6 |
| 2010 Q2 | 15,175 | 15 | 0 | 988.5 |
| 2010 Q1 | 14,058 | 7 | 2 | 497.9 |
| 2009 Q4 | 14,674 | 10 | 4 | 681.5 |
| 2009 Q3 | 14,984 | 13 | 2 | 867.6 |
| 2009 Q2 | 11,901 | 13 | 1 | 1092.3 |
| 2009 Q1 | 8,828 | 22 | 7 | 2492.1 |
| 2008 Q4 | 8,639 | 0 | 0 | 0.0 |
| 2008 Q3 | 10,640 | 11 | 2 | 1033.8 |
| 2008 Q2 | 9,458 | 0 | 0 | 0.0 |
| 2008 Q1 | 6,812 | 10 | 0 | 1468.0 |
| 2007 Q4 | 9,322 | 22 | 2 | 2360.0 |
| 2007 Q3 | 11,719 | 32 | 13 | 2730.6 |
| 2007 Q2 | 13,164 | 4 | 2 | 303.9 |
| 2007 Q1 | 8,551 | 2 | 0 | 233.9 |
| 2006 Q4 | 9,466 | 3 | 1 | 316.9 |
| 2006 Q3 | 10,170 | 8 | 1 | 786.6 |
| 2006 Q2 | 10,045 | 2 | 0 | 199.1 |
| 2006 Q1 | 7,647 | 4 | 0 | 523.1 |
| 2005 Q4 | 7,554 | 10 | 3 | 1323.8 |
| 2005 Q3 | 9,892 | 6 | 2 | 606.6 |
| 2005 Q2 | 9,692 | 10 | 1 | 1031.8 |
| 2005 Q1 | 7,012 | 0 | 0 | 0.0 |
| 2004 Q4 | 7,206 | 1 | 0 | 138.8 |
| 2004 Q3 | 8,389 | 8 | 2 | 953.6 |
| 2004 Q2 | 7,459 | 1 | 0 | 134.1 |
| 2004 Q1 | 6,701 | 2 | 0 | 298.5 |
| 2003 Q4 | 6,524 | 0 | 0 | 0.0 |
| 2003 Q3 | 6,921 | 6 | 0 | 866.9 |
| 2003 Q2 | 6,767 | 0 | 0 | 0.0 |
| 2003 Q1 | 6,361 | 4 | 2 | 628.8 |
| 2002 Q4 | 6,550 | 2 | 0 | 305.3 |
| 2002 Q3 | 7,022 | 1 | 1 | 142.4 |
| 2002 Q2 | 8,242 | 4 | 1 | 485.3 |
| 2002 Q1 | 5,794 | 3 | 2 | 517.8 |
| 2001 Q4 | 6,817 | 4 | 1 | 586.8 |
| 2001 Q3 | 7,080 | 4 | 1 | 565.0 |
| 2001 Q2 | 8,837 | 1 | 1 | 113.2 |
| 2001 Q1 | 6,129 | 3 | 1 | 489.5 |
| 2000 Q4 | 9,083 | 2 | 0 | 220.2 |
| 2000 Q3 | 12,320 | 5 | 1 | 405.8 |
| 2000 Q2 | 10,466 | 0 | 0 | 0.0 |
| 2000 Q1 | 360 | 2 | 0 | 5555.6 |
Reportable incidents
36 on file2021 · 1 incident
2020 · 1 incident
Employee claims they fractured a rib and has fluid on a lung, was working on the screen deck.
2017 · 2 incidents
While lifting a screen strained employee's back
Working on Conveyor, sliding rollers out from under the belt and strained lower back
2016 · 1 incident
Pulling 30ft fuel hose from truck when EE felt a sharp pain in the left side of neck.
2014 · 3 incidents
Lost balance put left hand down to catch himself from falling and cut the top of left fingers.
While welding in a discharge chute, weld slag caught his left pant leg on fire. Causing a burn on his left calf.
Climbing up the ladder to cab on the Terex T-40 haul truck, missed a step while climbing and slid down the ladder to the ground. Was about 1-2 feet up when he slid down the ladder.
2013 · 3 incidents
he was bringing a roller to change it and his knee gave out.
Rough floor, running LHD, pulled lower back muscle
EE Was in the process of removing wedges from the upper liner (Gyro Crusher). During the process while swinging a sledge hammer he struck a handle of another hammer. The hammer became airborne striking him in the head.
2012 · 4 incidents
While mucking with loader hit a pot hole and bounced in seat, when seat bottomed out felt pop in lower back. No missed work until 7/25/12
Cleaning up completed work area. Conveyor belt clamp standing on end slid down handrail and struck left hand pinching the smallest finger between the clamp and stand.
while prying screen panel loose to move it for lifting, pry bar slipped out of his hands while under tension striking his right elbow.
While Surveying a heading employee tripped on a rock on the road and fell striking his right hand on a rock, cutting his hand through his gloves
2011 · 2 incidents
Employee was cutting belt with bad splice with left hand due to his Right hand being broken (none work injury). Knife slipped while trimming belt and struck him in his right leg causing a deep cut
While moving rock from stope to crusher staging area a rock fell out of the bucket. On returning he did not see the rock and ran over it causing him to loose control and hit the rib with his bucket. The jarring motion caused his leg to hit the wall of the cab.
2010 · 2 incidents
While moving the Cat excavator 315 across a small ditch the rocking motion of the machine caused employee to experience a back spasm not allowing him to move.
While stepping from excavator, when his left foot went in a hole, knee popped causing him to fall on his right knee.
2009 · 2 incidents
While exiting truck, stepped on rock and it rolled under his foot, twisted his knee.
Going up stairs to clear c-10 conveyor. Shut down plant, twisted knee on stairs hurrying to shut down wash plant.
2008 · 1 incident
Just finished hand scaling and was bent over when a small rock fell from the face hitting him in the lower back.
2007 · 2 incidents
EE was hand scaling from manlift on GM Topkick powder truck. When he went to reposition, a piece of rock approx the size of a soccer ball/plate came loose falling approx 8' - 10' and clipped the back of his hard hat. EE had a sore head/neck and was taken to the Medical Center to get checked out. He was treated with cold compress.
During course of shift, EE alleges to have twisted his back while running a loader. He cannot recall a particular event that caused the injury.
2006 · 1 incident
Removing belly pan from 980F loader, belly pan slipped off jack.
2003 · 2 incidents
EE ALLEGES HE STRUCK POTHOLE IN ROADWAY, JARRING HIS BACK. WHILE HAULING FORM THE MUCK PILE TO THE PRIMARY CRUSHER.
EMPLOYEE ALLEGES TO BE SUFFERING FROM CARPAL TUNNEL SYNDROME IN BOTH HIS WRIST. HE NORMALLY RUNS A DRILL AND PERFORMS HAND AND EQUIPMENT SCALING, EMPLOYEE CLAIMS HIS HANDS HAVE BEEN BOTHERING HIM SINCE LAST SUMMER, HE FINALLY WENT TO A DOCTOR IN JAN.
2001 · 1 incident
EE WAS GETTING IN SHOVEL & PINCHED THUMB IN DOORHINGE. EE'S LEFT HAND WAS BRACED ON DOOR JAM & WAS CAUGHT WHILE CLOSING CAB DOOR
2000 · 1 incident
A ROCKFALL OCCURRED ON THE PILLAR AT THE INTERSECTION OF 4E & 6N. THE ROCKFALL MEASURED APPROX 14' X 6' X 5'. THE FALL HAPPENED SOMETIME OVER THE WEEKEND.
1999 · 1 incident
A ROCKFALL OCCURED ON MAIN ST AND 9-N PILLAR. 5X8' SPLITSETS WERE IN THE ROCK FALL, MEASUREMENT OF THE DRILL HOLES INDICATED DRILL HOLES WERE DRILLED TOO LARGE FOR SPLITSETS.
1998 · 2 incidents
EE WAS WALKING IN THE MINE WHEN HE BEGAN TO HAVE CHEST PAINS, SWEATING AND DISCOMFORT. HE WAS TAKEN TO VASSAR HOSPITAL AND IS UNDOING TEST.
A ROOF INTERSECTION FELL. THE AREA HAD BEEN BERMED OFF TO PREVENT WORKERS FROM ENTERING THE AREA.
1997 · 2 incidents
A 7'X3' ROCK FELL FROM THE ROOF AT THE MAGAZINE AREA.
EE WAS MARKING OUT A DRILL PATTERN. WHILE WALKING ACROSS THE FACE HE STEPPED INTO A WATER HOLE AND TWISTED HIS BACK.
1996 · 1 incident
ALL EE GATHERED C MINE OPENING FOR THE DAYS BLAST. AT THE IMINUTE COUNTDOWN. EE TOOK LEAD IN LINE BACK TO MAGAZINE. I YELLED FIRE IN THE HOLE WAITED 5 SECONDS AND DETONATED SHOT. EE DID NOT HA VE HIS HEARING PROTECTION ON AND THE AIR BLAST HURT HIS EARS.
1995 · 1 incident
EE WAS OPERATING A HYDRAULIC EXCAVATOR - USED FOR SCALING WHEN THE HAMMER SLID OFF A ROCK & JOLTED THE CAB. HE STRAINED HIS LOWER BACK. EE STATAED HE WAS O.O. BUT SEVERAL WEEKS LATER HIS BACK BOTHERED HIM AGAIN. HE THEN WENT TO THE DOCTOR &TOLD HIS SUPERVISOR.